Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-09-20-6508 & SEPT -09-20-6509 Harry & Kathryn Peisach New Single -Family Residence TBD Meadow Circle, Carbondale Ranch at Coulter Creek — Lot 8 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) AN OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION TO VERIFY SOILS BEARING CAPACITY AS FOLLOWS: ALLOWABLE BEARING PRESSURE = 2000 P.S.F. 4) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH BUILDING ENVELOPE REQUIREMENTS. 5) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS -BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25 -FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 6) ON-SITE WASTEWATER TREATMENT SYSTEM SHALL BE DESIGNED AND INSPECTED BY A COLORADO LICENSED PROFESSIONAL ENGINEER. PROVIDE ENGINEER'S FINAL REPORT & APPROVALS FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. DRAINFIELD MUST BE LOCATED FULLY WITHIN BUILDING ENVELOPE AS PER FINAL PLAT REQUIREMENTS. 7) PRIOR TO FINAL INSPECTION, PROVIDE RADON TESTING IN ACCORDANCE WITH RANCH AT COULTER CREEK'S FINAL PLAT (NOTE #17) AS FOLLOWS: "DUE TO THE POSSIBLE PRESENCE OF RADON GAS IN THE AREA, TESTING FOR RADON GAS SHALL BE DONE WHEN THE RESIDENCE HAS BEEN COMPLETED AND PRIOR TO ISSUANCE OFA CERTIFICATE OF OCCUPANCY." 8) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.