Loading...
HomeMy WebLinkAboutSoils Report 05.06.2019It+A Kutner & Assoc 1 , Ilnc. Geotechnical and Materials Engineers and Environmental Scientists 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com An Employee Owned Company www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado y ASSOrrary SUBSOIL STUDY FOR FOUNDATION DESIGN PROPOSED RESIDENCE LOT 68, FILING 2, PINYON MESA PINYON MESA DRIVE GARFIELD COUNTY, COLORADO PROJECT NO. 19-7-221 MAY 6, 2019 PREPARED FOR: PMGC2, LLC ATTN: RON NORMAN 6300 RIGLEA PLACE, SUITE 900 FORT WORTH, TEXAS 76116 r-rnormanci •sbcg1obalaiet TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY - 1 - PROPOSED CONSTRUCTION - 1 - SITE CONDITIONS - 1 - FIELD EXPLORATION - 2 - SUBSURFACE CONDITIONS - 2 - FOUNDATION BEARING CONDITIONS - 3 - DESIGN RECOMMENDATIONS - 3 - FOUNDATIONS - 3 - FLOOR SLABS - 4 - UNDERDRAIN SYSTEM - 5 - SURFACE DRAINAGE - 5 - LIMITATIONS - 6 - FIGURE 1 - LOCATION OF EXPLORATORY BORING FIGURE 2 - LOG OF EXPLORATORY BORING FIGURE 3 - SWELL -CONSOLIDATION TEST RESULTS TABLE 1- SUMMARY OF LABORATORY TEST RESULTS Kumar & Associates, Inc. Project No. 19-7.221 PURPOSE AND SCOPE OF STUDY This report presents the results of a subsoil study for a proposed residence to be located on Lot 68, Filing 2, Pinyon Mesa, Pinyon Mesa Drive, Garfield County, Colorado. The project site is shown on Figure 1. The purpose of the study was to develop recommendations for foundation design. The study was conducted in accordance with our agreement for geotechnical engineering services to PMGC2, LLC, dated April 8, 2019. A field exploration program consisting of an exploratory boring was conducted to obtain information on subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibility or swell and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation. This report summarizes the data obtained during this study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsoil conditions encountered. PROPOSED CONSTRUCTION At the time of our study, design plans for the residence had not been developed. The building is proposed in the area of the exploratory boring location shown on Figure 1. Similar to the other residences proposed in the development, we assume basement or below grade levels will not be constructed. Grading for the structure is assumed to be relatively minor with cut depths between 2 and 3 feet. For the purpose of our analysis, foundation loadings for the structure were assumed to be relatively light and typical of the proposed type of construction. When building loadings, location and grading plans are available, we should be notified to re- evaluate the recommendations contained in this report. SITE CONDITIONS The property was vacant at the time of our exploration. The boring was drilled within the building area. The site is vegetated with grass and weeds and scattered sagebrush. The ground Kumar & Associates, Inc. Project No. 19-7-221 2 surface is relatively flat and slopes gently down to the northwest with about 3 feet of elevation difference across the building area. A natural dry drainage is located between Paintbrush Drive to the northeast and Pinyon Mesa Drive. FIELD EXPLORATION The field exploration for the project was conducted on April 17, 2019. One exploratory boring was drilled at the location shown on Figure 1 to evaluate the subsurface conditions. The boring was advanced with a 4-inch diameter continuous flight auger powered by a truck -mounted CME- 45B drill rig. The boring was logged by a representative of Kumar & Associates. Samples of the subsoils were taken with a 2-inch I.D. spoon sampler. The sampler was driven into the subsoils at various depths with blows from a 140-pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils. Depths at which the samples were taken and the penetration resistance values are shown on the Log of Exploratory Boring, Figure 2. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS A graphic log of the subsurface conditions encountered at the site is shown on Figure 2. The subsoils consist approximately 6-inches of topsoil, underlain by stiff to very stiff, sandy clay and silt from 'A to 10 feet, underlain by very stiff, sandy clay from 10 to 23 feet, underlain by dense, silty, clayey, sand and gravel from 23 to 32 feet, underlain by dense/hard sand and silt down to 36 feet. The soils encountered in the boring are variable and generally similar to the soils encountered at other nearby lots. Laboratory testing performed on samples obtained during the field exploration included natural moisture content and density, and percent fines (percent passing the No. 200 sieve). Swell - consolidation testing was performed on relatively undisturbed drive samples of the silt and clay subsoils. The swell -consolidation test results, presented on Figure 3, indicate low compressibility under relatively light surcharge loading. The samples of sandy silt and clay and Kumar & Associates, Inc. Project No. 19-7-221 3 sandy clay from 5 and 15 feet showed a low expansion or collapse potential when wetted under a constant light surcharge load. The laboratory testing is summarized in Table 1. No free water was encountered in the boring at the time of drilling and the subsoils were slightly moist. FOUNDATION BEARING CONDITIONS The sandy silt and clay soils encountered at expected shallow cut depth tend to settle when they become wetted. A shallow foundation placed on the sandy silt and clay soils will have a high risk of settlement if the subsoils become wetted. It will be critical to the long-term performance of the structure that the recommendations for surface grading and drainage contained in this report be followed to limit potential wetting of the bearing soils. The amount of settlement, if the bearing soils become wet, will mainly be related to the depth and extent of subsurface wetting. Settlement in the event of subsurface wetting could be 1 to 2 inches and likely cause building distress. Mitigation methods such as deep compaction, a deep foundation (such as piles or piers extending down around 25 feet below existing ground surface) or a heavily reinforced mat foundation designed by the structural engineer can be used to support the proposed house with a lower risk of settlement. Presented below are recommendations for shallow spread footings and slab -on -grade floor bearing on compacted structural fill. If a deep foundation or mat foundation is desired, we should be contacted to provide further design recommendations. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory boring and the nature of the proposed construction, the building can be founded with spread footings bearing on compacted structural fill with a risk of settlement and possible building distress. The design and construction criteria presented below should be observed for a spread footing foundation system. 1) Footings placed on at least 3 feet of compacted structural fill should be designed for an allowable bearing pressure of 1,500 psf. Based on experience, we expect initial settlement of footings designed and constructed as discussed in this section Kumar & Associates, Inc. Project No. 19-7-221 4 will be about 1 inch or less. Additional settlement on the order of 1 to 2 inches could occur if deep wetting of the subsoils were to occur. 2) The footings should have a minimum width of 20 inches for continuous walls and 2 feet for isolated pads. 3) Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. 4) Continuous foundation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 14 feet. Foundation walls acting as retaining structures should also be designed to resist a lateral earth pressure corresponding to an equivalent fluid unit weight of at least 55 pcf. 5) The topsoil and any loose or disturbed soils should be removed in the building area. The natural silt and clay soils in footing areas should be sub -excavated to at least 3 feet below design bearing level and to at least 1'/z feet beyond footing edges. The exposed soils in footing area should then be moistened and compacted. Structural fill can consist of the onsite silt and clay soils compacted to at least 98% of standard Proctor density at near optimum moisture content. 6) A representative of the geotechnical engineer should conduct compaction testing during structural fill placement and observe all footing excavations prior to concrete placement to evaluate bearing conditions. FLOOR SLABS The natural on -site soils, exclusive of topsoil, can be used to support lightly loaded slab -on -grade construction with a risk of settlement similar to that for spread footings. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of relatively well graded sand and gravel such as road base should be placed beneath interior slabs for support. This material should consist of Kumar & Associates, Inc. Project No.19-7.221 -5- minus 2 inch aggregate with at least 50% retained on the No. 4 sieve and less than 12% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on - site silty soils or a suitable imported granular soil devoid of vegetation, topsoil and oversized rock. UNDERDRAIN SYSTEM Although free water was not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below -grade construction such as basement areas be protected from wetting and hydrostatic pressure buildup by an underdrain system. Slab -on -grade areas and crawlspaces less than 4 feet deep should not be provided with an underdrain. Where needed, the drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free -draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1 % to a suitable gravity outlet. Free -draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 11/2 feet deep. An impervious membrane such as 20 mil PVC should be placed beneath the drain gravel in a trough shape and attached to the foundation wall with mastic to prevent wetting of the bearing soils. SURFACE DRAINAGE Providing proper surface grading and drainage will be critical to keeping the bearing soils dry and limiting potential for building settlement and distress. The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. Kumar & Associates, Inc. Project No. 19-7-221 6 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in paved areas. Free -draining wall backfill (if any) should be covered with filter fabric and capped with about 2 feet of the on -site soils to reduce surface water infiltration. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation should be located at least 10 feet from foundation walls. Consideration should be given to use of xeriscape to reduce the potential for wetting of soils below the building caused by irrigation. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory boring drilled at the location indicated on Figure 1, the proposed type of construction and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory boring and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear to be different from those described in this report, we should be notified at once so re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and Kumar & Associates, Inc. Project No. 19.7.221 7 monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications of the recommendations presented herein. We recommend on -site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. Sincerely, Kumar & Associates, Inc. 44,44,4 Shane J. Robat, P.E. Project Manager Reviewed by: Steven L. Pawlak, SJR/kac cc: F&M Architec (mike@iyfandmarchitects.com) Kumar & Associates, Inc. Project No. 19-7-221 -- . �� 1 / \ 1 1 I i 1 / � j 1 1r � 1 / \ 1 { Fr/ / \` j a� ,,6t70� � � , f / / jl f �- — — — —��so_ /\ `C- - - /r _ / 6iN Q r 1 F I / /y\ ts\ \ 1 / / / t IV / • \ ._- , / I / , __. 1 / e� // \� I /I \ / �\ / i �/ // / • / / \ LOT 69 / / r - - I /' — —6195— --,L __ ,\,' / / \ ,, BORING 1/68 > / ' / F \�/ ‘ LOT 68 /' / i ▪ / \ N. r / / �' LOT 67 / / r -...„// / i N. i \ N. 20 0 20 40 APPROXIMATE SCALE -FEET Con 19-7-221C Kumar & Associates LOCATION OF EXPLORATORY BORING Fig. 1 DEPTH -FEET — 0 - — 5 10 — 15 — 20 -- 25 — 30 35 — 40 BORING 1/68 LEGEND EL. 6196' 16/12 13/12 WC=6.1 DD=98 21/12 WC=9.5 DD=108 —200=89 17/12 WC=6.9 DD=102 35/12 WC=5.1 DD=109 —200=85 43/12 56/12 7 F 779 x"9 TOPSOIL; ORGANIC, CLAY AND SILT, FIRM, BROWN, MOIST. CLAY AND SILT (CL—ML); SANDY, STIFF TO VERY STIFF, SLIGHTLY MOIST, TAN, SLIGHTLY CALCAREOUS WITH DEPTH. CLAY (CL); SANDY, VERY STIFF, TAN, SLIGHTLY MOIST, TAN, CALCAREOUS WITH DEPTH. GRAVEL AND SAND (GM, SM); SILTY, CLAYEY, DENSE, SLIGHTLY MOIST, TAN. SAND AND SILT (SM—ML); DENSE/HARD, MOIST, TAN. DRIVE SAMPLE, 2—INCH I.D. CALIFORNIA LINER SAMPLE. 16/12 DRIVE SAMPLE BLOW COUNT. INDICATES THAT 16 BLOWS OF A 140--POUND HAMMER FALLING 30 INCHES WERE REQUIRED TO DRIVE THE SAMPLER 12 INCHES. NOTES 1. THE EXPLORATORY BORING WAS DRILLED ON APRIL 17, 2019 WITH A 4—INCH DIAMETER CONTINUOUS FLIGHT POWER AUGER. 2. THE LOCATION OF THE EXPLORATORY BORING WAS MEASURED APPROXIMATELY BY PACING FROM FEATURES SHOWN ON THE SITE PLAN PROVIDED. 3. THE ELEVATION OF THE EXPLORATORY BORING WAS OBTAINED BY INTERPOLATION BETWEEN CONTOURS ON THE SITE PLAN PROVIDED. 4. THE EXPLORATORY BORING LOCATION AND ELEVATION SHOULD BE CONSIDERED ACCURATE ONLY TO THE DEGREE IMPLIED BY THE METHOD USED. 5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY BORING LOG REPRESENT THE APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL. 6. GROUNDWATER WAS NOT ENCOUNTERED IN THE BORING AT THE TIME OF DRILLING. 7. LABORATORY TEST RESULTS: WC = WATER CONTENT (%) (ASTM D 2216); DD = DRY DENSITY (pcf) (ASTM D 2216); —200 = PERCENTAGE PASSING NO. 200 SIEVE (ASTM D 1140). 19-7-221C Kumar & Associates LOG OF EXPLORATORY BORING Fig. 2 CONSOLIDATION - SWELL CONSOLIDATION - SWELL 1 0 —1 — 2 — 3 — 4 1 0 — 1 — 2 — 3 4 SAMPLE 0F: Sandy Silt and Clay FROM: Boring 1/68 ® 5' WC = 6.1 %, DD = 98 pcf rill I I i I l EXPANSION UNDER CONSTANT PRESSURE UPON WETTING I 1.0 APPLIED PRESSURE — KSF 10 SAMPLE OF: Sandy Clay FROM: Boring 1/68 ® 15' WC = 6.9 %, DD = 102 pcf >ne.s u.e r.eea.lrop6y wet to e erg. rn. r.pon 'ha•e S. ,.pehe.d...c.pe In tor, .Ultent rn..ntten ,ppr,,,, of x,e er nna a.cc1cne., Hp. rill Cnninklt tyn loinyfl p.re.rrfl.t{ in ntnordcnc.:dh 0- 546. 10 APPLIED PRESSURE — KSF 10 100 L.. I ADDITIONAL COMPRESSION UNDER CONSTANT PRESSURE DUE TO WETTING i 1 ; I 1_. j t I i 100 19-7-221C 6 Kumar & Associates SWELL —CONSOLIDATION TEST RESULTS Fig. 3 ICA SAMPLE LOCATION BORING 1/68 DEPTH (f 5 10 15 20 Kumar & Associates, Inc. Geotechnical and Materials Engineers and Environmental Scientists kumarusa.com NATURAL MOISTURE CONTENT 6.1 9.5 6.9 5.1 NATURAL DRY DENSITY _ (Pcn 98 108 102 109 TABLE 1 SUMMARY OF LABORATORY TEST RESULTS GRADATION GRAVEL (%) SAND (%) ATTERBE RG LIMRS PLASTIC INDEX PERCENT PASSING NO. LIQUID LIMIT 200 SIEVE 89 85 (%) UNCONFINED COMPRESSIVE STRENGTH (psf) Project No. 19-7-221 Lot 68 SOIL TYPE Sandy Silt and Clay Sandy Clay Sandy Clay Sandy Clay 1