HomeMy WebLinkAboutCompliance CertificatesCOMcheck Software Version 4.1.1.0 Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing / Wall Area: 2015 IECC Silt Farms Silt, Colorado 5b New Construction 13% Construction Site: Owner/Agent: County Rd 331 Charles Barr Colorado River Road Silt, CO 81652 Additional Efficiency Package(s) Designer/Contractor: Eric Kraai KDA INC. 417 Monument Road Suite 7 Grand Junction, CO 81507 High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Building Area Floor Area 1-F2 (Manufacturing Facility) : Nonresidential 41765 Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factors.) Perimeter CFR Insulated Roof Panel: Other Metal Building Roof, [Bldg. Use 1 - F2] (b) 1st Floor Slab: Slab-On-Grade:Unheated, [Bldg. Use 1 - F2] (d) NORTH Rated panel - ThermalSafe - MetlSpan: Other Exterior Wall, Heat capacity 0.0, [Bldg. Use 1 - F2] (b) Man Doors - TruDoor Flush-Mtl.: Insulated Metal, Swinging, [Bldg. Use 1 - F2] Overhead Doors - 432 Series: Insulated Metal, Non -Swinging, [Bldg. Use 1 - F2] CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 - F2] (b) Mezzanine Windows - Kawneer 6400 Series: Metal Frame:Fixed, Peri. Specs.: Product ID Cardinal Glass, SHGC 0.40, [Bldg. Use 1 - F2] (c) EAST CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 - F2] (b) Man Doors - TruDoor Flush-MtI.: Insulated Metal, Swinging, [Bldg. Use 1 - F2] SOUTH Rated panel - ThermalSafe - MetlSpan: Other Exterior Wall, Heat capacity 0.0, [Bldg. Use 1 - F2] (b) FireRated Windows - riretrames Tel': Metal Frame with Thermal 41765 0.026 0.035 970 • • 0.730 0.540 7279 0.044 0.064 42 0.310 0.370 80 0.136 0.179 2720 0.052 0.052 1235 0.380 0.380 2675 0.052 0.052 42 ••• 0.310 0.370 7279 0.044 0.064 734 --• 0.380 0.380 Project Title: Slit Farms Report date: 04/29/20 Data filename: P:\2012 - Spring Born\PROJECT DATA\2015 IECC ComCheck\2015 IECC Springborn.cck Page 1 of 9 Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factor(.) Perimeter Break:Fixed, Peri. Specs.: Product ID Cardinal Glass, SHGC 0.40, [Bldg. Use 1 - F2] (c) Man Doors - TruDoor Flush-Mtl.: Insulated Metal, Swinging, [Bldg. Use 1 - F2] Overhead Doors - 432 Series: Insulated Metal, Non -Swinging, [Bldg. Use 1 - F2] RoIIUp Door - FireKing: Insulated Metal, Non -Swinging, [Bldg. Use 1 - F2] CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 - F2] (b) Mezzanine Windows - Kwaneer 6400 Series: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID Cardinal Glass, SHGC 0.40, [Bldg. Use 1 - F2] (c) WEST CF Light Mesa - MetlSpan: Other Metal Building Wall, [Bldg. Use 1 - F2] (b) Mezzanine Windows - Kawneer 6400 Series: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID Cardinal Glass, SHGC 0.40, [Bldg. Use 1 - F2] (c) Man Doors - TruDoor Flush-Mtl.: Insulated Metal, Swinging, [Bldg. Use 1 - F2] Overhead Doors - 432 Series: Insulated Metal, Non -Swinging, [Bldg. Use 1 - F2] 126 240 56 2720 1235 2675 80 126 80 0.310 0.370 0.136 0.179 0.222 0.179 0.052 0.052 0.380 0.380 0.052 0.052 0.380 0.380 0.310 0.370 0.136 0.179 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) 'Other' components require supporting documentation for proposed U -factors. (c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. Envelope PASSES: Design 1 I % better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications, and other calculations submitted with this permit application, The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4 .1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. /'--"� rrC ILrctai — L+ d - Name - Title Signature Date Project Title: Silt Farms Report date: 04/29/20 Data filename: P:\2012 - Spring Born\PROJECT DATA\2015 IECC ComCheck\2015 IECC 5pringborn.cck Page 2 of 9 irdt 1 COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: County Rd 331 Colorado River Road Silt, CO 81652 Additional Efficiency Package(s) Unspecified 2015 IECC Silt Farms Rifle, Colorado 5b New Construction Owner/Agent: Charles Barr Designer/Contractor: Wesley Ploof BG Buildingworks 1626 Cole Blvd, Suite 300 Golden, CO 80401 3032783820 wgploof@bgbuildingworks.com Mechanical Systems List Quantity System Type & Description 2 F-1,2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 110 kBtu/h Proposed Efficiency = 93.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Split System, Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1800 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade 1 F-3 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 110 kBtu/h Proposed Efficiency = 93.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Split System, Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 2000 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade 22 UH -1 (Single Zone): Heating: 1 each - Unit Heater, Gas, Capacity = 8600 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Fan System: FAN SYSTEM 3 -- Compliance (Brake HP method) : Passes Fans: FAN 3 Supply, Constant Volume, 495 CFM, 0.0 motor nameplate hp, 0.0 design brake hp (0.0 max. BHP), 0.0 fan efficiency grade 2 UH -2,4 (Single Zone): Heating: 1 each - Unit Heater, Gas, Capacity = 23 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Fan System: FAN SYSTEM 4 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 5 Supply, Constant Volume, 750 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 1 of 17 Quantity System Type & Description 1 UH -3 (Single Zone): Heating: 1 each - Unit Heater, Gas, Capacity = 5 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Fan System: FAN SYSTEM 5 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 6 Supply, Constant Volume, 270 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade 1 UH -5 (Single Zone): Heating: 1 each - Unit Heater, Gas, Capacity = 21 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Fan System: FAN SYSTEM 6 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 7 Supply, Constant Volume, 1200 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade 2 UH -7 (Single Zone): Heating: 1 each - Unit Heater, Electric, Capacity = 10 kBtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 7 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 8 Supply, Constant Volume, 350 CFM, 0.0 motor nameplate hp, 0.0 fan efficiency grade 2 Plant 1: Heating: Hot Water Boiler, Capacity 4000 kBtu/h, Gas Proposed Efficiency: 93.00 % Ec, Required Efficiency: 82.00 % Ec 1 WH -3: Gas Instantaneous Water Heater, Capacity: 0 gallons, Input Rating: 75 kBtu/h w/ Circulation Pump Proposed Efficiency: 93.00 EF, Required Efficiency: 0.62 EF 1 WH -1: Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 250 kBtu/h w/ Circulation Pump Proposed Efficiency: 96.00 % Et, Required Efficiency: 80.00 % Et Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Wesley Ploof Fidel/ 04/29/2020 Name - Title Signature Date Project Title: Silt Farms Report date: 04/29/20 Page 2 of 17 Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck iCOMcheck Software Version 4.1.1.0 Inspection Checklist 1 Energy Code: 2015 IECC Requirements: 85.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section & Req.ID Plan Review Complies? Comments/Assumptions C103.2 Mans, specifications, and/or [PR2]1 calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. EComplies ▪ Does Not ❑ Not Observable ❑Not Applicable C103.2 Plans, specifications, and/or [PR3]1 calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C406 Plans, specifications, and/or [PR9]1 calculations provide all information with which compliance can be determined for the additional energy efficiency package options. ❑ Complies ❑Does Not ❑Not Observable ❑Not Applicable ❑Complies ❑Does Not ❑Not Observable ENot Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 3 of 17 Section & Req.ID C403.2.4. 5, C403.2.4. 6 [FO9]3 Footing / Foundation Inspection Complies? Comments/Assumptions Snow/ice melting system sensors for future connection to controls. Freeze protection systems have automatic controls installed. ❑Complies ❑ Does Not ❑Not Observable ❑ Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 4 of 17 Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume •Does Not C404.5.2 requirements. Refer to section details. ❑Not Observable [PL6]3 ENot Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ■Does Not C404.5.2 [PL6]3 requirements. Refer to section details. ['Not Observable •Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. ❑Not Observable [PL6]3 ❑Not Applicable C404.5, Heated water supply piping conforms •Complies C404.5.1, to pipe length and volume ■Does Not C404.5.2 requirements. Refer to section details, ❑Not Observable [PL6]3 •Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume i•Does Not C404.5.2 requirements. Refer to section details.• Not Observable [PL6]3 ❑Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ■Does Not C404.5.2 requirements. Refer to section details. Not Observable [PL6]3 ■ Not Applicable C404.5, Heated water supply piping conforms 10Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume j•Does Not C404.5.2 requirements. Refer to section details. Not Observable [PL6]3 Not Applicable C404.5, Heated water supply piping conforms '❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume :❑Does Not C404.5.2 requirements. Refer to section details. ;Not Observable [PL6]3 •Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume :❑Does Not C404.5.2 requirements. Refer to section details.• Not Observable [PL6]3 ■ Not Applicable C404.5, Heated water supply piping conforms ❑Complies Requirement will be met. C404.5.1, to pipe length and volume •Does Not C404.5.2 requirements. Refer to section details. Location on plans/spec: PLumbing floorplans Not Observable •[PL6]3 ❑Not Applicable C404.6.1, Automatic time switches installed to ❑Complies Exception: Requirement does not apply. C404.6.2 automatically switch off the ❑Does Not [PL3]1 recirculating hot-water system or heat trace. ❑Not Observable •Not Applicable 11 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 JLow Impact (Tier 3) Project Title: Silt Farms Data filename S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 5 of 17 Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions C404.6.1, Automatic time switches installed to C404.6.2 automatically switch off the [PL3]1 recirculating hot-water system or heat trace. •Complies Requirement will be met. Location on plans/spec: M4.1 ■Does Not Not Observable i•Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls !❑Does Not that limit operation from startup to <= 5 minutes after end of heating ENot Observable cycle❑Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls that limit operation from startup to• <= 5 minutes after end of heating ❑Does Not ;Not Observable IN Not Applicable cycle. C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls that limit operation from startup to• <= 5 minutes after end of heating cycle. '■Does Not Not Observable ;•Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. '■Does Not Not Observable IIf Not Applicable C404.6.3 Pumps that circulate water between a DComplies ; Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls that limit operation from startup to• <= 5 minutes after end of heating cycle. ❑Does Not Not Observable ENot Applicable C404.6.3 Pumps that circulate water between a OComplies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <= 5 minutes after end of heating ENot Observable cycle. ENot Applicable C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <= 5 minutes after end of heating [Not Observable cycle. ENot Applicable C404.6.3 Pumps that circulate water between a •Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls DDoes Not that limit operation from startup to <= 5 minutes after end of heating ENot Observable cycle. ENot Applicable C404.6.3 Pumps that circulate water between a '❑Complies Exception: Requirement does not apply, [PL7]3 heater and storage tank have controls that limit operation from startup to• 5 heating• ❑Does Not Not Observable <= minutes after end of •cycle. Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls that limit operation from startup to• <= 5 minutes after end of heating cycle. •Does Not Not Observable ENot Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 6 of 17 Section & Req.ID C404.7 [PL8]3 C404.7 [PL8]3 Plumbing Rough -In Inspection Complies? Comments/Assumptions Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. ❑ Complies Exception: Requirement does not apply. ❑ Does Not ❑ Not Observable ❑ Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. ❑Complies Exception: Requirement does not apply. ❑Does Not ❑ Not Observable ❑ Not Applicable C404.7 [PL8]3 C404.7 [PL8]3 Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. ❑Complies Exception: Requirement does not apply. ❑Does Not ❑ Not Observable ❑ Not Applicable Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. ❑Complies Exception: Requirement does not apply. ❑ Does Not ❑Not Observable ❑Not Applicable Water distribution system that pumps water from a heated -water supply pipe back to the heated -water source through a cold -water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. ❑ Complies ❑ Does Not ❑ Not Observable ❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 7 of 17 Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions C404.7 Water distribution system that pumps [PL8]3 water from a heated-water supply pipe back to the heated-water source• through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. •Complies Exception: Requirement does not apply. ■ Does Not Not Observable •Not Applicable pp e C404.7 Water distribution system that pumps [PL8]3 water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. •Complies Exception: Requirement does not apply. t ■ Does Not Not Observable IN Not Applicable C404.7 Water distribution system that pumps [PL8]3 water from a heated-water supply pipe back to the heated-water source• through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. •Complies Exception: Requirement does not apply. ❑Does Not Not Observable e •Not Applicable pp C404.7 Water distribution system that pumps [PL8]3 water from a heated-water supply pipe back to the heated-water source• through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. •Complies Exception: Requirement does not apply. ■ Does Not Not Observable •Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. ❑Complies Exception: Requirement does not apply. • Does Not [Not Observable II Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 8 of 17 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) L3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 9 of 17 Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions C402.2,6 Thermally ineffective panel surfaces of [ME41]3 sensible heating panels have insulation >= R-3.5. •Complies Exception: Requirement does not apply. •Does Not ■Not Observable •Not Applicable C403.2.13 Unenclosed spaces that are heated [ME71]2 use only radiant heat. [Complies ❑Does Not Exception: Requirement does not apply. ■ Not Observable •Not Applicable C403.2.3 HVAC equipment efficiency verified. [ME55]2 ❑Complies See the Mechanical Systems list for values. '■Does Not ■ Not Observable j■Not Applicable C403.2.4. Fault detection and diagnostics 7 'installed with air-cooled unitary DX [ME113]2 'units having economizers. •Complies Exception: Requirement does not apply. •Does Not •Not Observable •Not Applicable C403.2.4. Fault detection and diagnostics 7 'installed with air-cooled unitary DX [ME113]2 units having economizers. ❑Complies Exception: Requirement does not apply. ■Does Not •Not Observable Not Applicable C403.2.6. 1 [ME59]1 Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. I■Complies j❑Does Not Exception: Requirement does not apply. III Not Observable ■ Not Applicable pp C403.2.6. Enclosed parking garage ventilation 2 has automatic contaminant detection [ME115]3 and capacity to stage or modulate fans to 50% or less of design capacity. •Complies Exception: Requirement does not apply. •Does Not ■Not Observable •Not Applicable C403.2.7 Exhaust air energy recovery on [ME57]1 systems meeting Table C403.2.7(1) and C403.2.7(2). •Complies Exception: Requirement does not apply. •Does Not •Not Observable •Not Applicable C403.2.8 Kitchen exhaust systems comply with [ME116]3 replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. •Complies •Does Not ❑Not Observable ■Not Applicable C403.2.9 HVAC ducts and plenums insulated. [ME60]2 Where ducts or plenums are installed 's in or under a slab, verification may need to occur during Foundation ❑Complies Exception: Requirement does not apply. Does Not •Not Observable •Not Applicable pplicable C403.2.9 :Ducts and plenums sealed based on [ME10]2 static pressure and location. •Complies Requirement will be met. Location on plans/spec: MP0.1 III Does Not •Not Observable ❑Not Applicable C403.2.9. Ductwork operating >3 in. water ;■Complies 1.3 column requires air leakage testing. [ME11]3 Exception: Requirement does not apply. ■Does Not ■Not Observable •Not Applicable 1 High Impact (Tier 1) 2 f Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 10 of 17 Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions C403.2.9, Ductwork operating >3 in. water •Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. •Does Not [ME11]3 •Not Observable •Not Applicable C403.2.9. Ductwork operating >3 in. water •Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. •Does Not [ME11]3 •Not Observable •Not Applicable C403.2.9. Ductwork operating >3 in. water .00omplies Exception: Requirement does not apply. 1.3 column requires air leakage testing. •Does Not [ME11]3 '❑Not Observable ❑Not Applicable C403.2.9. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing.'El-Does Not [ME11]3 ;❑Not Observable ❑Not Applicable C403.2.9. Ductwork operating >3 in. water ,OComplies Exception: Requirement does not apply. 1.3 column requires air leakage testing. •Does Not [ME11]3 ❑Not Observable ■ Not Applicable C403.2.9. Ductwork operating >3 in. water EComplies Exception: Requirement does not apply. 1.3 column requires air leakage testing. j❑Does Not [ME11]3 ❑Not Observable ❑Not Applicable C403.3 Air economizers provided where EComplies Requirement will be met. [ME62]1 required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. ❑Does Not ❑Not Observable Location on plans/spec: Mechanical Floorplans and schedules ; • Not Applicable C403.3 Air economizers provided where ❑Complies Requirement will be met. [ME62]1 required, meet the requirements for •Does Not design capacity, control signal, controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation, Location on plans/spec: mechanical schedules and floor plans Na Observable •ventilation I�Not Applicable pp C403.4.2 Temperature reset by representative '❑Complies Requirement will be met. [ME69]3 building loads in pumping systems for •Does Not chiller and boiler systems >500,000 Location on plans/spec: M4.1 ENot Observable Btu/h. ❑Not Applicable C403.4.2. Hydronic systems greater than ❑Complies ;Requirement will be met. 4 500,000 Btu/h designed for variable ❑Does Not [ME68]3 fluid flow.;❑Not Observable Location on plans/spec: M4.1 ❑Not Applicable C403.4.2. System turndown requirement met EComplies Requirement will be met. 5 through multiple single-input boilers, ❑Does Not [ME107]3 one or more modulating boilers, or a combination of single-input and ;Not Observable Location on plans/spec: M0.1, M4.1 ❑Not Applicable modulating boilers. Boiler input between 1.0 MBtu/h and 5 MBtu/h has See the Mechanical Systems list for values. 3:1 turndown ratio, boiler input between 5.0 MBtu/h and 10 MBtu/h has 4:1 turndown ratio, boiler input > 10.0 MBtu/h has 5:1 turndown ratio. 1 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 11 of 17 Section # & Reg.ID 1 t Mechanical Rough -In Inspection Complies? Comments/Assumptions C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. EComplies Exception: Requirement does not apply, See the Mechanical Systems list for values. •Does Not MI Not Observable •Not Applicable C403.4.4. Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply. 6 of individual zone boxes have static ■ Does Not [ME110]3 pressure setpoint reset controls. See the Mechanical Systems list for values. ■Not Observable •Not Applicable C403.4.4. , Multiple zone VAV systems with DDC •Complies Exception: Requirement does not apply. 6 of individual zone boxes have static ❑Does Not [ME110]3 pressure setpoint reset controls. See the Mechanical Systems list for values. ENot Observable ENot Applicable C403.4.4. Multiple zone VAV systems with DDC ❑Complies Exception: Requirement does not apply. 6 of individual zone boxes have static ❑Does Not [ME110]3 pressure setpoint reset controls. See the Mechanical Systems list for values. ❑Not Observable ❑Not Applicable C403.4.4. Multiple zone VAV systems with DDC •Complies Exception: Requirement does not apply. 6 of individual zone boxes have static ■Does Not [ME110]3 pressure setpoint reset controls. See the Mechanical Systems list for values. •Not Observable ❑Not Applicable C403.4.4. Multiple zone VAV systems with DDC EComplies ;Exception: Requirement does not apply, 6 of individual zone boxes have static ❑Does Not [ME110]3 pressure setpoint reset controls. ENot Observable See the Mechanical Systems list for values. Not Applicable C403.4.4. Multiple zone VAV systems with DDC EComplies Exception: Requirement does not apply. 6 of individual zone boxes have static ❑Does Not [ME110]3 pressure setpoint reset controls. See the Mechanical Systems list for values. ['Not Observable ■Not Applicable C404.2.1 Gas-fired water -heating equipment ❑Complies Requirement will be met. [ME111]2 installed in new buildings: where a singular piece of water -heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency •Does Not • , ;M Not Observable IENot Applicable >= 90 Et. Where multiple pieces of water -heating equipment serve the building with combined rating >= 1,000 kBtu/h, the combined input - capacity -weighted -average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual :dwelling units and equipment <= 100 kBtu/h. C408.2.2. Air outlets and zone terminal devices ;■Complies Requirement will be met. 1 have means for air balancing. :❑Does Not [ME53]3❑Not Observable Location on plans/spec: Mechanical Floorplans ENot Applicable C403.5, Refrigerated display cases, walk-in :EComplies Requirement will be met. C403.5.1, coolers or walk-in freezers served by •Does Not C403.5.2 remote compressors and remote •Not Observable [ME123]3 condensers not located in a condensing unit, have fan -powered condensers that comply with Sections •Not Applicable C403.5.1 and refrigeration compressor systems that comply with C403,5.2.. Additional Comments/Assumptions: 1 High Impact (Tier 1) E 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 12 of 17 1 High Impact (Tier 1) 1 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 13 of 17 Section # & Req.ID Final Inspection Complies? ! Comments/Assumptions C303.3, C408.2.5. 3 [F18]3 Furnished O&M manuals for HVAC■Complies systems within 90 days of system •Does Not acceptance. :•Not Observable •Not Applicable C403.2.2 HVAC systems and equipment ❑Complies Requirement will be met. [F127]3 capacity does not exceed calculated •Does Not loads. Location on plans/spec: Mechanical Schedules ■Not Observable ❑Not Applicable C403.2.4. . Heating and cooling to each zone is ;❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum one humidity control device Location on plans/spec: Mechanical Floorplans ■Not Observable installed per ■ Not Applicable humidification/dehumidification system. _ C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. •Does Not [F147]3 Minimum one humidity control device ❑Not Observable installed Location on plans/spec: mefchanical floorplans per humidification/dehumidification■Not Applicable system. C403.2,4, Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. •Does Not [F147]3 Minimum one humidity control device Location on plans/spec: mechanical floorplans •Not Observable installed per ■Not Applicable humidification/dehumidification system. _ C403.2.4. Heating and cooling to each zone is •Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [F147]3 Minimum humidity control device Location on plans/spec: mechanical floorplans one •Not Observable installed per ■Not Applicable pp humidification/dehumidification system. C403.2.4. Heating and cooling to each zone is •Complies Requirement will be met. 1 controlled by a thermostat control. ■Does Not [FI47]3 Minimum one humidity control device❑Not Observable Location on plans/spec: mechanical floorplans per installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ,❑Complies Requirement will be met. 1 controlled by a thermostat control. ;❑Does Not [F147]3 Minimum one humidity control device ❑Not Observable Location on plans/spec: mechanical floorplans per installed humidification/dehumidification ;❑Not Applicable system. C403.2.4. Heating and cooling to each zone is IS Complies Requirement will be met, 1 controlled by a thermostat control. Does Not [F147]3 Minimum one humidity control device'❑Not Observable Location on plans/spec: Mechanical Floor plans per installed humidification/dehumidification l❑Not Applicable system. C403.2.4. Thermostatic controls have a 5 °F ❑Complies Requirement will be met. 1.2 deadband. :❑Does Not [F138]3 Location on plans/spec: M4.1 ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint •Complies Requirement will be met. 1.3 overlap restrictions. ❑Does Not [F120]3 ❑Not Observable ENot Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename. S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 14 of 17 Section # & Req.ID Final Inspection Complies? Comments/Assumptions C403.2.4. Each zone equipped with setback 2 `controls using automatic time clock or [F139]3 programmable control system.• ,■Complies Requirement will be met. ■Does Not Not Observable ■ Not Applicable • C403.2.4. Automatic Controls: Setback to 55°F :•Complies Requirement will be met. 2.1, (heat) and 85°F (cool); 7-day clock, 2- •Does Not C403.2.4. hour occupant override, 10-hour• 2.2 backup Not Observable ■ Not Applicable [F140]3 • C403.2.4. Systems include optimum start '❑Complies Exception: Requirement does not apply. 2,3 controls. ICIDoes Not [F141]3 ❑Not Observable ENot Applicable C403.2.4. ;Systems include optimum start ❑Compiles Exception: Requirement does not apply. 2.3 controls. ❑Does Not [F141]3 IN Not Observable ❑Not Applicable C403.2.4. Systems include optimum start :❑Complies Exception: Requirement does not apply. 2.3 controls. ❑Does Not [F141]3 •DNot Observable; ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies ; Exception: Requirement does not apply. 2.3 controls. ❑Does Not [F141]3 ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies • Exception: Requirement does not apply. 2.3 controls. ❑Does Not [F141]3 :Not Observable ❑Not Applicable C403.2.4. Systems include optimum start❑Complies Exception: Requirement does not apply. 2.3 controls. ❑Does Not [F141]3 pilot Observable. ❑Not Applicable • C403.2.4. Systems include optimum start EComplies Exception: Requirement does not apply. 2.3 controls. ❑Does Not [F141]3 [Not Observable ❑Not Applicable C404.3 ' Heat traps installed on supply and ;❑Complies Exception: Requirement does not apply. [FI11]3 discharge piping of non-circulating ❑Does Not systems. ❑Not Observable ❑Not Applicable C404.3 Heat traps installed on supply and ❑Complies Exception: Requirement does not apply. [FI11]3 discharge piping of non-circulating ;❑Does Not systems. ;❑Not Observable ❑Not Applicable C404.4 All piping insulated in accordance with ;❑Complies 'Requirement will be met. [F125]2 section details and Table C403.2.10. ❑Does Not Location on plans/spec: MP0.1 ❑Not Observable ❑Not Applicable 1 High Impact (Tier 1) 12 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 15 of 17 Section # & Req.ID Final inspection Complies? 1 Comments/Assumptions C404.4 All piping insulated in accordance with ❑Complies Requirement will be met. [F125]2 section details and Table C403.2.10. ❑Does Not ❑Not Observable Location on plans/spec: MP0.1 ❑Not Applicable C404.6.1 Controls are installed that limit the ❑Cornplies Exception: Requirement does not apply. [F112]3 operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. ❑Does Not Not Observable ; • Not Applicable C404.6.1 Controls are installed that limit the .❑Complies Requirement will be met. [F112]3 operation of a recirculation pump ❑Does Not installed to maintain temperature of a Location on plans/spec: M4.1 Not Observable •storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. Not Applicable C408.2.1 Commissioning plan developed by .■Complies [F128]1 registered design professional or approved agency. '❑Does Not :Not Observable Not Applicable C408.2.3. HVAC equipment has been tested to ;■Complies 1 ensure proper operation. ; ■ Does Not [F131]1 •Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been ❑Complies 2 tested to ensure proper operation, ❑Does Not [FI10]1 calibration and adjustment of controls. ENot Observable ❑Not Applicable C408.2.3. Economizers have been tested to •Complies 3 ensure proper operation. ❑Does Not [FI32]1 ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report •Complies [F129]1 completed and certified by registered design professional or approved agency. II Does Not ❑Not Observable ❑Not Applicable C408.2.5. Furnished HVAC as -built drawings ❑Complies 1 submitted within 90 days of system EDoes Not [F17]3 acceptance. :Not Observable [Not Applicable C408.2.5. An air and/or hydronic system ❑Complies 3 balancing report is provided for HVAC ❑Does Not [F143]1 systems. •Not Observable ■ Not Applicable C408.2.5. Final commissioning report due to •Complies 4 building owner within 90 days of ❑Does Not [F130]1 receipt of certificate of occupancy. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 (Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Silt Farms Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Report date: 04/29/20 Page 16 of 17 Project Title: Silt Farms Report date: 04/29/20 Data filename: S:\BGProjects\10120.00 Silt Farms Indoor Cultivation Facility\Engineering\Mechanical\Calculations\Silt Farms - ComCheck.cck Page 17 of 17 COMcheck Software Version 4.1.1.0 rift i 1 Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Additional Efficiency Package(s) Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B X C) 1 -Manufacturing Facility 19100 1.05 20112 Proposed Interior Lighting Power A Total Allowed Watts = 20112 B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. 1 -Manufacturing Facility LED 1: R1: Other: LED 3: R3: Other: LED 4: S2: Other: LED 5: S3: Other: LED 6: S4.4: Other: LED 7: S4.8: Other: LED 8: W1: Other: LED 9: S1: Other: Exemption:Plant Growth Lighting 1 39 21 819 1 28 19 535 1 259 40 10412 1 69 38 2656 1 19 10 198 1 12 21 250 1 4 20 80 1 621 1045 Exempt Total Proposed Watts = 14949 Interior Lighting PASSES: Design 26% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.) and to comply with any applicable mandatory requirements listed in the Inspection Checklist. JESSICA WOODY - ELECTRICAL ENGINEER Name - Title Sig nate 10/18/2019 Date Project Title: Data filename S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 1 of 7 111111 COMcheck Software Version 4.1.1.0 Afii Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 2015 IECC New Construction 1 (Developed rural area) Owner/Agent: Designer/Contractor: Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts / Unit Wattage (B X C) Walkway (Walkway < 10 feet wide) Tech Doors (Other door (not main entry)) 1226 ft of 0.7 Yes 858 36 ft of door 20 Yes 720 Total Tradable Watts (a) = 1827 Total Allowed Watts = 1827 Total Allowed Supplemental Watts (b) = 500 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 500 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Parking ( Parking area 6222 ft2): Tradable Wattage Walkway ( Walkway < 10 feet wide 1226 ft of walkway length). Tradable Wattage LED 1: ZB1: BOLLARDS: Other: Tech Doors ( Other door (not main entrv136 ft of door width: Tradable Wattage LED 2: ZW1: WALLPACK: Other: 4 22 88 1 5 125 Total Tradable Proposed Watts = 623 711 Exterior Lighting PASSES: Design 69% better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1and to comply with any applicable mandatory requirements listed in the Inspection Checklist. JESSICA WOODY - ELECTRICAL ENGINEER Name - Title Signatu e 10/18/2019 Date Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 2 of 7 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2015 IECC Requirements: 64.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section & Req.ID Plan Review C103.2 Plans, specifications, and/or [PR4]1 calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies? ❑ Complies ❑Does Not ['Not Observable ❑ Not Applicable C103.2 Plans, specifications, and/or [PR8]1 calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. ❑ Complies ❑ Does Not :Not Observable ❑ Not Applicable Comments/Assumptions C406 Plans, specifications, and/or [PR9]1 calculations provide all information with which compliance can be determined for the additional energy efficiency package options. ❑ Complies ❑Does Not ❑ Not Observable ❑ Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 3 of 7 Section # & Req.ID Rough-In Electrical Inspection j Complies? ; ` Comments/Assumptions C405.2.1 Lighting controls installed to uniformly [EL15]1 reduce the lighting load by at least 50%. ❑Complies Exception: Areas such as security or emergency areas that need continuous lighting. ; •Does Not •Not Observable ❑Not Applicable C405.2,1 [EL18]1 Occupancy sensors installed in❑Complies required spaces. Requirement will be met. •Does Not •Not Observable ■Not Applicable C405.2.1, Independent lighting controls installed C405.2.2. per approved lighting plans and all 3 manual controls readily accessible and; [EL23]2 visible to occupants. ,❑Complies Requirement will be met. ;•Does Not ■Not Observable ■ Not Applicable C405.2.2. Automatic controls to shut off all 1 building lighting installed in all [EL22]2 buildings. ;❑Complies EDoes Not Requirement will be met. ■Not Observable ■Not Applicable C405.2.3 Daylight zones provided with [EL16]2 individual controls that control the lights independent of general area lighting. ; •Complies Requirement will be met. •Does Not ;•Not Observable ■Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. ❑Complies Requirement will be met. "'Does Not •Not Observable ■Not Applicable C405.2.3, Enclosed spaces with daylight area C405.2.3. under skylights and rooftop monitors,•Does 1, are equipped with required lighting C405.2.3. controls. E❑Not 3 [EL21]1 ❑Complies Exception: Requirement does not apply. Not Observable ❑Not Applicable C405.2.4 :Separate lighting control devices for ;❑Complies [EL4]1 specific uses installed per approved :•Does lighting plans. ,❑Not Requirement will be met. Not ■Not Observable Applicable ; C405.2.4 Additional interior lighting power [EL8]1 allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. •Complies Requirement will be met. •Does Not ■Not Observable ■ Not Applicable C405.2.5 [EL25]nall Automatic lighting controls for exterior;❑Complies lighting installed. Controls will be ,❑Does daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Not Requirement will be met. ■Not Observable ■ Not Applicable pp C405.3 Exit signs do not exceed 5 watts per [EL6]1 face. ❑Complies ❑Does Not Requirement will be met. ■ Not Observable ■Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 4 of 7 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) Low Impact (Tier 3) Project Title: Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Report date: 10/18/19 Page 5 of 7 Section # & Req.ID Final Inspection Complies? Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. ❑Complies •Does Not ■Not Observable; •Not Applicable C405.4.1 Interior installed lamp and fixture [F118]' lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts, ❑Complies ❑Does Not See the Interior Lighting fixture schedule for values. •Not Observable ■ Not Applicable C405.5.1 [F119]' Exterior lighting power is consistent with what is shown on the approved '•Does lighting plans, demonstrating ;❑Not proposed watts are less than or equal to allowed watts. ■ Complies See the Exterior Lighting fixture schedule for values. Not Observable Not Applicable C408.2.5. Furnished as -built drawings for 1 electric power systems within 90 days [F116]3 of system acceptance. ❑Complies •Does Not ❑Not Observable ■Not Applicable C408.3 . Lighting systems have been tested to ;■Complies [F133]1 ensure proper calibration, adjustment, ;El programming, and operation. -Does Not ■Not Observable •Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Report date: 10/18/19 Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Page 6 of 7 Project Title: Report date: 10/18/19 Data filename: S:\BGProjects\10120.00 Spring Born Indoor Cultivation Facility\Engineering\Electrical\Lighting\Calcs\10120.00 COMCheck.cck Page 7 of 7