HomeMy WebLinkAboutRe-bar & Stair Framing 10.16.2019From: Theodore Guy Ikga@lkga.net 6'
Subject: Re: A frame
Date: October 16, 2019 at 12:36 PM
To: Neiley Law Firm, LW aspenlaw@neileylaw.com
•
I have reviewed the construction photos of the rebar and stair framing connection. 1NIth 2 - # 5 vertical rebers In
the sono -tubes this Is acceptable.
Theodore K Guy, AIA, PE
Theodore K Guy Associates PG
on oct 16, 201q, at 12:1a PM, Neiley Law Firm, l_LG <aspenlawanellef lau,com> wrote:
Hi, Ted, We failed our foundation/big foot inspection this morning because there are no details
in the plans for the piers.
Our contractor has put the grid of no. 5 rebar on 3 inch centers in each of the big foots, per the
attached photo, and will put 2 doles of no, 5 rebar in each sono tube. Can you spec that and
approve the photo?
Also, I have attached a photo of the connection between the top of the piers and the framing.
Will that work or do we need to add blocking? Can you approve the photo?
Thanks.
Rick
Richard Y. Neiley, Jr.
Neiley Law Firm, LLC
aspenlawfcneileylaw cord
Glenwood Office: 6800 Highway 82, Suite 1, Glenwood Springs, CO 81601
Aspen Office: 420 East Main Street, Suite 230, Aspen, CO 81611
(970) 928-9393 Telephone
(970) 928-9399 Fax
(Please mail correspondence to Glenwood Springs address.)
<Correction Notice.pdf><IMG_1321 10161q.JPG><IMG_1323 10161q.JP6>
Theodore 1< Guy AIA PE
Picsffent
fhCsi'<iri ICGllj,lsi'KlatesPc
P.O. Ho% 16-1 n
WI Soo lllsP.7' 1)11ve
Oa nit, CO 1:10.1
9/0.9>1.116?
�V.M,aarfv
r1`S P,c7t;
ti
X98
•
SFR;.9„1 4
/40. e. ?. c1.4)\
`'��►�r�s��1s�Y.s ��►n