HomeMy WebLinkAboutCompliance CertificatesCOMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
2015 IECC
Silt Farms
Silt, Colorado
5b
New Construction
13%
Construction Site: Owner/Agent:
County Rd 331 Charles Barr
Colorado River Road
Silt, CO 81652
Additional Efficiency Package(s)
Designer/Contractor:
Eric Kraai
KDA INC.
417 Monument Road
Suite 7
Grand Junction, CO 81507
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Building Area
Floor Area
1-F2 (Manufacturing Facility) : Nonresidential 41765
Envelope Assemblies
Assembly
Gross Area Cavity Cont. Proposed Budget U -
or R -Value R -Value U -Factor Factors.)
Perimeter
CFR Insulated Roof Panel: Other Metal Building Roof, [Bldg. Use 1 -
F2] (b)
1st Floor Slab: Slab-On-Grade:Unheated, [Bldg. Use 1 - F2] (d)
NORTH
Rated panel - ThermalSafe - MetlSpan: Other Exterior Wall, Heat
capacity 0.0, [Bldg. Use 1 - F2] (b)
Man Doors - TruDoor Flush-Mtl.: Insulated Metal, Swinging, [Bldg. Use
1 - F2]
Overhead Doors - 432 Series: Insulated Metal, Non -Swinging, [Bldg.
Use 1 - F2]
CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 -
F2] (b)
Mezzanine Windows - Kawneer 6400 Series: Metal Frame:Fixed, Peri.
Specs.: Product ID Cardinal Glass, SHGC 0.40, [Bldg. Use 1 - F2] (c)
EAST
CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 -
F2] (b)
Man Doors - TruDoor Flush-MtI.: Insulated Metal, Swinging, [Bldg. Use
1 - F2]
SOUTH
Rated panel - ThermalSafe - MetlSpan: Other Exterior Wall, Heat
capacity 0.0, [Bldg. Use 1 - F2] (b)
FireRated Windows - riretrames Tel': Metal Frame with Thermal
41765 0.026 0.035
970 • • 0.730 0.540
7279 0.044 0.064
42 0.310 0.370
80 0.136 0.179
2720 0.052 0.052
1235 0.380 0.380
2675 0.052 0.052
42 ••• 0.310 0.370
7279 0.044 0.064
734 --• 0.380 0.380
Project Title: Slit Farms Report date: 04/29/20
Data filename: P:\2012 - Spring Born\PROJECT DATA\2015 IECC ComCheck\2015 IECC Springborn.cck Page 1 of 9
Assembly
Gross Area Cavity Cont. Proposed Budget U -
or R -Value R -Value U -Factor Factor(.)
Perimeter
Break:Fixed, Peri. Specs.: Product ID Cardinal Glass, SHGC 0.40,
[Bldg. Use 1 - F2] (c)
Man Doors - TruDoor Flush-Mtl.: Insulated Metal, Swinging, [Bldg. Use
1 - F2]
Overhead Doors - 432 Series: Insulated Metal, Non -Swinging, [Bldg.
Use 1 - F2]
RoIIUp Door - FireKing: Insulated Metal, Non -Swinging, [Bldg. Use 1 -
F2]
CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 -
F2] (b)
Mezzanine Windows - Kwaneer 6400 Series: Metal Frame with Thermal
Break:Fixed, Pert. Specs.: Product ID Cardinal Glass, SHGC 0.40,
[Bldg. Use 1 - F2] (c)
WEST
CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 -
F2] (b)
Mezzanine Windows - Kawneer 6400 Series: Metal Frame with Thermal
Break:Fixed, Perf. Specs.: Product ID Cardinal Glass, SHGC 0.40,
[Bldg. Use 1 - F2] (c)
Man Doors - TruDoor Flush-Mtl.: Insulated Metal, Swinging, [Bldg. Use
1 - F2]
Overhead Doors - 432 Series: Insulated Metal, Non -Swinging, [Bldg.
Use 1 - F2]
126
240
56
2720
1235
2675
80
126
80
0.310 0.370
0.136 0.179
0.222 0.179
0.052 0.052
0.380 0.380
0.052 0.052
0.380 0.380
0.310 0.370
0.136 0.179
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b) 'Other' components require supporting documentation for proposed U -factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
Envelope PASSES: Design 1 I % better than code
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application, The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4 .1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
/'--"�
rrC ILrctai — L+ d -
Name - Title
Signature
Date
Project Title: Silt Farms Report date: 04/29/20
Data filename: P:\2012 - Spring Born\PROJECT DATA\2015 IECC ComCheck\2015 IECC 5pringborn.cck Page 2 of 9
irdt 1 COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
County Rd 331
Colorado River Road
Silt, CO 81652
Additional Efficiency Package(s)
Unspecified
2015 IECC
Silt Farms
Rifle, Colorado
5b
New Construction
Owner/Agent:
Charles Barr
Designer/Contractor:
Wesley Ploof
BG Buildingworks
1626 Cole Blvd, Suite 300
Golden, CO 80401
3032783820
wgploof@bgbuildingworks.com
Mechanical Systems List
Quantity System Type & Description
2 F-1,2 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 110 kBtu/h
Proposed Efficiency = 93.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Split System, Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1800 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade
1 F-3 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 110 kBtu/h
Proposed Efficiency = 93.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Split System, Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 2000 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade
22 UH -1 (Single Zone):
Heating: 1 each - Unit Heater, Gas, Capacity = 8600 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Fan System: FAN SYSTEM 3 -- Compliance (Brake HP method) : Passes
Fans:
FAN 3 Supply, Constant Volume, 495 CFM, 0.0 motor nameplate hp, 0.0 design brake hp (0.0 max. BHP), 0.0 fan efficiency grade
2 UH -2,4 (Single Zone):
Heating: 1 each - Unit Heater, Gas, Capacity = 23 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Fan System: FAN SYSTEM 4 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 5 Supply, Constant Volume, 750 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 1 of 17
Quantity System Type & Description
1 UH -3 (Single Zone):
Heating: 1 each - Unit Heater, Gas, Capacity = 5 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Fan System: FAN SYSTEM 5 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 6 Supply, Constant Volume, 270 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade
1 UH -5 (Single Zone):
Heating: 1 each - Unit Heater, Gas, Capacity = 21 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Fan System: FAN SYSTEM 6 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 7 Supply, Constant Volume, 1200 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade
2 UH -7 (Single Zone):
Heating: 1 each - Unit Heater, Electric, Capacity = 10 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 7 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 8 Supply, Constant Volume, 350 CFM, 0.0 motor nameplate hp, 0.0 fan efficiency grade
2 Plant 1:
Heating: Hot Water Boiler, Capacity 4000 kBtu/h, Gas
Proposed Efficiency: 93.00 % Ec, Required Efficiency: 82.00 % Ec
1 WH -3:
Gas Instantaneous Water Heater, Capacity: 0 gallons, Input Rating: 75 kBtu/h w/ Circulation Pump
Proposed Efficiency: 93.00 EF, Required Efficiency: 0.62 EF
1 WH -1:
Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 250 kBtu/h w/ Circulation Pump
Proposed Efficiency: 96.00 % Et, Required Efficiency: 80.00 % Et
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Wesley Ploof Fidel/
04/29/2020
Name - Title
Signature Date
Project Title: Silt Farms Report date: 04/29/20
Page 2 of 17
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
iCOMcheck Software Version 4.1.1.0
Inspection Checklist
1 Energy Code: 2015 IECC
Requirements: 85.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
& Req.ID
Plan Review
Complies?
Comments/Assumptions
C103.2 Mans, specifications, and/or
[PR2]1 calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
EComplies
▪ Does Not
❑ Not Observable
❑Not Applicable
C103.2 Plans, specifications, and/or
[PR3]1 calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C406 Plans, specifications, and/or
[PR9]1 calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
❑ Complies
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies
❑Does Not
❑Not Observable
ENot Applicable
Additional Comments/Assumptions:
1
High Impact (Tier 1) 2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 3 of 17
Section
& Req.ID
C403.2.4.
5,
C403.2.4.
6
[FO9]3
Footing / Foundation Inspection
Complies?
Comments/Assumptions
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
❑Complies
❑ Does Not
❑Not Observable
❑ Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 4 of 17
Section
#
& Req.ID
Plumbing Rough-In Inspection
Complies?
Comments/Assumptions
C404.5,
Heated water supply piping conforms
❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
•Does Not
C404.5.2
requirements. Refer to section details.
❑Not Observable
[PL6]3
ENot Applicable
C404.5,
Heated water supply piping conforms
❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
■Does Not
C404.5.2
[PL6]3
requirements. Refer to section details.
['Not Observable
•Not Applicable
C404.5,
Heated water supply piping conforms
❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
❑Does Not
C404.5.2
requirements. Refer to section details.
❑Not Observable
[PL6]3
❑Not Applicable
C404.5,
Heated water supply piping conforms
•Complies
C404.5.1,
to pipe length and volume
■Does Not
C404.5.2
requirements. Refer to section details,
❑Not Observable
[PL6]3
•Not Applicable
C404.5,
Heated water supply piping conforms
❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
i•Does Not
C404.5.2
requirements. Refer to section details.•
Not Observable
[PL6]3
❑Not Applicable
C404.5,
Heated water supply piping conforms
❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
■Does Not
C404.5.2
requirements. Refer to section details.
Not Observable
[PL6]3
■ Not Applicable
C404.5,
Heated water supply piping conforms
10Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
j•Does Not
C404.5.2
requirements. Refer to section details.
Not Observable
[PL6]3
Not Applicable
C404.5,
Heated water supply piping conforms
'❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
:❑Does Not
C404.5.2
requirements. Refer to section details.
;Not Observable
[PL6]3
•Not Applicable
C404.5,
Heated water supply piping conforms
❑Complies Exception: Requirement does not apply.
C404.5.1,
to pipe length and volume
:❑Does Not
C404.5.2
requirements. Refer to section details.•
Not Observable
[PL6]3
■ Not Applicable
C404.5,
Heated water supply piping conforms
❑Complies Requirement will be met.
C404.5.1,
to pipe length and volume
•Does Not
C404.5.2
requirements. Refer to section details.
Location on plans/spec: PLumbing floorplans
Not Observable
•[PL6]3
❑Not Applicable
C404.6.1,
Automatic time switches installed to
❑Complies Exception: Requirement does not apply.
C404.6.2
automatically switch off the
❑Does Not
[PL3]1
recirculating hot-water system or heat
trace.
❑Not Observable
•Not Applicable
11 High Impact (Tier 1)
2
Medium Impact (Tier 2)
3 JLow Impact (Tier 3)
Project Title: Silt Farms
Data filename S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 5 of 17
Section
#
& Req.ID
Plumbing Rough-In Inspection
Complies?
Comments/Assumptions
C404.6.1, Automatic time switches installed to
C404.6.2 automatically switch off the
[PL3]1 recirculating hot-water system or heat
trace.
•Complies
Requirement will be met.
Location on plans/spec: M4.1
■Does Not
Not Observable
i•Not Applicable
C404.6.3
Pumps that circulate water between a ❑Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls !❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ENot Observable
cycle❑Not Applicable
C404.6.3
Pumps that circulate water between a ❑Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls
that limit operation from startup to•
<= 5 minutes after end of heating
❑Does Not
;Not Observable
IN Not Applicable
cycle.
C404.6.3
Pumps that circulate water between a ❑Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls
that limit operation from startup to•
<= 5 minutes after end of heating
cycle.
'■Does Not
Not Observable
;•Not Applicable
C404.6.3
Pumps that circulate water between a ❑Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
'■Does Not
Not Observable
IIf Not Applicable
C404.6.3
Pumps that circulate water between a DComplies
; Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls
that limit operation from startup to•
<= 5 minutes after end of heating
cycle.
❑Does Not
Not Observable
ENot Applicable
C404.6.3
Pumps that circulate water between a OComplies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ENot Observable
cycle. ENot Applicable
C404.6.3
Pumps that circulate water between a ❑Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating [Not Observable
cycle. ENot Applicable
C404.6.3
Pumps that circulate water between a
•Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls DDoes Not
that limit operation from startup to
<= 5 minutes after end of heating ENot Observable
cycle. ENot Applicable
C404.6.3
Pumps that circulate water between a '❑Complies
Exception: Requirement does not apply,
[PL7]3
heater and storage tank have controls
that limit operation from startup to•
5 heating•
❑Does Not
Not Observable
<= minutes after end of
•cycle.
Not Applicable
C404.6.3
Pumps that circulate water between a ❑Complies
Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls
that limit operation from startup to•
<= 5 minutes after end of heating
cycle.
•Does Not
Not Observable
ENot Applicable
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 6 of 17
Section
& Req.ID
C404.7
[PL8]3
C404.7
[PL8]3
Plumbing Rough -In Inspection
Complies?
Comments/Assumptions
Water distribution system that pumps
water from a heated -water supply
pipe back to the heated -water source
through a cold -water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
❑ Complies Exception: Requirement does not apply.
❑ Does Not
❑ Not Observable
❑ Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated -water supply
pipe back to the heated -water source
through a cold -water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
❑Complies Exception: Requirement does not apply.
❑Does Not
❑ Not Observable
❑ Not Applicable
C404.7
[PL8]3
C404.7
[PL8]3
Water distribution system that pumps
water from a heated -water supply
pipe back to the heated -water source
through a cold -water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
❑Complies Exception: Requirement does not apply.
❑Does Not
❑ Not Observable
❑ Not Applicable
Water distribution system that pumps
water from a heated -water supply
pipe back to the heated -water source
through a cold -water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
❑Complies Exception: Requirement does not apply.
❑ Does Not
❑Not Observable
❑Not Applicable
Water distribution system that pumps
water from a heated -water supply
pipe back to the heated -water source
through a cold -water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
❑ Complies
❑ Does Not
❑ Not Observable
❑Not Applicable
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 7 of 17
Section
#
& Req.ID
Plumbing Rough-In Inspection
Complies?
Comments/Assumptions
C404.7 Water distribution system that pumps
[PL8]3 water from a heated-water supply
pipe back to the heated-water source•
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
•Complies
Exception: Requirement does not apply.
■ Does Not
Not Observable
•Not Applicable
pp e
C404.7 Water distribution system that pumps
[PL8]3 water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
•Complies
Exception: Requirement does not apply.
t ■ Does Not
Not Observable
IN Not Applicable
C404.7 Water distribution system that pumps
[PL8]3 water from a heated-water supply
pipe back to the heated-water source•
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
•Complies
Exception: Requirement does not apply.
❑Does Not
Not Observable
e
•Not Applicable
pp
C404.7 Water distribution system that pumps
[PL8]3 water from a heated-water supply
pipe back to the heated-water source•
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
•Complies
Exception: Requirement does not apply.
■ Does Not
Not Observable
•Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
❑Complies
Exception: Requirement does not apply.
• Does Not
[Not Observable
II Not Applicable
Additional Comments/Assumptions:
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 8 of 17
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
L3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 9 of 17
Section
#
& Req.ID
Mechanical Rough-In Inspection
Complies? Comments/Assumptions
C402.2,6 Thermally ineffective panel surfaces of
[ME41]3 sensible heating panels have
insulation >= R-3.5.
•Complies
Exception: Requirement does not apply.
•Does Not
■Not Observable
•Not Applicable
C403.2.13 Unenclosed spaces that are heated
[ME71]2 use only radiant heat.
[Complies
❑Does Not
Exception: Requirement does not apply.
■ Not Observable
•Not Applicable
C403.2.3 HVAC equipment efficiency verified.
[ME55]2
❑Complies
See the Mechanical Systems list for values.
'■Does Not
■ Not Observable
j■Not Applicable
C403.2.4. Fault detection and diagnostics
7 'installed with air-cooled unitary DX
[ME113]2 'units having economizers.
•Complies
Exception: Requirement does not apply.
•Does Not
•Not Observable
•Not Applicable
C403.2.4. Fault detection and diagnostics
7 'installed with air-cooled unitary DX
[ME113]2 units having economizers.
❑Complies
Exception: Requirement does not apply.
■Does Not
•Not Observable
Not Applicable
C403.2.6.
1
[ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
I■Complies
j❑Does Not
Exception: Requirement does not apply.
III Not Observable
■ Not Applicable
pp
C403.2.6. Enclosed parking garage ventilation
2 has automatic contaminant detection
[ME115]3 and capacity to stage or modulate
fans to 50% or less of design capacity.
•Complies
Exception: Requirement does not apply.
•Does Not
■Not Observable
•Not Applicable
C403.2.7 Exhaust air energy recovery on
[ME57]1 systems meeting Table C403.2.7(1)
and C403.2.7(2).
•Complies
Exception: Requirement does not apply.
•Does Not
•Not Observable
•Not Applicable
C403.2.8 Kitchen exhaust systems comply with
[ME116]3 replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
•Complies
•Does Not
❑Not Observable
■Not Applicable
C403.2.9 HVAC ducts and plenums insulated.
[ME60]2 Where ducts or plenums are installed 's
in or under a slab, verification may
need to occur during Foundation
❑Complies
Exception: Requirement does not apply.
Does Not
•Not Observable
•Not Applicable
pplicable
C403.2.9 :Ducts and plenums sealed based on
[ME10]2 static pressure and location.
•Complies
Requirement will be met.
Location on plans/spec: MP0.1
III Does Not
•Not Observable
❑Not Applicable
C403.2.9. Ductwork operating >3 in. water ;■Complies
1.3 column requires air leakage testing.
[ME11]3
Exception: Requirement does not apply.
■Does Not
■Not Observable
•Not Applicable
1
High Impact (Tier 1)
2 f Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 10 of 17
Section
#
& Req.ID
Mechanical Rough-In Inspection
Complies?
Comments/Assumptions
C403.2.9, Ductwork operating >3 in. water •Complies Exception: Requirement does not apply.
1.3 column requires air leakage testing. •Does Not
[ME11]3
•Not Observable
•Not Applicable
C403.2.9. Ductwork operating >3 in. water •Complies Exception: Requirement does not apply.
1.3 column requires air leakage testing. •Does Not
[ME11]3
•Not Observable
•Not Applicable
C403.2.9. Ductwork operating >3 in. water .00omplies Exception: Requirement does not apply.
1.3 column requires air leakage testing. •Does Not
[ME11]3 '❑Not Observable
❑Not Applicable
C403.2.9. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply.
1.3 column requires air leakage testing.'El-Does Not
[ME11]3 ;❑Not Observable
❑Not Applicable
C403.2.9. Ductwork operating >3 in. water ,OComplies Exception: Requirement does not apply.
1.3 column requires air leakage testing. •Does Not
[ME11]3 ❑Not Observable
■ Not Applicable
C403.2.9. Ductwork operating >3 in. water EComplies
Exception: Requirement does not apply.
1.3 column requires air leakage testing. j❑Does Not
[ME11]3 ❑Not Observable
❑Not Applicable
C403.3
Air economizers provided where EComplies Requirement will be met.
[ME62]1
required, meet the requirements for
design capacity, control signal,
ventilation controls, high-limit shut-off,
integrated economizer control, and
provide a means to relieve excess
outside air during operation.
❑Does Not
❑Not Observable
Location on plans/spec: Mechanical Floorplans and
schedules
; • Not Applicable
C403.3 Air economizers provided where ❑Complies Requirement will be met.
[ME62]1 required, meet the requirements for •Does Not
design capacity, control signal,
controls, high-limit shut-off,
integrated economizer control, and
provide a means to relieve excess
outside air during operation,
Location on plans/spec: mechanical schedules and floor
plans
Na Observable
•ventilation
I�Not Applicable
pp
C403.4.2 Temperature reset by representative '❑Complies Requirement will be met.
[ME69]3 building loads in pumping systems for •Does Not
chiller and boiler systems >500,000 Location on plans/spec: M4.1
ENot Observable
Btu/h.
❑Not Applicable
C403.4.2. Hydronic systems greater than ❑Complies ;Requirement will be met.
4 500,000 Btu/h designed for variable ❑Does Not
[ME68]3 fluid flow.;❑Not Observable Location on plans/spec: M4.1
❑Not Applicable
C403.4.2. System turndown requirement met EComplies Requirement will be met.
5 through multiple single-input boilers, ❑Does Not
[ME107]3 one or more modulating boilers, or a
combination of single-input and
;Not Observable
Location on plans/spec: M0.1, M4.1
❑Not Applicable
modulating boilers. Boiler input
between 1.0 MBtu/h and 5 MBtu/h has
See the Mechanical Systems list for values.
3:1 turndown ratio, boiler input
between 5.0 MBtu/h and 10 MBtu/h
has 4:1 turndown ratio, boiler input >
10.0 MBtu/h has 5:1 turndown ratio.
1
High Impact (Tier 1)
2 1 Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 11 of 17
Section
#
& Reg.ID
1
t Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
EComplies
Exception: Requirement does not apply,
See the Mechanical Systems list for values.
•Does Not
MI Not Observable
•Not Applicable
C403.4.4.
Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6
of individual zone boxes have static ■ Does Not
[ME110]3
pressure setpoint reset controls.
See the Mechanical Systems list for values.
■Not Observable
•Not Applicable
C403.4.4.
, Multiple zone VAV systems with DDC •Complies Exception: Requirement does not apply.
6
of individual zone boxes have static ❑Does Not
[ME110]3
pressure setpoint reset controls. See the Mechanical Systems list for values.
ENot Observable
ENot Applicable
C403.4.4.
Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply.
6
of individual zone boxes have static ❑Does Not
[ME110]3
pressure setpoint reset controls. See the Mechanical Systems list for values.
❑Not Observable
❑Not Applicable
C403.4.4.
Multiple zone VAV systems with DDC •Complies Exception: Requirement does not apply.
6
of individual zone boxes have static ■Does Not
[ME110]3
pressure setpoint reset controls.
See the Mechanical Systems list for values.
•Not Observable
❑Not Applicable
C403.4.4.
Multiple zone VAV systems with DDC EComplies ;Exception: Requirement does not apply,
6
of individual zone boxes have static ❑Does Not
[ME110]3
pressure setpoint reset controls. ENot Observable See the Mechanical Systems list for values.
Not Applicable
C403.4.4.
Multiple zone VAV systems with DDC EComplies Exception: Requirement does not apply.
6
of individual zone boxes have static ❑Does Not
[ME110]3
pressure setpoint reset controls. See the Mechanical Systems list for values.
['Not Observable
■Not Applicable
C404.2.1 Gas-fired water -heating equipment ❑Complies Requirement will be met.
[ME111]2 installed in new buildings: where a
singular piece of water -heating
equipment >= 1,000 kBtu/h serves
the entire building, thermal efficiency
•Does Not
• ,
;M Not Observable
IENot Applicable
>= 90 Et. Where multiple pieces of
water -heating equipment serve the
building with combined rating >=
1,000 kBtu/h, the combined input -
capacity -weighted -average thermal
efficiency >= 90 Et. Exclude input
rating of equipment in individual
:dwelling units and equipment <= 100
kBtu/h.
C408.2.2.
Air outlets and zone terminal devices ;■Complies Requirement will be met.
1
have means for air balancing. :❑Does Not
[ME53]3❑Not
Observable Location on plans/spec: Mechanical Floorplans
ENot Applicable
C403.5,
Refrigerated display cases, walk-in :EComplies Requirement will be met.
C403.5.1,
coolers or walk-in freezers served by
•Does Not
C403.5.2
remote compressors and remote
•Not Observable
[ME123]3
condensers not located in a
condensing unit, have fan -powered
condensers that comply with Sections
•Not Applicable
C403.5.1 and refrigeration compressor
systems that comply with C403,5.2..
Additional Comments/Assumptions:
1
High Impact (Tier 1) E 2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 12 of 17
1
High Impact (Tier 1) 1 2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 13 of 17
Section
#
& Req.ID
Final Inspection Complies? ! Comments/Assumptions
C303.3,
C408.2.5.
3
[F18]3
Furnished O&M manuals for HVAC■Complies
systems within 90 days of system •Does Not
acceptance. :•Not Observable
•Not Applicable
C403.2.2
HVAC systems and equipment ❑Complies
Requirement will be met.
[F127]3
capacity does not exceed calculated •Does Not
loads.
Location on plans/spec: Mechanical Schedules
■Not Observable
❑Not Applicable
C403.2.4.
. Heating and cooling to each zone is ;❑Complies
Requirement will be met.
1
controlled by a thermostat control. ❑Does Not
[F147]3
Minimum one humidity control device
Location on plans/spec: Mechanical Floorplans
■Not Observable
installed
per
■ Not Applicable
humidification/dehumidification
system.
_
C403.2.4.
Heating and cooling to each zone is ❑Complies Requirement will be met.
1
controlled by a thermostat control. •Does Not
[F147]3
Minimum one humidity control device ❑Not Observable
installed
Location on plans/spec: mefchanical floorplans
per
humidification/dehumidification■Not Applicable
system.
C403.2,4,
Heating and cooling to each zone is ❑Complies Requirement will be met.
1
controlled by a thermostat control. •Does Not
[F147]3
Minimum one humidity control device
Location on plans/spec: mechanical floorplans
•Not Observable
installed
per
■Not Applicable
humidification/dehumidification
system.
_
C403.2.4.
Heating and cooling to each zone is •Complies
Requirement will be met.
1
controlled by a thermostat control. ❑Does Not
[F147]3
Minimum humidity control device
Location on plans/spec: mechanical floorplans
one
•Not Observable
installed
per
■Not Applicable
pp
humidification/dehumidification
system.
C403.2.4.
Heating and cooling to each zone is •Complies Requirement will be met.
1
controlled by a thermostat control. ■Does Not
[FI47]3
Minimum one humidity control device❑Not Observable Location on plans/spec: mechanical floorplans
per installed
humidification/dehumidification ❑Not Applicable
system.
C403.2.4.
Heating and cooling to each zone is ,❑Complies Requirement will be met.
1
controlled by a thermostat control. ;❑Does Not
[F147]3
Minimum one humidity control device ❑Not Observable Location on plans/spec: mechanical floorplans
per installed
humidification/dehumidification ;❑Not Applicable
system.
C403.2.4.
Heating and cooling to each zone is IS Complies Requirement will be met,
1
controlled by a thermostat control. Does Not
[F147]3
Minimum one humidity control device'❑Not Observable Location on plans/spec: Mechanical Floor plans
per installed
humidification/dehumidification l❑Not Applicable
system.
C403.2.4.
Thermostatic controls have a 5 °F ❑Complies Requirement will be met.
1.2
deadband. :❑Does Not
[F138]3
Location on plans/spec: M4.1
❑Not Observable
❑Not Applicable
C403.2.4.
Temperature controls have setpoint •Complies Requirement will be met.
1.3
overlap restrictions. ❑Does Not
[F120]3
❑Not Observable
ENot Applicable
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename. S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 14 of 17
Section
#
& Req.ID
Final Inspection Complies? Comments/Assumptions
C403.2.4. Each zone equipped with setback
2 `controls using automatic time clock or
[F139]3 programmable control system.•
,■Complies
Requirement will be met.
■Does Not
Not Observable
■ Not Applicable •
C403.2.4. Automatic Controls: Setback to 55°F :•Complies Requirement will be met.
2.1, (heat) and 85°F (cool); 7-day clock, 2- •Does Not
C403.2.4. hour occupant override, 10-hour•
2.2 backup
Not Observable
■ Not Applicable
[F140]3
•
C403.2.4. Systems include optimum start '❑Complies Exception: Requirement does not apply.
2,3 controls. ICIDoes Not
[F141]3 ❑Not Observable
ENot Applicable
C403.2.4. ;Systems include optimum start ❑Compiles
Exception: Requirement does not apply.
2.3 controls.
❑Does Not
[F141]3
IN Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start :❑Complies Exception: Requirement does not apply.
2.3 controls. ❑Does Not
[F141]3 •DNot Observable;
❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies ; Exception: Requirement does not apply.
2.3 controls. ❑Does Not
[F141]3 ❑Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start
❑Complies • Exception: Requirement does not apply.
2.3 controls.
❑Does Not
[F141]3
:Not Observable
❑Not Applicable
C403.2.4. Systems include optimum start❑Complies Exception: Requirement does not apply.
2.3 controls.
❑Does Not
[F141]3
pilot Observable.
❑Not Applicable •
C403.2.4. Systems include optimum start
EComplies
Exception: Requirement does not apply.
2.3 controls. ❑Does Not
[F141]3 [Not Observable
❑Not Applicable
C404.3 ' Heat traps installed on supply and ;❑Complies Exception: Requirement does not apply.
[FI11]3 discharge piping of non-circulating ❑Does Not
systems.
❑Not Observable
❑Not Applicable
C404.3 Heat traps installed on supply and ❑Complies Exception: Requirement does not apply.
[FI11]3 discharge piping of non-circulating ;❑Does Not
systems. ;❑Not Observable
❑Not Applicable
C404.4 All piping insulated in accordance with ;❑Complies 'Requirement will be met.
[F125]2 section details and Table C403.2.10. ❑Does Not
Location on plans/spec: MP0.1
❑Not Observable
❑Not Applicable
1
High Impact (Tier 1) 12
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 15 of 17
Section
#
& Req.ID
Final inspection
Complies? 1 Comments/Assumptions
C404.4 All piping insulated in accordance with ❑Complies Requirement will be met.
[F125]2 section details and Table C403.2.10. ❑Does Not
❑Not Observable Location on plans/spec: MP0.1
❑Not Applicable
C404.6.1 Controls are installed that limit the
❑Cornplies Exception: Requirement does not apply.
[F112]3 operation of a recirculation pump
installed to maintain temperature of a
storage tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
❑Does Not
Not Observable
;
• Not Applicable
C404.6.1 Controls are installed that limit the
.❑Complies Requirement will be met.
[F112]3 operation of a recirculation pump
❑Does Not
installed to maintain temperature of a
Location on plans/spec: M4.1
Not Observable
•storage
tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
Not Applicable
C408.2.1 Commissioning plan developed by
.■Complies
[F128]1 registered design professional or
approved agency.
'❑Does Not
:Not Observable
Not Applicable
C408.2.3. HVAC equipment has been tested to
;■Complies
1 ensure proper operation.
; ■ Does Not
[F131]1
•Not Observable
❑Not Applicable
C408.2.3. HVAC control systems have been
❑Complies
2 tested to ensure proper operation,
❑Does Not
[FI10]1 calibration and adjustment of controls.
ENot Observable
❑Not Applicable
C408.2.3. Economizers have been tested to
•Complies
3 ensure proper operation.
❑Does Not
[FI32]1
❑Not Observable
❑Not Applicable
C408.2.4
Preliminary commissioning report
•Complies
[F129]1
completed and certified by registered
design professional or approved
agency.
II Does Not
❑Not Observable
❑Not Applicable
C408.2.5. Furnished HVAC as -built drawings
❑Complies
1 submitted within 90 days of system
EDoes Not
[F17]3 acceptance.
:Not Observable
[Not Applicable
C408.2.5. An air and/or hydronic system
❑Complies
3 balancing report is provided for HVAC
❑Does Not
[F143]1 systems.
•Not Observable
■ Not Applicable
C408.2.5. Final commissioning report due to
•Complies
4 building owner within 90 days of
❑Does Not
[F130]1 receipt of certificate of occupancy.
['Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1
High Impact (Tier 1)
2 (Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Silt Farms
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Report date: 04/29/20
Page 16 of 17
Project Title: Silt Farms Report date: 04/29/20
Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation
Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck
Page 17 of 17
COMcheck Software Version 4.1.1.0
rift i 1 Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title:
Project Type: New Construction
Construction Site: Owner/Agent:
Designer/Contractor:
Additional Efficiency Package(s)
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts / ft2 (B X C)
1 -Manufacturing Facility 19100 1.05 20112
Proposed Interior Lighting Power
A
Total Allowed Watts = 20112
B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
1 -Manufacturing Facility
LED 1: R1: Other:
LED 3: R3: Other:
LED 4: S2: Other:
LED 5: S3: Other:
LED 6: S4.4: Other:
LED 7: S4.8: Other:
LED 8: W1: Other:
LED 9: S1: Other:
Exemption:Plant Growth Lighting
1 39 21 819
1 28 19 535
1 259 40 10412
1 69 38 2656
1 19 10 198
1 12 21 250
1 4 20 80
1 621 1045 Exempt
Total Proposed Watts = 14949
Interior Lighting PASSES: Design 26% better than code
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.) and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
JESSICA WOODY - ELECTRICAL ENGINEER
Name - Title
Sig nate
10/18/2019
Date
Project Title:
Data filename S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Report date: 10/18/19
Page 1 of 7
111111 COMcheck Software Version 4.1.1.0
Afii Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
2015 IECC
New Construction
1 (Developed rural area)
Owner/Agent: Designer/Contractor:
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts / Unit Wattage (B X C)
Walkway (Walkway < 10 feet wide)
Tech Doors (Other door (not main entry))
1226 ft of 0.7 Yes 858
36 ft of door 20 Yes 720
Total Tradable Watts (a) = 1827
Total Allowed Watts = 1827
Total Allowed Supplemental Watts (b) = 500
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 500 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B C D E
Lamps/ # of Fixture (C X D)
Fixture Fixtures Watt.
Parking ( Parking area 6222 ft2): Tradable Wattage
Walkway ( Walkway < 10 feet wide 1226 ft of walkway length). Tradable Wattage
LED 1: ZB1: BOLLARDS: Other:
Tech Doors ( Other door (not main entrv136 ft of door width: Tradable Wattage
LED 2: ZW1: WALLPACK: Other:
4 22 88
1 5 125
Total Tradable Proposed Watts =
623
711
Exterior Lighting PASSES: Design 69% better than code
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
JESSICA WOODY - ELECTRICAL ENGINEER
Name - Title
Signatu e
10/18/2019
Date
Project Title:
Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Report date: 10/18/19
Page 2 of 7
COMcheck Software Version 4.1.1.0
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 64.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
& Req.ID
Plan Review
C103.2 Plans, specifications, and/or
[PR4]1 calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies?
❑ Complies
❑Does Not
['Not Observable
❑ Not Applicable
C103.2 Plans, specifications, and/or
[PR8]1 calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
❑ Complies
❑ Does Not
:Not Observable
❑ Not Applicable
Comments/Assumptions
C406 Plans, specifications, and/or
[PR9]1 calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
❑ Complies
❑Does Not
❑ Not Observable
❑ Not Applicable
Additional Comments/Assumptions:
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Report date: 10/18/19
Page 3 of 7
Section
#
& Req.ID
Rough-In Electrical Inspection j Complies?
;
` Comments/Assumptions
C405.2.1 Lighting controls installed to uniformly
[EL15]1 reduce the lighting load by at least
50%.
❑Complies
Exception: Areas such as security or emergency areas that
need continuous lighting.
;
•Does Not
•Not Observable
❑Not Applicable
C405.2,1
[EL18]1
Occupancy sensors installed in❑Complies
required spaces.
Requirement will be met.
•Does Not
•Not Observable
■Not Applicable
C405.2.1, Independent lighting controls installed
C405.2.2. per approved lighting plans and all
3 manual controls readily accessible and;
[EL23]2 visible to occupants.
,❑Complies
Requirement will be met.
;•Does Not
■Not Observable
■ Not Applicable
C405.2.2. Automatic controls to shut off all
1 building lighting installed in all
[EL22]2 buildings.
;❑Complies
EDoes Not
Requirement will be met.
■Not Observable
■Not Applicable
C405.2.3 Daylight zones provided with
[EL16]2 individual controls that control the
lights independent of general area
lighting. ;
•Complies
Requirement will be met.
•Does Not
;•Not Observable
■Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
❑Complies
Requirement will be met.
"'Does Not
•Not Observable
■Not Applicable
C405.2.3, Enclosed spaces with daylight area
C405.2.3. under skylights and rooftop monitors,•Does
1, are equipped with required lighting
C405.2.3. controls. E❑Not
3
[EL21]1
❑Complies
Exception: Requirement does not apply.
Not
Observable
❑Not Applicable
C405.2.4 :Separate lighting control devices for ;❑Complies
[EL4]1 specific uses installed per approved :•Does
lighting plans.
,❑Not
Requirement will be met.
Not
■Not Observable
Applicable ;
C405.2.4 Additional interior lighting power
[EL8]1 allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
•Complies
Requirement will be met.
•Does Not
■Not Observable
■ Not Applicable
C405.2.5
[EL25]nall
Automatic lighting controls for exterior;❑Complies
lighting installed. Controls will be ,❑Does
daylight controlled, set based on
business operation time-of-day, or
reduce connected lighting > 30%.
Not
Requirement will be met.
■Not Observable
■ Not Applicable
pp
C405.3 Exit signs do not exceed 5 watts per
[EL6]1 face.
❑Complies
❑Does Not
Requirement will be met.
■ Not Observable
■Not Applicable
Additional Comments/Assumptions:
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Report date: 10/18/19
Page 4 of 7
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Report date: 10/18/19
Page 5 of 7
Section
#
& Req.ID
Final Inspection
Complies?
Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
❑Complies
•Does Not
■Not Observable;
•Not Applicable
C405.4.1 Interior installed lamp and fixture
[F118]' lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts,
❑Complies
❑Does Not
See the Interior Lighting fixture schedule for values.
•Not Observable
■ Not Applicable
C405.5.1
[F119]'
Exterior lighting power is consistent
with what is shown on the approved '•Does
lighting plans, demonstrating ;❑Not
proposed watts are less than or equal
to allowed watts.
■ Complies
See the Exterior Lighting fixture schedule for values.
Not
Observable
Not Applicable
C408.2.5. Furnished as -built drawings for
1 electric power systems within 90 days
[F116]3 of system acceptance.
❑Complies
•Does Not
❑Not Observable
■Not Applicable
C408.3 . Lighting systems have been tested to ;■Complies
[F133]1 ensure proper calibration, adjustment, ;El
programming, and operation.
-Does Not
■Not Observable
•Not Applicable
Additional Comments/Assumptions:
1
High Impact (Tier 1)
2
Medium Impact (Tier 2)
3
Low Impact (Tier 3)
Project Title: Report date: 10/18/19
Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Page 6 of 7
Project Title: Report date: 10/18/19
Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation
Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck
Page 7 of 7