Loading...
HomeMy WebLinkAboutAddendum to Unfinished BasementMECHANICAL ROOM (FUTURE DEVELOPMENT TO UNFINISHED BASEMENT) WILL INCLUDE: -WATER HEATER - CYSTERN CONTROL - PRESSURE TANK - WATERLINE/ TAP MATCH BUMP OUT TO MASTER BATHROOMS' ADDENDUM TO UNFINISHED BASEMENT (FUTURE ROOMS/DEVELOPMENT HILL SIDE to 00 BATHROOM STORAGE LOAD BEARING WALL 24 LAM. BEAM OFFICE 13 LOAD BEARING W4LL- STAIRS/ CLGSET UNDER BEDROOM #3 ri *FOR THE UNFINISHED BASEMENT,THE ONLY INTERIOR WALLS THAT WILL BE FRAMED ARE THE LOAD BEARING AND THE STAIRWAY, �— WINDOW EGRESS 4E048 WALK OUT BASkT FRENCH ODORS 72" FACING THE ROAD WINDOW EGRESS WINDOW EGRESS 48X48 *'exterior walls to be furred out 2x6 with R 19 insualtion **EPA Certified Wood burning stove to be installed 1600 SF Summers Heat brond. WINDOW 30"X60" WINDOW EGRESS 48X48 48X48 1"=10'