Loading...
HomeMy WebLinkAboutAs-built Engineer's Report 11.20.2019II"ZiT IV IE1H J. BROTSK i r PE — — 558 RIO OSO LANE GRAND JUNCTION, CO 81607, CONSULTING ENGINEER 970 216 8881 November 20, 2019 Re: Certification Letter & "AsBuilr' On -Site Wastewater Treatment System TBD, (Tract 23) CR 237 Silt, CO To Whom It May Concem: This is to Advise that inspections were made during construction of the above referenced OWTS and that the system has been constructed essentially In accordance with the approved Plans and Specifications, except that the Owner decided to move the house farther to the west making It necessary to locate the tank and absorption bed to the south as shown. Ties from the house corners to the septic tank and manifold tee, are shown on the attached "Construction Plan of Record". Additionally. risers on the septic tank and the south end of the absorption bed further mark their location . The well is more than 100' from the absorption bed. TB - CR 247 TRACT 23 SILT , COLORADi GARFIELD COUN' 1000 GALLON . SEPTIC TANK :'•� PLASTIC 2 RISERS ABOVE �eC GRADE • • 4 ROWS INFILTRATORS 5' INFILTRATORS .^ 12 EACII ROW + 60 TOTAL = 62' LONG SITE PLIC CONSTRUCTION PL OF RECORD ON-SITE WASTEWATER TR SYSTEM (OWTS) } • c is INSTALLED BY : J. CALIBER CONSTRUCTION ; t