Loading...
HomeMy WebLinkAboutGrading PlanOP RIS ENGINEERING, LLC - - _ ; f _ _- . -� . •'JPLa - 511/9wn lS �� ' FCNZ uLTANTY Hat"-- Tw..D MLI.EX AND l 1 1•IT'f11V1 VI 131 u ' -'- r DM IOK01116 - •„n I • I.. 4 . it F _:_j. lI I I• jr• ' 55 Ti LT •,� 211377 4:. DESIGNED BY %%K 00/00/00 l • Dir. DRAWN BY 1001 00/00/00 f — — 1 1 :i Nw „ ,. _ �/ sw P4R I r CHECKED BY 500 00/00/00 s.DATES ..Jy t• OB -23-2020 LOT 2, BIG R COMMERCIAL PARK SUBDIVISION RIFLE, COLORADO GRADING PLAN • VICINITY MAP: LOT I SCALE: 1"--100. EROSION CONTROL NOTES: ' NAYLHl 1Np-. 1 MATIN mom. MAICAIDRIRN A— FPn - I CONTRACTOR MUST UTILIZE 'BEST MANAGEMENT PRACTICES' (BMP), TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION '2. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL TEMPORARY EROSION �A. I — I{ CONTROL MEASURES 31].77 Ir•AERulm ANI — — ^ ^ — L �' �' B y T • �' I 31” .. _ `? ' 7. DUST CAUSED BY EXCAVATION, TOPSOIL REMOVAL OPERATIONS. OR ROAD BASE PLACEMENT SHALL BE CONTROLLED BY THE CONTRACTOR AT HIS EXPENSE THE ENGINEER MAY REQUIRE THE CONTRACTOR AT ANY TIME TO DISCONTINUE CONSTRUCTION ACTIVITIES UNTIL DUST CONDITIONS ARE REDUCED TO THE BM/W iTAMH li N1 31111 AM W14 O[1 yy+ II Pb,/ rIV11 AMA NOT lDIr 5151011/0P0.V 4.0 �. , I IL i� +J [LISTING .CLAM MILKING illi T6ATAIRW W RAMI I AU d Y I COUNTY'S SATISFACTION I 4 BMP'S STALL BE INSTALLED BEFORE ANY EARTH DISTURBING ACTIVITIES COMMENCE i 5 STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES SHALL NOT CAUSE, HAVE THE REASONABLE POTENTIAL TO CAUSE, OR MEASURABLY CONTRIBUTE TO AN EXCEEDANCE OF ANY WATER QUALM IBATIAG MIA • DRAINAGE SWAZI }'3 I STANDARD DAAPIAUF ^• y `, •. I I S SEDIMENT CAUSED BY ACCELERATED SOIL EROSION SHALL BE REMOVED FROM RUNOFF WATER BEFORE IT � N L1. `_3.7.- - 4. I T LEAVES THE CONSTRUCTION SITE Y OT 7 . MSI ID IEA 2 I 7. BULK STORAGE STRUCTURES FOR PETROLEUM PRODUCTS AND ANY OTHER CHEMICALS SHALL HAVE A SECONDARY CONTAINMENT OR EQUIVALENT PROTECTION TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLED MATERIAL FROM ENTERING STATE WATERS eeII 9 TXSTWN I.ui Al1A1 s MtnILIyA'tlXy I r •' Q L THE EROSION CONTROL PLAN SHALL BE CONTINUOUSLY UPDATED TO REFLECT NEW OR REVISED REST MANAGEMENT PRACTICES (EMP'S) DUE TO CHANGES IN DESIGN, CONSTRUCTION, OPERATION, OR .14 L L AD ALArr MO WOIRRDUI GIPVITOICIMG! OAAYNG!)11!All MEMPRECIPITATION , 1 3 I MAINTENANCE OF THE CONSTRUCTION SITE UPDATES MUST BE MADE WITHIN 72 HOURS FOLLOWING THE CHANGE IN BMPS I 4 THE CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE(INCWOING ALL BMP'S, STORAGE CONTAINERS, AND CONSTRUCTION EWIPMENT)AMINIMUM OF EVERY 14 CALENDAR DAYS AND WITHIN 24 HOURS AFTER EVENT OR SNOW MELT THAT MAY CAUSE SURFACE EROSION LI Pp I,� N Irl _ ' ladI I ' 10. THE CONTRACTOR SHALL KEEP A RECORD OF ALL INSPECTIONS ON SITE AND AVAILABLE FOR REVIEW BY COUNTY STAFF. INSPECTION REPORTS MUST IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE WITH THE I ---------"-'1.-"! I TERMS ANDCONDITONS OF THE PERMIT. N TA IF Ivs I1 STRAW BALES SHALL NOT BE USED FOR PRIMARY EROSION OR SEDIMENT CONTROL a E STRAW BALES MAY It BE USED FOR REINFORCEMENT BEHIND ANOTHER BMP SUCH AS SILT FENCE). _.!1 ," II is •115+ i+ �5 12. /IMP'S INTENDED FOR SHEET FLOW SEDIMENT RUNOFF SHALL BE PLACED PARALLEL TO THE SLOPE. 13, ALL BNP'S SHALL BE CLEANED WHEN SEDIMENT LEVELS ACCUMULATE TO HALF THE DESIGN OF THE BMP � em Art 11y i � —_ `•i _ _—_ _ _ I � --• ~• �• UNLESS OTHERWISE SPECIFIED j 14 A VEHICLE TRACKING PAD 5/TP) ANDIOR STABIUZED STAGING AREAS SHALL BE PLACED AT ALL EXITS FROM TIE SITE TO PREVENT TRACK -OUT ONTO CITY STREETS IF TRACK -OUT DOES OCCUR, THE CONTRACTOR _ II SHALL IMMEDIATELY SWEEP THE STREET OF DEBRIS b — — Nn ^} T 1 MOTS I—.��- 1{ I 1 it GRAPHIC SCALE {{ e 10 b • AW 1 15 ALL PORTA-POTTY STRUCTURES MUST BE FIRMLY SECURED LATH WN REBAR ANCHORS OR EQUAL MUST BE I PLACED AWAY FROM FLOW LINES OF STREET, SWAIES, RAIN GARDENS A AWAY FROM INLETS. 1fi STOCKPILES OF SOIL OR OTHER ERODABLEN MATERIALS MIST BE MANAGED SO TAT STORMWATER DOES NOT COME IN CONTACT WITH THE PILE AND POTENMLLY WASH POLLUTANTS OFFSITE ATMINIMUM 1 STOCKPILES SHALL BE ROUTINELY WETTED AND/OR BLANKETED AS WELL AS INCLUDE AN EROSION SOCK PERIMETER BARRIER TO PREVENT WIND EROSION AND SEDIMENT TRANSPORT OFFSITE STOCKPILES THAT • ARE INACTIVE FOR MORE THAN 7 DAYS WILL REQUIRE SOIL RINSER OR HAVE MUCLTVMULCH TACKIFIER APPUEG 1\ 17. EROSION CONTROL BLANKETS SHALL BE INSTALLED ON ALL SLOPES EXCEEDING 31. I ' = = - �L M ' 111 EXISTING CONTOURS ILLUSTRATED HEREIN ARE ATI FT INTERVAL, BASED ON AERIAL TOPOGRAPHY + { IN FEET I y 14n0h-HA N. ` IS PROPOSED CONTOURS ARE AT MFT INTERVALS i ` 25 SITE GRADING PROVIDES GENERAL DIRECTION FOR THE CONTRACTOR. SLOPES AS LABELED SHALL BE 1 111 DATE REVISION MAINTAINED. 21. THE UTIl1TE5 AS SHOWN, W1Y NOT REPRESENT ACTUAL FIELD CONDITIONS IT IS THE RESPONSIBILITY OF 00/90f00 XX% A A THE CONTRACTOR TO CONTACT ALL IDILITV COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION SEDIMENTATION LOS -I2 -AIN DIAMETER CONTROL L,..,?,,INSTALIIIAdTar�ENT SEDIMENT RLL o. 2 SEDIMENTECONNTTRO SSHHAALLTL BE INSTALLED PRIOR TOANY LAMA KTAM![INIIRIATAALIIRINI!D DISTURBING ACTnCS OII DIMIMENT CONTROL LOGS SHALL CONSIST OF STRAW 3•AFni MI AU AMNATOIP/RAOB TMTATCNIAL OST EKOELSIOR OR COCONUT FIBER. NESOORMENTCONCENTRATED SI..LHEDINTOTHE lam' T� sotum09559 PROPOSED LEGEND 5 AEOLLO SDFLSHAOWETR GROUND WE FABRCLMATERIAI EWUNTri te PRDPOSEOCONIOUR PROPOSED INTERVAL MID T.�LTAIRJR w'.IIR•.IIYFITIRAIrt CONTROLMLM II SEDIMENT MAINTENANCE NOTES 11VSIOOIOA CONTROL •^.I•y 50Y CANI.RLI,TAIwt5 (ANCHORED IN TRENCH) IP II CONTOUR Y mMWNP I' I ET ER PECT ENT LONE LOG Dr !ILIA OIKCY LOU DAILT DURING AND AFTERSHALANY SSTORM EVENT R MAKE ROP REPAIRS A• [L M4ALHOSNVWIPwl. S. OMtMAHliN1IOMnlTPB `V�' L2'MIN. .. ... .� - . .. . -"' .._. CLEANOUT UPSTREAM SEDIMENT AS NECESSARY MOYlMMfdAYAATEOURLALWOFIIYMMCCR ` r Nyle N><y _ } '�I, EXISTING LEGEND AAtt rA{Kn I LOOT OKLA 81BRVLICO VAFN.TN: IAIC.NOL /BP „ 'W4 ", I. ; I R N, EXISTING CONTOUfl TO EACH Dlr(s NATMIN I E HEIGHT OF ME CREST OF LOG ; SEDIMENT CONTROL LOGS SHALL BE REMOVED AT THE END OF Ll _ I � ,,{�� ] ^Hyrq, `^"11' =A.M.� IMMAL IEEE GRADING PLAN EgABA[SAERIAMO noN ONCE PROPER VEGETATION Has BEEN r OIAIpN ASTRUCTON. ONCEVEGETATION AS ERNEMovAP • I5125 LYELOVERED W,TH TOPsoILAND ifilitikYeC••7aa l • � RIGW MM. 4OEIATFI.11A41 A YAM. APRIOSCO M 1.4 CNlam"""OCM1°"- „ V1R ru � SECTION ywVl BAR`! A� u, I LL'.": DRAWING NO C2 0 SECTION A -A4 — Kt — SEDIMENT CONTROL LOG SIT SILT FENCE INSTALLATION SILT FENCE DETAIL VEHICLE TRACKING CONTROL TYPICAL SECTION - PARKING LOT 515NTS NTS NTS Nis