Loading...
HomeMy WebLinkAboutInterior Lighting Compliance Certificate 10.18.2019COMcheck Software Version 4.1.1.0 1 I 1i1 ft Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Additional Efficiency Package(s) Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B X C) 1 -Manufacturing Facility 19100 1.05 20112 Proposed Interior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Total Allowed Watts = 20112 B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. 1 -Manufacturing Facility LED 1: R1: Other: LED 3: R3: Other: LED 4: S2: Other: LED 5: S3: Other: LED 6: S4.4: Other: LED 7: S4.8: Other: LED 8: W1: Other: LED 9: S1: Other: Exemption:Plant Growth Lighting 1 39 21 819 1 28 19 535 1 259 40 10412 1 69 38 2656 1 19 10 198 1 12 21 250 1 4 20 80 1 621 1045 Exempt Total Proposed Watts = 14949 nterior Lighting PASSES: Design 26% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1. and to comply with any applicable mandatory requirements listed in the Inspection Checklist. JESSICA WOODY - ELECTRICAL ENGINEER Name - Title Signatu 10/18/2019 Date Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 1 of 7 COMcheck Software Version 4.1.1.irdt0 Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 2015 IECC New Construction 1 (Developed rural area) Owner/Agent: Designer/Contractor: Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts / Unit Wattage (B X C) Walkway (Walkway < 10 feet wide) Tech Doors (Other door (not main entry)) 1226 ft of 0.7 Yes 858 36 ft of door 20 Yes 720 Total Tradable Watts (a) = 1827 Total Allowed Watts = 1827 Total Allowed Supplemental Watts (b) = 500 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 500 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Parking ( Parking area 6222 ft2): Tradable Wattage Walkway ( Walkway < 10 feet wide 1226 ft of walkway length): Tradable Wattage LED 1: ZB1: BOLLARDS: Other: Tech Doors ( Other door (not main entry) 36 ft of door width): Tradable Wattage LED 2: ZW1: WALLPACK: Other: 1 1 4 22 88 5 125 623 Total Tradable Proposed Watts = 711 xterior Lighting PASSES: Design 69% better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1. and to comply with any applicable mandatory requirements listed in the Inspection Checklist. JESSICA WOODY - ELECTRICAL ENGINEER Name - Title Signatu e 10/18/2019 Date Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 2 of 7 rft. v COMcheck Software Version 4.1.1.0 II Inspection Checklist Energy Code: 2015 IECC Requirements: 64.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Req.ID Plan Review Complies? Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. •Complies •Does Not ❑Not Observable •Not Applicable pp e C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. •Complies ❑Does Not •Not Observable ❑Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. ❑Complies ■Does Not Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 3 of 7 Section # & Req.ID Rough -In Electrical Inspection Complies? Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least •Complies Exception: Areas such as security or emergency areas that need continuous lighting. •Does Not 50%. •Not Observable •Not Applicable C405.2.1 IOccupancy sensors installed in •Complies Requirement will be met. [EL18]1 required spaces. •Does Not •Not Observable •Not Applicable C405.2.1, Independent lighting controls installed •Complies Requirement will be met. C405.2.2. per approved lighting plans and all I■Does Not 3manual [EL23]2 controls readily accessible and ❑Not Observable visible to occupants. •Not Applicable C405.2.2. Automatic controls to shut off all •Complies Requirement will be met. 1 building lighting installed in all •Does Not [EL22]2 buildings. ❑Not Observable ❑Not Applicable '.3 Daylight zones provided with individual controls that control the lights independent of general area lighting. •Complies Requirement will be met. •Does Not Not Observable ❑Not Applicable C405.2.3, Primary sidelighted areas are •Complies Requirement will be met. C405.2.3. equipped with required lighting •Does Not 1, controls. •Not Observable C405.2.3. ■Not Applicable 2 [EL20]1 C405.2.3, Enclosed spaces with daylight area •Complies Exception: Requirement does not apply. C405.2.3. under skylights and rooftop monitors •Does Not 1, are equipped with required lighting ■Not Observable C405.2.3. controls. ■Not Applicable 3 [EL21]1 C405.2.4 Separate lighting control devices for •Complies Requirement will be met. [EL4]1 specific uses installed per approved lighting plans. •Does Not •Not Observable •Not Applicable C405.2.4 Additional interior lighting power •Complies Requirement will be met. [EL8]1 allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. ■ Does Not •Not Observable •Not Applicable C405.2.5 Automatic lighting controls for exterior •Complies Requirement will be met. [EL25]nu° lighting installed. Controls will be daylight controlled, set based on business operation time -of -day, or reduce connected lighting > 30%. •Does Not •Not Observable ■Not Applicable C405.3 I Exit signs do not exceed 5 watts per •Complies Requirement will be met. [EL6]1 face. •Does Not •Not Observable ■Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 'Medium Impact (Tier 2) 13 I Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 4 of 7 1 High Impact (Tier 1) 2 'Medium Impact (Tier 2) _1 3 I Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 5 of 7 Section # & Req.ID Final Inspection Complies? Comments/Assumptions C303.3, 'Furnished O&M instructions for •Complies C408.2.5. systems and equipment to the •Does Not 2 building owner or designated representative. •Not Observable [F117]3 ■ Not Applicable C405.4.1 Interior installed lamp and fixture •Complies See the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. •Does Not •Not Observable •Not Applicable C405.5.1 Exterior lighting power is consistent •Complies See the Exterior Lighting fixture schedule for values. [F119]1 with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. •Does Not ■Not Observable :•Not Applicable C408.. Furnished as -built drawings for ❑Complies 1 electric power systems within 90 days ❑Does Not [F116]3 of system acceptance. •Not Observable ■Not Applicable C408.3 Lighting systems have been tested to ;■Complies [F133]1 ensure proper calibration, adjustment, programming, and operation. •Does Not •Not Observable •Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 'Medium Impact (Tier 2) 13 I Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 6 of 7 Project Title: Report date: 10/18/19 Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Page 7 of 7