HomeMy WebLinkAboutEngineer's Letter - Deep Foundation Support Recommendations 11.06.2019K±A Kumar & Awn Maas, Illi,. Geotechnical and Materials Engineers and Environmental Scientists An Employee Owned Company 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (AQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado November 6, 2019 Springborn Greenhouses Attn: Charles Barr 2000 Broadway, Apt. 203 San Francisco, California 94115 chart es (rucharlesbarr.n et RECEIVED MAY li u "ITN GARFIELD COUNTY COMMUNITY DEVELOPMENT >ts 1 Ass arli ras Project No. 19-7-561 Subject: Deep Foundation Support Recommendations, Proposed Greenhouse and Tech Building, Dry Hollow and Colorado River Roads, Garfield County, Colorado Dear Mr. Barr: As requested by SGM, we are providing additional recommendations for the building foundation support at the subject site. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated October 14, 2019, Project No. 19-7-561. The building perimeter will be supported by continuous walls and the interior by isolated columns. Column loadings range between about 5 to 10 kips for the greenhouse and 20 to 55 kips for the tech building. Considerable grading is proposed to flatten the building area with a cut depth: up to about 5 feet at the southeast corner of the tech building and about 8 feet of fill depth at the northwest corner of the greenhouse. At the design building pad grade, soil depths above dense gravel are estimated at about 12 to 22 feet. DRILLED PIERS — TECH BUILDING We recommend straight -shaft piers drilled into the underlying dense gravel soil be used for foundation support of the tech building. The design and construction criteria presented below should be observed for a straight -shaft, drilled pier foundation system. 1) The piers should have a minimum diameter of 12 inches and be designed for an allowable end bearing pressure of 12,000 psf and a skin friction of 1,000 psf for that portion of the pier embedded in the sand and gravel. Pier penetration through the upper clay soils/structural fill should be neglected in the skin friction calculations. Settlement of piers bearing in the dense gravel soils under sustained loading is expected to be minor, less than r/2 inch and essentially occur during construction. Down -drag from negative skin friction in the silty clay soils can be neglected provided structural fill is placed well in advance of the drilled pier installation. Springborn Greenhouses November 6, 2019 Page 2 2) All piers should have a total embedment length of 10 feet and a minimum penetration into the gravel soil of 2 feet. 3) Lateral load analysis of piers can be performed with the software analysis package LPILE. We believe this method of analysis is appropriate for piers with a pier embedment length to diameter ratio of 5 or greater. Suggested criteria for LPILE analysis are presented in the following table: Soil Type Silty Clay Sandy Gravel Recommended p -y Curve Model Stiff Clay w/o Free Water (Rees) Sand Density (pci) 0.065 0.075 Friction Angle (degrees) - 35 k — Above Water (pci) 30 225 Undrained Cohesion, c (psf) 500 - Strain Factor, E50 0.010 - 4) No reduction in axial load resistance is needed for piers spaced a minimum of 3 pier diameters (center -to -center). At one diameter (piers touching), the skin friction reduction factor for both piles should be 0.5. Interpolation can be used between one and three diameters. 5) For lateral loading, no reduction is needed of piers in-line with the direction of lateral loads with a minimum spacing of 6 pier diameters (center to center). If a closer spacing is required, the modulus of subgrade reaction for the initial and trailing piles should be reduced according to the following table. Reductions to the modulus of subgrade reaction can be accomplished in LPILE by inputting the appropriate modification factors for p -y curves. Pile Spacing (Center to Center) 3 Pile Diameters 4 Pile Diameters 5 Pile Diameters 6 Pile Diameters or More Lead Row 0.7 0.85 1.0 1.0 2nd Row 0.5 0.65 0.85 1.0 3rd and Higher Rows 0.35 0.5 0.7 1.0 6) The pier holes should be properly cleaned prior to placement of concrete. The natural silty clay soils are generally medium stiff which indicates that casing of the holes should not be required. Some caving and difficult drilling may be experienced in the bearing soils due to gravels and cobbles. Placing concrete in the pier hole immediately after drilling is recommended. Kumar & Associates, Inc. 0 Project No. 19.7-561 Springborn Greenhouses November 6, 2019 Page 3 7) The pier drilling contractor should mobilize equipment of sufficient size to achieve the design pier sizes and depths. 8) A representative of the geotechnical engineer should observe pier drilling operations on a full-time basis. HELICAL PIERS - GREENHOUSE We recommend piers that extend down into the underlying dense gravel soil be used for foundation support of the greenhouse. The piers should derive their downward load capacity from the dense. gravel soil and the upper clay soils/structural fill should be neglected in the load capacity. Down -drag from negative skin friction in the silty clay soils due to structural fill placement can be neglected for a smooth shaft such as helical piers. Rough shafts such as drilled and grouted micro -piles may have reduced load capacity assuming a friction angle acting on the shaft of about 18 degrees for the depth of compressible natural clay soils below the structural fill. The downward load capacity of the helical piers will depend on the pier shaft and helix sections and could vary between about 20 to 40 kips. Settlement of piers bearing in the dense gravel soils under sustained loading is expected to be minor, less than V2 inch and essentially occur during construction. Battered piers are normally used for lateral load capacity of the foundation. Piers should be spaced at least 3 feet from center to center to avoid reduction from group action. Chemical testing was not performed on the onsite soils. Although it has been our experience that the pier capacity and steel section will greatly exceed the design value and the required design life of the pier system will not be compromised, the pier contractor should verify that the piers have adequate corrosion protection for the site. Exterior grade beams and pier caps should have a minimum depth of 3 feet for frost protection and void form below them is not needed. We should observe installation of the helical piers on a full time basis. If you have any questions or need further assistance, please call our office. Sincerely, Kumar & Associates, Inc. Steven L. Pawla Rev. by: DEH SLP/kac cc: SGM, Inc SGM, Inc — Jerry Burgess (ierryb(cpsgm-inc.com) — Mindy Nastal (mindyn(ilsgm-inc.com) Kumar & Associates, Inc. e Project No. 19.7-561