HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-02-20-6128 and SEPT-02-20-6129
Ryan and Lisa Locke
New Single -Family Residence
329 County Road 216 — Rifle, Colorado
Sun Meadow Estates, Lot 10
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)
AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 1,500 P.S.F.
SOILS BEARING CAPACITY. GEOTECHNICAL ENGINEER SHALL ALSO VERIFY PLACEMENT
OF COMPACTED STRUCTURAL FILL BELOW FOUNDATION FOOTINGS AS PER THE SOILS
REPORT RECOMMENDATIONS. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING
INSPECTOR REVIEW AT FOOTING INSPECTION.
4) SEPTIC SYSTEM REVIEW & APPROVALS ARE PERFORMED BY GARFIELD COUNTY'S PUBLIC
HEALTH DEPARTMENT. PROVIDE FINAL APPROVAL & SIGN -OFFS FROM PUBLIC HEALTH
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
5) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.