Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-06-20-6317 New Lift Station Building Dakota Meadows Subdivision/Mid-Valley Metro District Sec 33, TO7S, R87W — Carbondale 1) ALL WORK TO COMPLY WITH 2015 I.B.C., I.M.C., I.P.C., I.F.G.C., I.F.C. AND 2009 I.E.C.C. IN ADDITION, WORK MUST COMPLY WITH STATE/FEDERAL REGULATIONS AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) WORK SHALL COMPLY WITH ALL CONDITIONS OF THE CURRENT LAND -USE PERMIT. 3) BUILDING IS APPROVED AS TYPE V-B, NON-SPRINKLERED CONSTRUCTION, OCCUPANCY GROUP F-2 "LOW -HAZARD FACTORY INDUSTRIAL" USE. 4) ALL STRUCTURES MUST BE LOCATED WITHIN ESTABLISHED EASEMENTS. 5) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 1,500 P.S.F. BEARING CAPACITY. 6) ENGINEER OF RECORD TO PERFORM INSPECTIONS RELATED TO MECHANICAL, PLUMBING & ELECTRICAL SYSTEMS AND SUBMIT REPORT PRIOR TO FINAL BUILDING INSPECTION. 7) C.D.P.H.E. APPROVAL & SIGN -OFF REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) EGRESS REQUIREMENTS AS PER 2015 I.B.C., CHAPTER 10. EXIT DOOR SHALL HAVE LANDING ON EACH SIDE OF DOORWAY WITH MINIMUM SIZE OF 36" X 36". 9) LOCKS, LATCHES & DOOR LANDINGS PER 2015 I.B.C., SECTION 1008. 10) STAIRWAY, LANDINGS AND RAILINGS AS PER I.B.C., SECTIONS 1011 AND 1014. 11) LIGHT AND VENTILATION PER 2015 I.B.C., CHAPTER 12. 12) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 13) GARFIELD COUNTY BUILDING DEPARTMENT'S FINAL INSPECTION & CERTIFICATE OF OCCUPANCY IS REQUIRED.