Loading...
HomeMy WebLinkAboutEngineer's Certification of OWTS 08.21.202011C+A Komar & Associates, Inc.® Geotechnical and Materials Engineers and Environmental Scientists 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com An Employee Owned Company www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado August 21, 2020 Tito Montes c/o Palomino Design Build Attn: Jack Palomino 919 Palmer Avenue Glenwood Springs, Colorado 81601 (jackpalotnino55 cr,gtnail.com) Project No. 18-7-532.02 Subject: Certification of Onsite Wastewater Treatment System, Proposed Residence, 46291 Highway 6, Canyon Creek area, Garfield County, Colorado Gentlemen: A representative of Kumar & Associates observed the installation of the Onsite Wastewater Treatment System (OWTS) for the residence at the subject site as required by the Garfield County Environmental Health Department. Our observations and recommendations are presented in this report. The services are supplemental to Kumar & Associates agreement for professional services to Tito Montes dated November 1, 2018. We previously designed the OWTS for the residence as submitted in our report dated February 4, 2019, Project No. 18-7-532.02. The system was designed for three bedrooms. We performed our as -built evaluations on July 21, 22, and 27, 2020. The OWTS components observed included: sewer line, cleanout, septic tank, effluent line, distribution box and soil treatment area (STA) and the locations of these components. The installation and locations of the system components were verified as shown on Figure 1. Pictures of the OWTS components made during the site visit are included with this report. An additional shallow profile pit was excavated at the west end of the STA to verify the soils in this area of the site. The distance locations to the septic tank shown on Figure 1 were made by taping. The septic tank, distribution box and STA chambers were changed from the design by the installer. The septic tank was changed from the design 1,000 gallon, two -chamber Valley Precast septic tank to a 1,250 gallon, two -chamber low -profile Norwesco plastic septic tank. The distribution box was changed from a Tuf-tite 4 -hole distribution box to a precast concrete 8 -hole distribution box. The STA chambers were changed from Infiltrator Quick4 Plus Standard chambers to ARC36 chambers. Due to the size difference in the chambers, the STA was changed from 3 rows of 18 Infiltrator Quick4 Plus Standard chambers to 3 rows of 14 ARC36 chambers to increase the STA to a similar size to our design. The changes are deemed acceptable to us. It is our opinion that the OWTS was installed in general conformance with the above referenced design. Tito Montes August 21, 2020 Page 2 The observations and recommendations presented above are based on our site observations and our experience in the area. We make no warranty either express or implied. Alterations to the system or improper backfill and site grading could affect the operation and effectiveness of the OWTS. Please feel free to contact us if you have any questions regarding this letter. Respectfully Submitted, Kumar & Associates, Inc. f /Atm__;b' Shane M. Mello, Staff Engineer Reviewed by: David A. Young, SMM/kac attachments: cc: A� �iT� rti 6 GI ,rR 414 `•`4frd Drawing JJJ Construction — Israel Marioni {ujconstruction0# f 2Agmaij_com) Kumar & Associates, inc. Project No. 184-532.02