Loading...
HomeMy WebLinkAboutEngineer's Report - Foundation 04.06.2018W=-!* nlvz�-STxr.7.rerrx.,rz;,arsz RJAbszrA.vnLz►r (�xlNEI' S DATE: 06 April 2018 PROJECT: NEXO Merchant Plant Infill. Foundation Design. Garfield County, Colorado. TO: Brian Gallager, NEXO Project Managing Engineer 1389 Center Drive, Ste 120 Park City, Utah 84098 617-352-0417 448 Will Avenue Rifle, Colorado 81650 970-625-2774 Phone westar@rof.net E -Mail Brian. At your request I performed a visual inspection of the foundation for the new building your are constructing near Rifle, Colorado. The work generally complied with the design drawings with the exception of the reinforcing bar locations and clearances. The contractor was advised of the issues and they were corrected. Photos for your information are attached. Let me know if you need anything else. Sincerely. Stephen A. Kesler Stephen A. Kesler, P.E. President xc: File Attachments: (4) Site Inspection Photos. Page 1 of 3 Page 2 of 3 Page 3 of 3