Loading...
HomeMy WebLinkAboutScope of Work & Valuation9/11/2020 Project Scope for #30239 Hwy 6 & 24 Rifle, CO House Renovation 1. Bathroom — install a new vanity, renovate existing flooring, update toilet and tub and update lighting. 2. Install Washer/Dryer — convert the 2°d bedroom closet area to a laundry closet combo. 3. Kitchen — install new cabinets and sink, renovate flooring, install new/used appliances and update lighting. 4. Upgrade electrical wiring for the house. 5. Install (9) new windows, (2) exterior doors and (1) interior door. Install egress windows in all required areas. 6. Dry Wall Finish, Paint and Refinish Flooring — Install new skip trowel finish, cosmetically repair all dry wall patches and scratches, not to exceed 30 Sq. Ft., primer and paint interior of house, sand and refinish existing wood flooring. 7. Install a new onsite wastewater treatment system (OWTS). Take out of service and abandon in place the existing old OWTS concrete tank. Contractors and Subs General Contractor — Justin Page, Humboldt Construction (970-274-4089) Plumbing Sub — Dennis Brown, Reliant Plumbing & Heating (970-618-9300) Electrical Sub — Craig Nichols, Independent Electric (970-309-3590) OWTS Design — Carla Ostberg, CBO Septic Consulting (970-309-5259) Excavation and Dirt Work — Terry Gambrell, Teagle Excavating (970-379-1644) The house renovation project is estimated to take 10 to 12 weeks. The project is planned to start upon receiving a Garfield County Bldg. Permit. 9/11/2020 Estimated Valuation of Work #30239 Hwy. 6 & 24 Rifle, CO Item/Description Estimated Costs 1. General Contractor — Labor $20,000 2. General Contractor — Materials $4,000 3. Electrical — Labor and Materials $5,500 4. Plumbing — Labor and Materials $7,500 5. New Bathroom and Kitchen Cabinets — Materials $5,000 6. New or Used Kitchen Appliances — Materials $1,700 7. New or Used Stackable Washer and Dryer — Materials $800 8. New Windows (9) and Doors (3) — Materials $6,000 9. Painting and Refinishing Flooring — Materials and Labor $2,500 10. Install New Septic System — Materials and Labor $14,000 Total Estimated Valuation of Work Jeff and Cody Nelson .pwor i6 000. Do