Loading...
HomeMy WebLinkAboutEngineer's Letter - Revisions to Roof Framing 02.11.2020Calvetti Engineering, Inc. Andrew L. Calvetti. P.E. P.O. Box 4231 Aspen, Co. 81612 Ph / Fax 970-925-8969 Email:alcengrg@aol.com 2/11 /20 Garfield County Colorado Community Development Building Inspections 1088th St Glenwood Springs, Colorado 81601 Phone (970) 945-1377 Ext 1621 Attn: Bldg Inspector Re: Permit # BLRE 06-19-5804 / 259 Blue Stem Court / Carbondale, Colorado 81623 / Cerise Ranch Subd / Roof Framing Revisions at proposed overhang Building Inspector: This letter is being written at the request of Mr. David Brown, Record Architect of the above referenced project to review a select framing issue which was revised from the initial permit submittal and approval. The following item has been reviewed and approved by myself: 1) The framing of the roof overhang at the has been revised from 18 inch cantilever overhang with 2 x 6 outlookers at 16 inch o.c. to 36 inch long 2 x 8 outlookers at 16 inch o.c. at the shedb dormers only. The remainder of the overhangs is the typical 18 inches previously shown on the permit plans. Please review this revised framing when the overall building framing is inspected on-site. Should you have any further questions, please call or write. Sincerely, Andrew L C vetti, P.E. CO CC: Mr. David Brown, Arch of Record 225 N Mill Ste # 225 Aspen, Colorado 81611 Ph (970) 379-4100 (c) Email: david@strykerbrown.com . Chance Soldoff, GC Resort Building, LLC Glenwood Springs, CO Ph (970) 309-5740 Email: soldoff5@aol.com