H EPWORTH - PAWLAK GEOTECHNICAL
October 22, 2007
Oary Krill
P.O. Box 143
Woody Creek, Colorado 81656
To:197892 3a39 P. 2/8
lttl•,i.xilh tonl,rliiuruhint d, In.
50:11 t v.rntr; tt.u.t i '4
Cilriia.%ti.l Si„ingi, t'.4(NJllt. Nlhl11
Phi 9]a194S 7SIh1
En Q70.'i4+ N4i4
molt (I ahitget Ii i,uu
Job No.107 0775
Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot 94, Filing
7, Elk Springs Subdivision, Elk Springs Drive, Garfield County, Colorado
Dear Mr. Krill:
As requested, Hepworth-Pawtak Geotechnical, Inc. performed a subsoil study for design
of foundations at the subject site. The study was conducted in accordance with our
agreement for geotechnical engineering services to you dated September 25, 2007. The
data obtained and our recommendations based on the proposed construction and
subsurface conditions encountered are presented in this report. Hepworth-pawlak
Geotechnical Inc., previously perfiormed a preliminary geotechnical study for Filings 6
through 9 ofthe Elk Springs subdivision (formerly Los Amigos Ranch PUD) and
presented our fundings in a report dated February 14, 1997, Job No. 196 617.
Proposed Construction: The proposed residence will consist of a single story wood
frame structure ever a partial basement and partial crawlspacc. The attached garage and
basement floors will be slab -on -grade. Cut depths are assumed to range between about 3
to 8 feet. Foundation Loadings for this type of construction are relatively light and typical
of the proposed type of construction.
If building conditions or foundation loadings are significantly different Gam those
described above, we should be notified to re-evaluate the recommendations presented in
this report.
Site Conditions: Lot 94 is located on the uphill, northwest side of Elk Springs Drive and
was vacant at the time ()four field exploration. There is an existing dry drainage in the
northern portion ofthe lot. The ground surface in the building envelope is relatively flat
with a strong slope down; to the east at a grade up to about 12%. There is about G to 8 feet
of elevation difference across the building area. Vegetation consists of sagebrush, grass
and weeds. Cedar trees are located in the existing drainage.
Subsurface Conditions; The subsurface conditions at the site were evaluated by
excavating three exploratory pits at the approximate locations shown on Figure 1. The
logs of the pits are presented on Figure 2. The subsoils encountered, below about 1 foot
of topsoil, consist of 3 to 6% feet of medium stiff to stiff, sandy silty clay. Relatively
dense, basalt gravel, cobbles and boulders in a sandy silt matrix were encountered
beneath the clay soils at depths between 4 and 7% feet. Results of swell -consolidation
testing performed on relatively undisturbed samples ofthe clay soils, presented on Figure
Parker 103.841-7119 • Colorado Spnngs 719-633-5562 • Silveri -home 970.468- f 9N9
OCT -29-2007 15:45 Fr om: HP-LIECt i CH 9709458454
-2-
To:19709 8 P.3'8
3, indicate low compreeehility fonder existing moisture conditions and light loading and a
low collapse potential (settlement under constant load) when wetted. The samples
showed high compressibility upon increased loading after westing. No free water was
observed in the pits at the time of excavation and the soils were slightly moist to moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for as allowable soil bearing
pressure of 1,500 psf for support of the proposal residence. The upper -finer grained soils
and matrix soils are compressible after wetting and there could be some post -construction
foundation settlement ifthe bearing soil become wet. Care shoukd be taken to prevent
wetting of the bearing sots as described later in this report. The settlement could be
differential between footings bearing on the upper fines graded soils and footings bearing
on the basalt TO ck soils. Footings should be a minimum width of 16 inches for continuous
walls and 2 feet for columns. Loose and disturbed soils encountered at the foundation
bearing level within the excavation should be removed and the finning bearing level
extended down to the undisturbed natural soils. Excavations into the basalt rode snits
may require rock excavating techniques such as blasting and chipping. Voids created
from boulder removal at footing grade should be backfilled with compacted sand and
gravel, such as road base, or with concrete. Exterior footing should be provided with
adequate cover above their bearing elevations for f% potation. Placement of footings
at least 36 inches below the exterior grade is typically used in this area. Continuous
foundation wails should be reinforced top and bottom to span focal anomalies snub as by
assuming an unsupported length of at least 12 fleet. Foundation walls acting as retaining
structures should be designed to resist a lateral earth pressure based on an equivalent fluid
unit weight of at least 50 pcf for the on-site soil, excluding vegetation, topsoil or
oversized rock, as backfill.
Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly
loaded slab -on -grade construction. The clay and basalt matrix soils are compressible
when wetted and there could be some slab settlement and distress if the bearing soils
become wet. To reduce the effects of some dill movement. floor slabs should be
separated from all bearing walls and columns with expansion joints which albw
unrestrained vertical movement. Floor slab control joints should be used to reduce
damage due to stainkago cracking. The requirements fbr joint spacing and slab
reinforcement should be established by the designer based on experience and the intended
slab use. A minimum 4 inch layer of free -draining gravel should be placed beneath
basement level slabs to facilitate drainage This material should consist ofminua 2 inch
aggregate with leas than 50% passing the No. 4 sieve and less than 2% passing the No.
200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor density at a moisture content near optimum. Required fill can
consist of the on-site soils or a suitable imported material such as road base devoid of
vegetation, topsoil and oversized rock.
TJnderdraln System: Although free water was not encountered during our exploration, it
has been our experience in the area that local perched groundwater can develop during
Job No.107 0775
OCT -29-2007 15:45 From:HP-620TECH 9709458454
- 3 -
To:19709203036 P.4/8
times of heavy precipitation or seasonal runoff FrOzeat ground during spring runoffcan
create a perched condition. We recommend below -grade construction, such as retaining
wails, crawispace and basement areas, be protected from wetting and hydrostatic pressure
buildup by an underdrain system.
The drains should consist of drainpipe placed in the bottom ofthe wall backfill
stmmunded above the invert level with free -draining granular material. The drain should
be placed at each level of excavation and at least 1 frot below lowest adjacent finish
grade and sloped at a minimum 1% to a suitable gravity outlet. Frey -draining granular
material used in the underdrain system should contain less than 2% passing the No. 200
sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inch. The
drain gravel backfill should be at least 1% feet deep.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation ofthe foinedation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95% ofthe maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas. Free -draining wall backfill should be
capped with about 2 &.et ofthe onsite, finer graded soils to reduce suriircee
water infiltration.
3) The ground surface surrounding the exterior ofthe building should be
sloped to drain away from the foundation- in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
area and a minimum slope of 3 inches in the first 10 fret in pavement and
walkway areas.
4} Roof downspouts and drains mould discharge well beyond the limits of all
backfill.
5) Irrigation sp rinlclrr heads and landscaping which requires regular heavy
irrigation, such as sod, should be located at least 5 feet from foundation
walls.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either express or implied. The conclusions and recommendations submitted in
this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Figure 1 and to the depths shown on Figure 2, the proposed type of
construction, and our experience in the area. Our services do not include determining the
presence, prevention or possibility of mold or other biological contaminants (MOBC)
developing in the inure. If the client is concerned about MOBC, then a professional in
this special field of practice should be consulted. Our findings include interpolation and
extrapolation of the subsurface conditions identified at the exploratory pits and variations
in the subsurface conditions may not become evident until excavation is performed. If
conditions encountered during construction appear different from those described in this
Job No.107 0775
OCT -29-8007 15:46 From:HP-COIECH 3709458454 To:19709203038
-4-
report, we should be notified at once so re-evaluation ofthe recommendations may be
made.
P.5r8
This report has been prepared 1r the eacluaive use by our client for design purposes. We
aro not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field =vices during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
ogee may require additional analysis or modifications to the recommendation
presented herein. We recommend on-site observation of excavations and Sawtdation
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance please let us know.
Respectfully Submitted,
IHEPWDRTH - PAWLAIC GEOTECHNICAL, INC.
JonIy Z. Adamson, Jr., P.E.
Reviewed by:
Daniel E. Hardin, P.B.
JZAilcsw
attachments Figure 1 —Location ofExploratory Pits
Figure 2 — Logs ofExploratory Pits
Figuro 3 — Swell -Consolidation Test Results
OCT -29-2007 15:96 From:HP-GEOTECH 979943E1454 To:19709203038 P.6'8
t
APPROXIMATE SCALE
1"=BO'
107 0775 I
LOT 93
1000
7'w
/
... OW4t4t
� -PIT 91
PIT1
PIT3
■
990
PROPOSED
RESIDENCE
1 1
1 1
1 1
t t
LOT 94 1 1
FILING 1
1 1
1
1 1
1 1
1 1
1 1
1 1
1 1
HICAIKOMWOIEIVICILL
1000
1
900
LOCATION OF EXPLORATORY PITS
IFigure 1
IOCT -29-2007 15:46 From:HP-GEOTECH
9709458454
Ta:197092038 P.7/8
- 0
•
- 5
i__... 10
LEGEND:
"77•70
PIT 1
ELEV.- 989'
WC- 11.1
00 ••73
PIT 2
ELEV.za 992
—7
v✓
WC•41.6
DDT
PIT 3
ELEV.s 998'
0
5
•
10-- -.
TOPSOL: sandy silty day, organics, roots, flrrn, slightly moist, dark brown.
CLAY (CO: siftY, sandy, medium el lff to stiff, slightly moist to moist, brown to reddish brown, calcareous.
BASALT {RAVEL AND COBBLES (GM); in a sandy silt mabrbc, with boulders, deme, silghdy moist, light brown
to white, caicareoue.
is) 2' Diameter hand driven line' sempts.
NOTES:
1. Exploratory pits were excavated an October 10, 2007 with a mini -excavator.
2. Locations of satploratory pits were measured approxlrnateiy by paaing from features shown on the aifa dart
provided.
3. Elevations of eocpioi atory pits were gained by interpolation between contotae shown on the site pian provided.
Logs are drawn to depth.
4. The exploratory pit locations and elevations should be consldemd accurate only to the degree implied by the method
used.
5. The lines between materlaia shown on the exp*uratory pit lows represent the approximate bourldasies between
material types and transitions may be gradual.
8. No free water was encountered In the pits at the time of excavating. Ructuetlon in water level may occur with time.
7. Laboratory Testing Results:
WC Water Content (%)
DD Dry Density (pct)
107 0775agilegli
LOGS OF EXPLORATORY PITS Figure 2
OCT -29-2007 15:46 Fr om: HP-COTECH
97994454
To:19709203038
P.8'$
0
1
2
4
5
7
Moisture Content - 11.1 percent
Dry Density = 73 pd
Sample o1: Sandy Silty Clay
From: Pit 1 of 4 Feet
Compression
upon
welting
8
0.
0
1
2
5
6
7
a
.0 10 100
APPUED PRESSURE - knr
Moisture Content as 8.5 patent
Dry Density mg 83 Peg
Sample 01: Sandy Silty Clay
r From: Pit 2 at 4 Feet
Compression
weltfng
0.1
107 0775 c SWELL -CONSOLIDATION TEST RESULTS Figure 3
1.0 10
APPLIED PRESSURE - kSf
100
-29-2007 15:45 From:HP-CEOTECH 9709458454
G&tech
FAX TRANSMITTAL FORM
DATE: 16,- 2.1 -b7
TO: (itri.) 4i 1
FROM: eit+KI le/nt.e)(-
Number of Pages:
MESSAGE:
lincludfri�this page)
To:19709203058 P.1/8
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
5020 County Road 154
Glenwood Springs. Colorado 81801
Phone: 970-945-7988
Fax: 870-945.9454
e-md: hpgeo@hpgeoteeh-cam
PROJECT NO.:
FAX NO: 92079/16./-618
The original of this transmittal will be sent by:
Ordinary Mall is•
Fax Only 1i
Overnight
Other Si
The information contained in this facsimile message is confidential and intended for the sole use of the
individual named above. If you are not the intended recipient, received this communication in error, or if
problems occur with transmission, please notify us at 970-945-7988. •
Sent By: