Loading...
HomeMy WebLinkAboutCommercial Plan Review ChecklistGarfield County BUILDING DEPARTMENT 1U8 Eighth Street Suite 4U1, blenwood Springs, CO 81601 Tel: (970) 945-8212 Commercial Pian Review Checklist Permit Number: Oki 4'U L a1(4 " I d' s QyV STEP 1: STEP 2: Reference Building Code: 2015 IRC DETERMINE THE USE OR USES OF THE BUILDING a. b. c. d. e. Determine the appropriate occupancy classification(s) Check for potential incidental accessory occupancies Determine if the building, if a mixed -occupancy condition, was designed using the separated, non -separated or accessory occupancy provisions Review for fire sprinkler requirements based on occupancy classification and related factors Check for hazardous materials that will be used or stored within building DETERMINE DETAILED BUILDING ATTRIBUTES • Determine square footage per floor ■ Determine grade plane elevation • Determine height of building in feet ■ Determine height in stories above grade plane ■ Check for basements ■ Check for mezzanines, or confirm areas labeled as mezzanines • Determine lowest level of fire department vehicle access ■ Determine if building is required to be fire sprinklered or not l STEP 3: DETERMINE THE TYPE OF CONSTRUCTION n STEP 4: STEP 5: DETERMINE LOCATION OF THE BUILDING ON THE SITE g Determine amount of open frontage Determine fire resistance of exterior walls Determine protection of openings Identify any assumed property lines between two buildings on the same lot Review projections DETERMINE ALLOWABLE BUILDING SIZE A. B. C. D. Determine tabular building height and area Calculate height increases in stories Calculate height increases in feet Calculate area increase i. Sprinkler increase ii. Frontage increase STEP 6: DETERMINE ALLOWABLE BUILDING AREA IF MULTI -STORY BUILDING Ll STEP7: DETERMINE MIXED -OCCUPANCY APPLICATIONS ➢ Accessory occupancies ➢ Non -separated occupancies ➢ Separated occupancies i. Determine fire -resistive separation requirements ii. Check missed area ratio ❑ STEP 8: Commercial Plan Review Checklist — Page 2 COMPARE ACTUAL CONDITIONS VS. MAXIMUM ALLOWABLES • Verify areas are acceptable for determined type of construction & occupancies D Verify accepted building height/stories for type of construction & occupancies STEP 9: REVIEW SPECIAL OCUPANCY PROVISIONS El STEP 10: REVIEW MEANS OF EGRESS D Occupant Toad > Number of exits, width and remoteness ➢ Egress illumination D Exit signs D Other means of egress elements LJ STEP 11: DETERMINE ACCESSIBILITY REQUIREMENTS D Accessible means of egress > Accessibility scoping requirements Il STEP 12: DETERMINE FIRE RESISTANCE OF ASSEMBLIES > Exterior walls > Fire walls > Fire barriers > Fire partitions > Horizontal assemblies D Shaft enclosures D Smoke barriers > Smoke partitions n STEP 13: DETERMINE DETAILED FIRE PROTECTION REQUIREMENTS & FIRE AREAS > Type of sprinkler system > Detailed requirements & fire areas Y Type and location of alarms D Type and location of standpipes ➢ Type of fire protection system supervision STEP 14: DETERMINE INTERIOR FINISH REQUIREMENTS Ei STEP 15: DETERMINE INTERIOR ENVIRONMENT REQUIREMENTS > Ventilation D Temperature control D Lighting > Yards or courts > Sound transmission 1 STEP 16: DETERMINE ALL OTHER APPLICABLE DETAILED CODE REQUIREMENTS > Foundations D Roof structures D Concrete D Masonry D Steel > Wood > Glass & glazing > Plastics > Elevators D Special construction Commercial Plan Review Checklist— Page 3 I� STEP 17: DETERMINE GENERAL STRUCTURAL REQUIREMENTS ➢ Verify reference building code = 2015 IBC ➢ Verify design snow Toad requirements: o 40 PSF up to 7000 feet elevation o 50 PSF 7001— 8000 feet elevation o 75 PSF 8001— 9000 feet elevation o 100 PSF above 9001 feet elevation ➢ Verify frost depth: o 36 inches up to 8000 feet elevation o 42 inches over 8001 feet elevation ➢ Verify wind speed requirements = 115 mph Ultimate Wind Speed ➢ Verify seismic design category — B or C per IRC, Figure R301.2 (2) *NOTE: Not all of the above steps will apply to all projects.