HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-05-20-6276 and SEPT -05-20-6277
Jose Olivas
New Single -Family Residence
18 Native Springs Drive, Rifle
Native Springs — Lot 5
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.)
AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED
"GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 1,500 P.S.F.
4) PRIOR TO FOUNDATION INSPECTION BUILDING LOCATION TO BE STAKED/CERTIFIED BY
PROFESSIONAL LICENSED SURVEYOR TO CONFIRM BUILDING IS LOCATED WITHIN THE
PLATTED BUILDING ENVELOPE.
5) DWELLING UNIT REQUIRES INSTALLATION OF RESIDENTIAL FIRE -SPRINKLER SYSTEM.
VERIFY REQUIREMENTS & COORDINATE INSPECTIONS WITH RIFLE FIRE DISTRICT,
INCLUDING FIRE DISTRICT ROUGH -IN APPROVAL AT FRAME INSPECTION. ROUGH -IN
INSPECTION REQUIRED AT FRAME INSPECTION AND FIRE DISTRICT SIGN-OFF/APPROVAL
REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
6) ON-SITE WASTEWATER TREATMENT SYSTEM TO BE INSPECTED BY A PROFESSIONAL
ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE SIGN-OFF/APPROVAL
REPORT FROM PUBLIC HEALTH DEPARTMENT PRIOR TO FINAL BUILDING INSPECTION
& CERTIFICATE OF OCCUPANCY.
7) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.