Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-6-20-6331 Colorado Rocky Mountain School Alteration of Existing Building Kitchen, Serving and Dishwashing Areas 1493 County Road 106 — Carbondale, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2015 IBC, IMC, IPC, IFGC AND 2009 IFC & IECC, AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND INSPECTIONS POLICY. 3) WORK SHALL COMPLY WITH "RURAL" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE, AS WELL AS ALL CONDITIONS OF THE SPECIAL USE PERMIT. 4) PRIOR TO CONSTRUCTION, APPLICANT SHALL CONTACT LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING: FIRE ALARM SYSTEM, EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL REPORT FROM FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION. 5) VERIFY COMPLIANCE WITH EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS PER SECTION 1010. VERIFY EXIT DIRECTIONAL SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 6) ACCESSIBILTY OF THIS BUILDING SHALL COMPLY WITH 2015 I.B.C., CHAPTER 11, AND ICC/A117.1- 2009 STANDARDS. 7) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 IBC, CHAPTER 12. 8) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AIR, DUCTWORK & VENTING REQUIREMENTS PER INTERNATIONAL MECHANICAL CODE (IMC) AND IECC, SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION. 9) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC) AND INTER- NATIONAL FUEL GAS CODE (IFGC). PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 10) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAMING INSPECTION, AND ELECTRICAL FINAL SIGN -OFF APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 11) COORDINATE ALL CHANGES TO KITCHEN, SERVING AND WASHING AREAS WITH GARFIELD COUNTY PUBLIC HEALTH. FINAL INSPECTION BY PUBLIC HEALTH IS REQUIRED PRIOR TO FINAL INSPECTION BY BUILDING DEPARTMENT.