HomeMy WebLinkAboutAnnual Review 12.13.2019 GV 82-5TE
ii
ENERGY PARTNERS
December 13, 2019
Garfield County Building and Planning
Attn: Sheryl Bower
108 8th Street, Suite 401
Glenwood Springs, CO 81601
TEP Rocky Mountain LLC
1058 County Road 215
Parachute, CO 81635
RE: Land Use Change under Major Impact Review — Resolution 2010-08
2019 Annual Report - GV 82-5 pad location
Township 7 South, Range 95 West, 61h P.M.
Section 5: NW1/4SE'/4
Garfield County, Colorado
Dear Ms. Bower:
Per the conditions of approval listed in the Resolution 2010-08 associated with the GV 82-5 pad
location:
9. The Applicant shall be required to submit a report annually, until such time as the well purl
is released from the COGCC reclamation bond, of the extraction and processing operation,
for staff review. Upon revietiv of any deficiencies pursuant to conditions of approval or other
local, state, or federal permits, Staff may forward the report to the County Commissioners for
fill revietiv of the Special Use Permit.
On the GV 82-5 location, normal operations occurred this year which include the following:
• 05/13/2019 GV 82-5 Pad Pre -emergent Treatment
• 03/29/2019 PA 424-5 Well Work -over: Tubing Issue
There was no reclamation activity on this pad for 2019.
TEP personnel and contractors continually monitor and maintain production equipment, water
removal, and production as needed.
TEP has reviewed the conditions set forth in the Major Impact Review and remains compliant under
the conditions of the resolution listed above.
After review of this annual report, please call me at (970) 263-2754 (0) or (970) 361-2006 (C) if any
additional information is needed.
Sincerely,
TEP Rocky Mountain LLC
Bryan S. Hotard
Surface Team Lead — Piceance Basin