HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
TYPE OF CONSTRUCTION
n Commercial/Multi-Family
n Manufactured Home (Single or Multi -Level)
Residential (SF, Duplex or Townhome)
Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET
•
INVOLVED PARTIES
[]Demolition
Q Reroof
Property Owner: Zane & Paige Haderlie Phone: ( 970 ) 618-4775
Mailing Address: PO Box 307 Rifle CO, 81650
Email Address: Zanehaderlie@msn.com paige@pollardteam.com
Contractor: J Caliber Construction
Mailing Address: PO Box 178 Silt, CO 81652
Phone: ( 970 ) 314-0489
Email Address: Jose@jcaliberconstruction.com
Architect: Krystyn Stanley
Mailing Address:
Email Address: krystynstanley@gmail.com
Phone: ( 801 ) 547-9447
Engineer: Studio M Engineering
Mailing Address: 250 Tripp Drive Rifle CO, 81650
Email Address: studiom.engineer@gmail.com
Phone:
970 366-8690
Manufactured Home Installer: n/a
Phone: (
Mailing Address: n/a
Email Address:
PROJECT DETAILS
Describe Work: 2.5 story single family residential house
Job Address: TBD
Assessor's Parcel Number: not yet assigned
Sub. legal Tract 37 AOD
Owner's Valuation of Work: $ 450,000
Sq. Ft. of Building: 2356
Lot Block
Class of Work: Dew
Garage: (Attached
Property Size (Sq. Ft. or Acres): 10.313 acres
Height: 22-7 # of Floors: 2.5
Remodel/Alteration []Addition
} Detached
\0/
PROJECT DETAILS CONTINUED
Septic: ••OWTS Community
Type of Heat: *Natural Gas Propane Electric Other
Driveway *Exempt Permit #:
Permit:
NOTICE
Authority. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
r1.. ate g- 071.0
Property 4 . ;
Ign
Date
OFFICIAL USE ONLY
Special Conditions:rE,f It i
(�trt Gf lam•
rr1'70 on:(r%
Ja` C' � °r
`ekes
I� 473,75
Manu. Hgnp�Fee:
//
Misc. Fees: I1 g'1. op
k
tal Fees:
./12%T (''l
Paid: . ,
1 V fJYr ✓W
lanceDue: 2
, I-7 0.31
No:
OWTS No:
yBP
Q o ���JJJ
SL ( 1 �
cepi - & qf!
F/K' 40'100
OCC Group: (R6
Const. Type: (Rc,
Zoning: R" ` p.„..
BUILDING / PLANNING
DIVISION :
4/17470
Signed Approval Date
_ CC,gj24-u
1
Valuation
Fees Sheet3
Garfield County
1Utf 5th street, suite 451
Glenwood Springs, CO 81601
(970) 94S-8212
r�rrv. nrl1Cld-t lUJtt. il11
BUILDING PERMIT
FEF. ESTIMATE
WORKSHEET
Applicant: I4ADERLT li
Project Address: TBD
Subdivision Antlers Orchard
Phone:
Lot: Tract 37
Block:
e of Splice - — : .
—
WxIM
$74.68
Finished Living Space (14/A for Manufactured Homes)
Unfinished Basement
$41.00
Foundation/ Crawl Space
$18.00
Garage (Conditioned) (i.e. insulation, sheetrock)
0 i'
$32.00
Garage (Unconditioned)
$24.00
Covered Patio/Deck
$18.00
Uncovered Patio/Deck
fritill
$12.00
Misc:
$33.68
Misc:
$0.00
Ltji Vxiuutiora
Chis.tieetiu Ihrlermieed h. Garticld f iunn�
Plan Review Fee
Building Permit Fee
Manufactured Home Set -Up Fee
IN
Septic Fee (OWTS)
Other (Ex: Road Impact Fee)
•*Alf fees are estimates until final plan review is completed**
X13
$0.00
$0.00
$0.00
NOTE: If any required information is missing, delays in issuing the permit are to be expected. If
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road Impact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
is 1/d
roperty Owner Print and Sign Date
Garfield County
BUILDING DEPARTMENT
108 Eighth Street, Suite 401, Glenwood Springs, CO 81601
Tel: (970) 945-8212
PLAN REVIEW CHECKLIST
Permit No: $1-tze-06-2O- C %Q
Building Issues
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ Topography 30%
Attach Residential Plan Review List
Subdivision Plat Notes
Fire Department Review
Valuation Determination/ Fees
Planning/Zoning Issues
N/A
Red Line Plans/ Stamps/ Sticker
Attach Conditions
Application Signed
Plan Reviewer to Sign Application
Parcel/ Schedule No.
40# Snowload Letter — Manu. Homes
Soils Report
AW"-
ROLetekt 3j0� x
6PAY416, I I I d 5 x
1'i ovw42 PK& x
tvA
N/A
Property Line Setbacks
30 ft. Stream Setbacks
Flood Plain
Building Height
Zoning Sign -Off
Road Impact Fees
Grade/ Topography 40%
f
Planning Issues
Subdivision Plat
Description & Summary:
Lo1ivzv t44v3
witti I,,w4rr ?.t t wD
1hi 4 414711.00
(Nol-f(i eksfriot
75OO = 27417
2.00 =
Mor
' 2T'4370.