Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.gaffie ldcou n y_zo3 ri TYPE OF CONSTRUCTION FICommercial/Multi-Family Manufactured Home (Single or Multi -Level) Residential (5F, Duplex or Townhome) {n Reroof Demolition [J Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET INVOLVED PARTIES Property Owner: V i' t e ( rA pwl Phone: al ) 3 - dflo/ Mailing Address: 3 32 Ji_ �]eer c ou j_ /U. (r74.7 clod 1,15i co, /6s ©/ �%j 1 Email Address: Pal /4rrk)11dGrS e r1Gr ir;) ..ce,_ v1 Contractor: 46Gj l,1 J) )ddr In C. Phone: (97a) 3k9--- 11/0/ 1 Mailing Address: O 460)( 191- 5 6.7 C"5- Ce. A/So Z Email Address: VDi,n er-5 op71-i414;1 CGre"l Architect: Moat Oe S r5 !1 r5 Phone: (_)3 34p�.-k rJJ►rrile �7 /-y-,ruck,-/ 5r4 % Email Address: 1 ci 7o) ��7 -Z951 Mailing Address: Engineer: r7' avj gfpr ¢e5 Mailing Address: X y r 11-Z.-ci- {neer—� i61hp� . Co -n 1 Email Address: Manufactured Home Installer: Phone: ( ) Mailing Address: Email Address: PROJECT DETAILS — Phone: (`?7Q) 9`/y 6305 Describe Work: 01I / r ,. ' r�� e Job Address: 5'5 Z el e_ge., r?4,/ a 4: 5 3 c 1 Assessor's Parcel Number: �/ Sub. Lot I,d / Block Owner's Valuation of Work:�l$_ (t70, 144. pc Property Size (Sq. Ft. or Acres): Sq. Ft. of Building: ! "111P 4 Height: # of Floors: Class of Work: �► NPw ❑Remodel/Alteration Addition Garage: —;+ hed I Detached PROJECT DETAILS CONTINUED Septic: ,\0, jDWTS Natural Gas Type of Heat: Driveway Permit: NOTICE Exempt I-1 Propane Community Electric Other ❑ Permit #: Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION l hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. %f //.4('Y Id[-?Propertywner P int and Sign O ice/ (tel 4 / Date OFFICIAL USE ONLY Special Conditions: dusted Valuati is ;I � tVirta Plan Check Fee: X441 g. P r it Fee: `lir9375 Manu. H me Fee: iI A Misc. Fees: yA Total Fes: 1104'2.11 Fe s Paid: *MO .49 lance Due: 'D 3 70 BP No: g. 3Zo OWTS No: n r Se �s: i OCC Group: I p6 Const Type: I� / Zoning: g BUILDING / PLANNING • DIVISION : s v" " I / ` v.2 ✓ 219x Signed Approval Date los.41, CC) Ir([Dj24Z4 Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com BUILDING PERMIT FEE ESTIMATE WORKSHEET Applicant: rap Project Address: W' ow 1 M Phone: Lot: Block: This Section Determined 312 $74.68 Finished Living Space (N/A for Manufactured Homes) Unfinished Basement Manufactured Home Set -Up Fee $41.00 Foundation/ Crawl Space $0.00 $18.00 Garage (Conditioned) (i.e. insulation, sheetrock) 1152 $1,152.00 Garage (Unconditioned) $24.00 Covered Patio/Deck $18.00 Uncovered Patio/Deck $12.00 Misc: $33.68 Misc: Total Valuation $0.00 $1,350,4047111 This Section Determined by Garfield County Plan Review Fee Building Permit Fee Manufactured Home Set -Up Fee $0.00 Septic Fee (OWTS) $0.00 Other (Ex: Road Impact Fee) Total Fees Due - - — $0.00 ***All fees are estimates until final plan review is complete NOTE: If any required information is missing, delays in issuing the permit are to be expected. If determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road Impact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. Orgc I PaychA Property Owner Print and ign Date Garfield County BUILDING DEPARTMENT 108 Eighth Street, Suite 401, Glenwood Springs, CO 81601 Tel: (970) 945-8212 PLAN REVIEW CHECKLIST Permit No:Pi.Re'06-- 7.0-10920 Building Issues �� /� Engineered Foundation WA Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/ Topography 30% Attach Residential Plan Review List Subdivision Plat Notes Nl/A N/A Fire Department Review / Valuation Determination/ Fees Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed Plan Reviewer to Sign Application Parcel/ Schedule No. N/A 40# Snowload Letter — Manu. Homes X Soils Report Avg Planning/Zoning Issues Property Line Setbacks N/A 30 ft. Stream Setbacks WA Flood Plain Building Height Zoning Sign -Off VA Road Impact Fees Grade/ Topography 40% Planning Issues Subdivision Plat Description & Summary: reetet 'MPA -4 Pa. = N1/A Hetkif4'k Aref < 500 Se o x 474. k6 221400. $0 x 3�. 00 2711012. $ 41, X00.