Loading...
HomeMy WebLinkAboutCorrespondenceDave Argo From: Dave Argo Sent: Thursday, July 25, 2019 8:54 AM To: 'infoestudioforma@gmail.com' Cc: 'maggietolan@gmail.com' Subject: Copy of Soils Report Santiago: I have reviewed plans for your new residence located at the Ranch at Roaring Fork, but before we can finalize our plan review we need for you to send over to us a digital copy of the Soils Report as referenced on the Structural Engineer's plans. As you know, the building permit cannot be issued until the land use change has been finalized, and this is related to issues that Glenn Hartmann has been working on together with you. Per my recent conversation with Glenn, it sounds like this should be finalized in the next couple of weeks, and as soon as Glenn tells me it's OK, we will issue the building permit. Thanks for your assistance — Dave Argo Plans Examiner Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Tel: 970-945-8212 Ext. 1610 Email: dargo@garfield-county.com Web: garfield-county.com 1 Dave Argo From: Dave Argo Sent: Thursday, August 1, 2019 3:44 PM To: 'Forma Estudio' Subject: Re: Copy of Soils Report Santiago: Thanks for checking in with us again. After talking with Glenn, I think we're just waiting for the 10-day call-up period to expire. Once that happens I will be able to sign -off on the building permit and then you will be hearing back from the ladies at the front desk about permit pick-up instructions & final balances due for when you come in to pick up. Dave Argo Plans Examiner CGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Tel: 970-945-8212 Ext. 1610 Email: dargo@garfield-county.com Web: garfield-county.com From: Forma Estudio [mailto:infoestudioforma@gmail.com] Sent: Thursday, August 1, 2019 2:56 PM To: Dave Argo <dargo@garfield-county.com> Subject: [External] Re: Copy of Soils Report Hi Dave, I was wondering if there is any comments or if there is anything you would like me to do while we wait for the wetland permit. So that once we have that we are good to go. Let me know Cheers! Santi El jue., 25 de jul. de 2019 a la(s) 13:04, Forma Estudio (infoestudioforma c,�gmail.com) escribio: Hi Dave, I just did the site visit with Glenn and he mentioned a discrepancy in the elevations, I just checked and in one anotation it says 6208 as the 100 year flood plain, thats a typo, you can check in the survey by the surveyor and the pre construction elevation certificate to verify that the floodplain is at the 6205 elevation. Let me know if you want me to go and check anything else with you Cheers! 1 Dave Argo From: Dave Argo Sent: Thursday, August 8, 2019 2:42 PM To: 'Forma Estudio' Subject: Re: Copy of Soils Report Santiago: The "open hole" report is done by your Geotechnical Engineer as a follow-up to their original soils report. They will need to come out to the job site after the hole has been excavated but before any concrete is placed. After they have provided you with this report (typically one or two pages), our Building Inspector will ask to review their report to confirm conclusions & requirements of the original soils report — or any necessary changes if required — prior to your initial concrete pour for the footings. Dave Argo Plans Examiner . Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Tel: 970-945-8212 Ext. 1610 Email: dargo@garfield-county.com Web: garfield-county.com From: Forma Estudio [mailto:infoestudioforma@gmail.com] Sent: Thursday, August 8, 2019 1:38 PM To: Dave Argo <dargo@garfield-county.com> Subject: [External] Re: Copy of Soils Report Hi Dave, I was checking the permit and I just have a question regarding one comment. When you say that an Open hole soil report is needed for the footing inspection, do you mean that I have to show him the soil study that we already did? Thanks El jue., 1 de ago. de 2019 a la(s) 14:55, Forma Estudio (infoestudioforma@gmail.com) escribio: Hi Dave, I was wondering if there is any comments or if there is anything you would like me to do while we wait for the wetland permit. So that once we have that we are good to go. Let me know A Cheers! 1 Dave Argo From: Dave Argo Sent: Wednesday, August 21, 2019 1:56 PM To: 'Forma Estudio' Subject: RE: [External] Re: Amended Plans It's up to you, but understandable if you want to consolidate any additional foundation revisions all at one time. If you were going the other direction (lowering finish floor elevation) it would be a bigger issue, because of floodplain development permit requirements. It is important enough of a change that our office should have a record of this floor elevation change in our files. Dave Argo Plans Examiner CGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Tel: 970-945-8212 Ext. 1610 Email: dargo@garfield-county.com Web: garfield-county.com From: Forma Estudio [mailto:infoestudioforma@gmail.com] Sent: Wednesday, August 21, 2019 1:51 PM To: Dave Argo <dargo@garfield-county.com> Subject: [External] Re: Amended Plans Thanks! Shouldn't I wait to check if we might do some other changes? I told that to the inspector the other day and he did't say anithing about changing the plans. Can I wait at leat until the framing is done to check if we do some other change so that I submit one time? What do you think? El mie., 21 de ago. de 2019 a la(s) 13:28, Dave Argo `dargo(garfield-county.com) escribio: Saniago: Probably the easiest way to update your plans is to submit a revision to your site plan if it includes a reference actual elevation for the 100"-0" datum elevation. If you update that site plan & send over a PDF via email to me, we can process that very quickly. 1 Typically if you submit "Amended Plans" to our office at the front desk, we need (2) copies and it takes us between 3 — 5 business days for turnaround time. Since I will be gone for the next couple of weeks on vacation, if you can get to me before Friday, I should be able to approve before I leave at the end of this week. Dave Argo Plans Examiner 1-41111:field County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Tel: 970-945-8212 Ext. 1610 Email: dargo@garfield-county.com Web: oortield-county.com From: Forma Estudio[mailto:infoestudioforma@gmail.com] Sent: Wednesday, August 21, 2019 11:09 AM To: Dave Argo <darro@garfield-county.com> Subject: [External] Re: Copy of Soils Report Hi Dave, I have a question, so because we found water higher than expected we had to fill the holes and the top of footers are going to be 16 inches higher than what the plans say. So I decided to lift the 100 just 6" What's the process for that change? Thanks 2