FILE NOTES
Did a framing inspection at 108 Hawthorne Way for permit # BLRE 07-20-6407. The construction did not
match the engineered drawing for the framing arou nd the door. The angle iron trimmers did not have
bearing onto the concrete foundation wall. The owner contacted the engineer Timothy A. Hayashi and
we discussed the framíng. The owner sent a pícture to the engineer and the number of screws were
determíned that went ínto the trimmers on both sides of the door. Based on the discussion, the
engineer determined the as build would work. See email from engíneer dated 9-8-2020.
The construction was also missing the vertical rigíd ínsulation to provide a thermal break between the
heated interior of the structure and the outdoors. The contractor will add the insulation and send a
picture prior to the building depaftment príor to covering the insulation.
I inspected for the smoke and co alarms. lt was also determined the basement was limited to a wet bar
rather than a kítchen.
I explained to the owner that there would be one more fínal inspection one the insulation was approved
and the work to button up the walkway and final trimmíng of the door was completed.
Andy Schwaller
September 8,2020
Andy Schwaller
From:
Sent:
To:
Cc:
Subject:
Andy Schwaller .
Monday, August 31,2020 10:01 AM
Tonia Elsrod
Lindsay Krol; Wade Patton; Sheryl Bower;Angela Roff; Timothy Hayashi
Building Permit BLRE-07020 -6407
Tonia,
We have added the addendum dated August 27,202Q to the permit file. ln order to complete the work covered under
this permit the following steps must be followed by you and your contractor:
1. Demo the door area to expose the existíng framing and foundation.
2. Call the engineer to inspect the existing construction and verify the design is correct.
3. Follow the enginee/s plans and dírections.
4. Once the new framing and foundatíon modifications are completed, call the county for an inspection prior to
covering up any work. Any deviations to the approved plans wíll require the engineer to inspect those changes.
5. Once the work is completed, call the county for a final ínspection.
We might have a correction list based on nonstructural provisions of the code. Please review the redlined items from
the approved plans for some of these items. Once you have a final inspection approved, we will close out the permít.
Please call if you have any questions.
Thanks,
Andy Schwaller
Building Official
Garfield County