Loading...
HomeMy WebLinkAboutDriveway PermitGarfield County Application for Driveway Permit Person Obtaining Permit: Dustin & Tara Cheney Application Date: 3/30/2020 County Road Number: 313 District: Silt Permit Number: GRB20-D-3 Termination Date: 6/28/2020 Inspector: Dale Stephens hereby requests permission and authority from the Board of County Commissioners to construct a driveway approach (es) on the right-of-way off of County Road, 313,1500' +l- South of 8800 CR 313, Located on the BM side of road for the purpose of obtaining access to property. Applicant submits herewith for the consideration and approval of the Board of County Commissioners, a sketch of the proposed installation showing all the necessary specification detail including: 1. Frontage of lot along road. 2. Distance from centerline of road to property line. 3. Number of driveways requested 4. Width of proposed driveways and angle of approach. 5. Distance from driveway to road intersection, if any. 6. Size and shape of area separating driveways if more than one approach. 7. Setback distance of building(s) and other structure improvements. 8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision expense. 9. Responsible for two years from the date of completion. General Provisions 1) The applicant represents all parties in interest, and affirms that the driveway approach (es) is to be constructed by him for the bona fide purpose of securing access to his property and not for the purpose of doing business or servicing vehicles on the road right of way. 2) The applicant shall furnish all labor and materials, perform all work, and pay all costs in connection with the construction of the driveway(s), A11 work shall be completed within ninety (90) days of the permit date. 3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the Board of County Commissioners or their representative. 4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board of County Commissioners and their duly appointed agents and employee shall be held harmless against any action for personal injury or property damage sustained by any reason of the exercise of the Permit. 5) The Applicant shall assume responsibility for the removal or clearance of snow, ice, or sleet upon any portion of the driveway approach (es) even though deposited on the driveway(s) in the course of the County snow removal operations. 6) In the event it becomes necessary to remove any right-of-way fence, the posts on either side of the entrance shall be surely braced before the fence is cut to prevent any slacking of the remaining fence and all posts and wire removed shall be turned over to the District Road Supervisor of the Board of County Commissioners. 7) No revisions or additions shall be made to the driveway(s) or its appurtenances on the right-of-way without written permission of the Board of County Commissioners. 8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and incorporated herein as conditions hereof. 9) Final inspection of driveway will be required upon completion and must be approved by person issuing permit or representative of person issuing permit. The inspection and sign off must be done prior to any CO from the Building and Planning Department being issued. Special Conditions: 1. Driveway Width- 40ft 2. Culvert required? False Size: N/A by N/A 3. Asphalt or concrete pad required? False Size of pad: N/A 4. Gravel portion required? True Length: 100ft 5. Trees, brush and/or fence need to be removed for visibility? True 6. Distance and Direction:20 feet to the North and South 7. Certified Traffic Control Required? False S. Work zone signs required? True In signing this application and upon receiving authorization and permission to install the driveway approach (es) described herein the Applicant signifies that he has read, understands and accepts the foregoing provisions and conditions and agrees to construct the driveways) in accordance with the accompanying specification plan reviewed and approved by the Board of County Commissioners. Address: ,3 d Ct 7,53 �s (AS[bi5"� 'Telephone Number: 4( - -57 - 5�-5 Permit granted 3/30/2020, subject to the provisions, specifications and conditions stipulated herein. For Board of County Commissioners' of Garfield County, Colorado: QomArN Representative of Garfield County Road and Bridge Signature