Loading...
HomeMy WebLinkAboutRe-bar & Stair Framing 10.16.2019From: Theodore Guy Ikga@lkga.net 6' Subject: Re: A frame Date: October 16, 2019 at 12:36 PM To: Neiley Law Firm, LW aspenlaw@neileylaw.com • I have reviewed the construction photos of the rebar and stair framing connection. 1NIth 2 - # 5 vertical rebers In the sono -tubes this Is acceptable. Theodore K Guy, AIA, PE Theodore K Guy Associates PG on oct 16, 201q, at 12:1a PM, Neiley Law Firm, l_LG <aspenlawanellef lau,com> wrote: Hi, Ted, We failed our foundation/big foot inspection this morning because there are no details in the plans for the piers. Our contractor has put the grid of no. 5 rebar on 3 inch centers in each of the big foots, per the attached photo, and will put 2 doles of no, 5 rebar in each sono tube. Can you spec that and approve the photo? Also, I have attached a photo of the connection between the top of the piers and the framing. Will that work or do we need to add blocking? Can you approve the photo? Thanks. Rick Richard Y. Neiley, Jr. Neiley Law Firm, LLC aspenlawfcneileylaw cord Glenwood Office: 6800 Highway 82, Suite 1, Glenwood Springs, CO 81601 Aspen Office: 420 East Main Street, Suite 230, Aspen, CO 81611 (970) 928-9393 Telephone (970) 928-9399 Fax (Please mail correspondence to Glenwood Springs address.) <Correction Notice.pdf><IMG_1321 10161q.JPG><IMG_1323 10161q.JP6> Theodore 1< Guy AIA PE Picsffent fhCsi'<iri ICGllj,lsi'KlatesPc P.O. Ho% 16-1 n WI Soo lllsP.7' 1)11ve Oa nit, CO 1:10.1 9/0.9>1.116? �V.M,aarfv r1`S P,c7t; ti X98 • SFR;.9„1 4 /40. e. ?. c1.4)\ `'��►�r�s��1s�Y.s ��►n