HomeMy WebLinkAboutCorrespondence for AMD to Manufactured HomeFrom: )odv Daniels
To: Lindsay Krol
Subject: [External] Quicksilver ct
Date: Wednesday, April 22, 2020 6:39:29 AM
I have a building permit for lot 6 that was approved last winter. But the economy has
made me rethink the home i had designed for that lot. I would like to replace that
home you approved to be moved to lot 5.
In the meantime I need to make an application for an IRC modular home for lot 6 in
the exact location you approved already.
What would be the process to do this so i dont lose my costs in the last building
permit, which i still intend to do but put build that home on lot 5.
Sent from my Verizon, Samsung Galaxy smartphone
From: Jody Daniels
To: Lindsay Krol
Subject: Re: FW: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
Date: Monday, May 11, 2020 11:19:29 AM
Here you go. Van was to send this. He will mail $400 check today for lot 6.
Lot 5 will have to come when sgm has design confirmed from soils report. Eventhough iam
moving lot 6 approvals to lot 5,I have to make.sure past Sgm design criteria he used for lot 7
and 6 Thanks
Should I send the 123 for the owst before lot 5 is finalized ? I know you like complete file
before submitting.
Lot 6 was just a home and foundation change so all the other fees were paid . Yes no??
Sent from my Verizon, Samsung Galaxy smartphone
Original message
From: Lindsay Krol <lkrol@garfield-county.com>
Date: 5/11/20 11:01 AM (GMT -07:00)
To: Jody Daniels <ghdgrowit@aol.com>
Subject: Re: FW: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
Unfortunately the application will go into the queue which is first come first serve and right
now our review time is running about 14-20 business days. As soon as it is ready, I will let you
know.
Please make sure to email me the completed application forms for the building permit and
septic permit so that review time doesn't run any longer.
Thanks!
From: Jody Daniels <ghdgrowit@aol.com>
Sent: Monday, May 11, 2020 10:57 AM
To: Lindsay Krol <Ikrol@garfield-county.com>
Subject: Re: FW: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
Ok. That's a lot of days for a simple modular foundation.
Sent from my Verizon, Samsung Galaxy smartphone
Original message
From: Lindsay Krol <lkrol@garfield-county.com>
Date: 5/11/20 10:50 AM (GMT -07:00)
To: Van Sea <vansea16@gmail.com>, Jody Daniels <ghdgrowit@aol.com>
Subject: Re: FW: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
Good Morning Jody
I talked to Van on the phone this morning regarding fees due for the building and septic
permit applications. BUT I want to make sure to address your request for approval of your
foundation.
You won't be able to pour any concrete until your building permit has been approved for Lot
6, that is going to take at least 14-20 business days.
Let me know if you have any other questions.
Thanks!
From: Van Sea <vansea16@gmail.com>
Sent: Monday, May 11, 2020 9:12 AM
To: Lindsay Krol <Ikrol@garfield-county.com>
Subject: Fwd: FW: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
This is from Jody. I have a check for you, I'll need to know how much.
Let me know when you can please.
Van
970.987.3344
Forwarded message
From: Jody Daniels <ghdgrowit@aol.com>
Date: Mon, May 11, 2020, 7:40 AM
Subject: FW: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
To: Van Sea <vansea16@gmail.com>
Here is lindsay email. I am doing the change to lot 6 now and lot 5 will come after
sgm does septic soil test, but tell her I need an approval on lot 6 foundation
etc.because concrete guy is still available . Thanks
Sent from my Verizon, Samsung Galaxy smartphone
Original message
From: Lindsay Krol <lkrol@garfield-county.com>
Date: 5/6/20 12:57 PM (GMT -07:00)
To: Jody Daniels <ghdgrowit@aol.com>
Subject: RE: [External] Daniels.change to lot 6 quicksilver ct.subdivision
Good Afternoon Jody
Lot 5
• Fill out attached OWTS form and provide engineer's design report for septic system for
this lot. Application fee $123.00.
• Provide a site plan showing where the modular is going to be placed on this lot.
Lot 6
• Fill out attached Manufactured home form. Plan review fee is $400.00
Once we receive the requested information and payment of fees for both lots we can begin
review of the building permit for Lot 6 and review of the OWTS permit for Lot 5.
From: Jody Daniels <ghdgrowit@aol.com>
Sent: Saturday, May 2, 2020 6:19 PM
To: Lindsay Krol <lkrol@garfield-county.com>
Subject: [External] Daniels.change to lot 6 quicksilver ct.subdivision
Please see attached IRC Bonnavilla home that I will be building now instead of.the
approved stick built home . I attached plans of home and engineered stamped
drawings. All other issues with regards to septic and Ieachfield has not.changed, due
to this unit is also a 3 bedroom unit . Let me know about revised building permit
changes and or costs. Impact fees should be the same ? This home is located in the
exact location as stick built was going to be.
Thanks
Sent from my Verizon, Samsung Galaxy smartphone
From: )odv Daniels
To: Lindsay Krol
Subject: Re: Fw: [External] Jody Daniels - Quicksilver Court Sub.
Date: Tuesday, May 12, 2020 9:51:30 AM
Makes sense
Thanks
Sent from my Verizon, Samsung Galaxy smartphone
Original message
From: Lindsay Krol <lkrol@garfield-county.com>
Date: 5/12/20 9:38 AM (GMT -07:00)
To: Jody Daniels <ghdgrowit@aol.com>
Subject: Re: Fw: [External] Jody Daniels - Quicksilver Court Sub.
You would forfeit any fees paid after 6 months but you can generally request one extension
which would extend you for another 6 months. But you have to remember to contact us after
the initial 6 months has passed to request your one extension.
From: Jody Daniels <ghdgrowit@aol.com>
Sent: Monday, May 11, 2020 4:44 PM
To: Lindsay Krol <Ikrol@garfield-county.com>
Subject: RE: Fw: [External] Jody Daniels - Quicksilver Court Sub.
Do I loose all my fees after 6mos?
Sent from my Verizon, Samsung Galaxy smartphone
Original message
From: Lindsay Krol <lkrol@garfield-county.com>
Date: 5/11/20 4:30 PM (GMT -07:00)
To: Jody Daniels <ghdgrowit@aol.com>
Subject: Fw: Jody Daniels - Quicksilver Court Sub.
Jody
Andy, our chief building official indicated that we would hold the permit for 6 months from
today before it expires.
From: Andy Schwaller <aschwaller@garfield-county.com>
Sent: Monday, May 11, 2020 3:53 PM
To: Lindsay Krol <Ikrol@garfield-county.com>; Dave Argo <dargo@garfield-county.com>
Subject: RE: Jody Daniels - Quicksilver Court Sub.
We can hold it for 6 months before it expires. He will need to resubmit for the modular home and
we can work with him on the fees.
From: Lindsay Krol <Ikrol@garfield-county.com>
Sent: Monday, May 11, 2020 3:38 PM
To: Dave Argo <dargo@garfield-county.com>; Andy Schwaller <aschwaller@garfield-county.com>
Subject: Jody Daniels - Quicksilver Court Sub.
Talked to Jody about moving approved permit from Lot 6 to Lot 5. He isn't sure yet what he is
going to do with the approved permit for a stick -built home on Lot 6 because he is apparently
having a hard time finding a crew to build it. A modular is quicker and easier to build and that's
why he has abandoned the stick -built home and decided to go with a modular for Lot 6. Are
you okay with holding the approved permit until he decides what he is going to do and
allowing him to apply for a new permit on Lot 6 for a modular instead? He is not sure at this
point when he will be able to build the stick -built home.