Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com TYPE OF CONSTRUCTION n Commercial/Multi-Family r BUILDING PERMIT APPLICATION [ I Manufactured Home (Single or Multi -Level) l Residential (SF, Duplex or Townhome) U Demolition .0 Reroof I J Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET INVOLVED PARTIES Property Owner:IZEADIZTFMATIff376 Phone: ( 970 y 379-1009 Mailing Address: P.O. BOX 130, GWS CO 81602 Email Address: mark@gouldconstruction.com Contractor: Gould Construction, Inc. Phone: (970 ) 945-7291 Mailing Address: P.O. Box 130, GWS CO 81602 Email Address: david@gouldconstruction.com or markjr@gouldconstruction.com Architect: Phone: ( Mailing Address: Email Address: Engineer: Sopris Engineering, Inc. Phone: ( 970 ) 704-0311 Mailing address: 502 Main Street, Carbondale CO 81623 Email Address: adostal@sopriseng.com Manufactured Home Installer: Phone: ( Mailing Address: _ Email Address: PROJECT DETAILS Describe Work: 3rd Phase of the Airport Mini -Storage facility. Includes 3 additional buildings with 150 Units. Job Address: 1097 CR. 116, Glenwood Springs, CO 81601 Assessor's Parcel Number: 5cc 218527100008 a1- I T /1S? [q (Zanse : Q'`� Sub. Lot Block Owner's Valuation of Work: $ 4 SO, 0 00 • op Property Size (Sq. Ft. or Acres): 8.49 ac Sq. Ft. of Building• Total 19,950 Height: is - I 1 # of Floors: 1 Class of Work: Garage: Y/ INew Remodel/Alteration nAttached 11 Detached Addition PROJECT DETAILS CONTINUED Septic: N/A nO WTS Type of Heat: N/A Driveway Permit: E dsJi NOTICE ❑Natural Gas Exempt Propane E Community Electric El Permit #: ❑ Other Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have provided the required nformation Property Owner Print and Sign )j di_- C Notice and Certification above, as well as, have rate to the best of my knowledge. Date OFFICIAL USE ONLY Special Con i ions: 12 0 hlYH A. Adjusted Valuation: g72,-j(b.00 Plan Check Fee: f2jI003. I.t'O P rmit Fee: ` 39082.E Manu. Home Fee: IY% Misc. Fees: d 7I11".c Total Fees: oP•06..v-1 Fees Paid: I1 t q AIL# alance Due: ft, I�.27 BP No: I OWT5 No:Ex ! Sr1 N6 —A Y*aG Setba ks: F7 g7.g3►b OCC Group: S _ } 1 Const. Type:a 8 Zoning: G (� /_ BUILDING / PLANNING DIVISION : IOI1 7OX, Signed Approval Date FD.» Iq l q. q'{, cc/1 v1 I2o-zo Garfield County BUILDING DEPARTMENT 108 Eighth Street, Suite 401, Glenwood Springs, CO 81601 Tel: (970) 945-8212 PLAN REVIEW CHECKLIST Permit No: 13L-C - OO-20- (✓( Building Issues NVA / Engineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/ Topography 30% coNtworciati Attach Plan Review List NSA Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees / Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed Plan Reviewer to Sign Application Parcel/ Schedule No. 40# Snowload Letter — Manu. Homes Soils Report / Ar4 St~ In4wyW4 a1i I,41'6 tui Planning/Zoning Issues f Property Line Setbacks 30 ft. Stream Setbacks _ Flood Plain Building Height Zoning Sign -Off Road Impact Fees Grade/ Topography 40% Planning Issues Subdivision Plat Description & Summary: 1136 Goin4•lvu4 Ofr Typt, Z-13 11 OeCitqattAat Cnrvti p: s-- 1 RCS I wirweA- 496,4. x 21 4111444.00 EA* Pi io ittehdsfviA( 40 x 20) 40 x 2c0 = �y 060 2 2Vb 5. ?� x Too - sped 41 Va1wt 1 vl . 21) OW x 72.5i 's 4'472)710. Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com COMMERCIAL OR MULTI -FAMILY BUILDING PERMIT APPLICATION CHECKLIST COMMERCIAL OR MULTI -FAMILY BUILDING PERMIT APPLICATION CHECKLIST In order to understand the scope of work intended and to expedite the issuance of a permit, it is important that complete information be provided. Please review this document to determine if you have adequate information to design your project and to facilitate a plan review. All applications are required to be submitted in person. APPLICATION FORM: Please make sure the following information is provided on the application. • Parcel number obtained from the County Assessor's Office.✓ • Job address (assigned physical address).,/ • Legal Description: block, lot, tract, subdivision, filing, or section, township and range. • Owner's name, mailing address, phone, fax or cell.,/ • Contractor's name, mailing address, phone, fax or cell. ,/ • Architect and/or Engineer's name, mailing address, phone, fax or cell. • Building size, height, number of stories, lot size. • Type of Construction (Commercial). ✓ • Class of Work (New, Remodel/ Alteration, Addition, Repair, Move/ Relocation)... • Detailed description of work. • Type of heating (natural gas, propane, electric, other)../ • Sewer system (Community or OWTS), also see other items below. • Garage (Attached or Detached). • Driveway permit (please see other items below). • Valuation (labor and materials), see attached worksheet. OTHER ITEMS: • WILDFIRE MITIGATION — All Garfield County property owners are recommended to employ wildfire mitigation strategies in the development and construction of all buildings throughout the County. Please refer to the following publication: "FireWise Construction: Site Design & Building Materials" which is available from the Colorado State Forest Service for specific wildfire mitigation strategies applicable to your project. • If you anticipate obtaining a water -tap from the City of Rifle, please provide a letter indicating that the City will provide water service. Required to submit building permit application. • OWTS requires a septic permit application to be submitted with the building permit application. • A separate electrical permit must be obtained from the State of Colorado Electrical Board. • At the time of building permit submittal, you are required to show proof of legal and adequate access to the site. This may include proof of right to use a private easement, County Road & Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The County Road & Bridge Department can be reached at 970-625-8601. • If you anticipate excavating or grading prior to issuance of a building permit, you will be required to obtain a separate grading permit. • If you belong to a Homeowners Association it is your responsibility to obtain written approval, if required. • Provide copies of any Resolutions and/or Land Use Permits associated with this property. • Projects with more than 10 occupants require plans sealed by a Colorado Licensed Design Professional. Occupant Toad shall be calculated by IBC Table 1004.1. • A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups. BUILDING PLANS: 2 sets of plans must be submitted. Plans must be 18"x24" minimum size, complete, identical, legible and to scale. Certain projects may also require a third copy of the plans be submitted to the local Fire District for review prior to permit issuance. All plans will be checked at the counter for completeness. If any of the required information is missing, the building permit application cannot be accepted. SITE PLAN: Please make sure the following information is provided on the site plan. • Property address/legal description. • North Arrow and Scale on each page. • Show all property lines, building envelopes, flood plain and easements. • Provide setback distances from boundaries, buildings, septic, well and waterways. • Location and direction of the county or private road and driveway accessing the property. • Proposed and existing structures. Include sheds, barns, decks, patios and any other buildings. • Existing and proposed grade, positive drainage around structure (to be contained on site). • Streams, rivers, creeks, springs, ponds and ditches. • Existing and proposed wells, septic tanks, leach fields, and other systems (if applicable). • Retaining walls (engineer stamped detail required for walls over 4 ft., measured from bottom of footing to top of wall). NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property line or not within an established building envelope shall be prepared, stamped and signed by a licensed surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision final plat with the proposed structure located in the building envelope. COVER SHEET: • Project identification. • Project address and/or legal description. • Design specifications to include building use and occupancy classification, type of construction, building height and area calculations, occupant load, and fire sprinkler systems. ARCHITECTURAL PLANS: Please provide the following information on the architectural plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Design Professional stamped plans. • Minimum of 4 elevations (N,S,E,W). • Floor plans for each level, including dimensions and scale noted. • Clearly label each room or space (office, storage, mechanical, elevator, etc). • Wall types; clearly labeled and referenced. Identify all fire resistive wall construction. • Construction details for all fire resistive elements referenced on floor plans and cross sections. Include wall, floor/ceiling, roof/ceiling, shaft wall assemblies and structural frame. Provide the fire resistive listing number referenced on each assembly detail. (ex. UL P123) • Window and door sizes, types and operation and direction of swing noted on the floor plan. • Specify roof slope/pitch, roof covering and siding materials. • Energy design specifications/details for R-values, U-factors and SHGC's per IECC. • Stair and guard details specifying rise, run, height and spacing. • Accessibility; show compliance with accessibility requirements for all elements of the building per IBC, Chapter 11 and ICC/ANSI A 117.1, ADA, FHA, and UFAS. STRUCTURAL PLANS: Please provide the following information on the structural plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Engineered foundation design per soils report. Geotechnical report referenced. Provide a copy of site -specific soils investigation report. • Design specifications to include roof and deck snow load, wind and seismic design and frost depth. • Foundation plan showing complete footing and foundation dimensions. • Footing and foundation details specifying reinforcement referenced on plans. • Framing plans for each floor level and roof. All beams, columns, joists, rafters, trusses and all live/dead loads specified. • Framing /connection details referenced on plans. • Pre -manufactured structures require an engineer's stamp, signature and date. MECHANICAL PLANS: Please provide the following information on the mechanical plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Energy design calculations and details verifying compliance with the 2009 IECC. • Floor plans for each level showing size, location and materials of all ductwork, plenums, return and outside air intake registers. • Size and location of all combustion air ductwork and openings. • Size, type and termination of all gas appliance flues and vents. • Location of all fire and combination smoke/fire dampers. • Equipment schedule for all mechanical equipment (boiler, furnace, exhaust fans, etc.). • Commercial kitchen hood location, hood and duct sizes, CFM calculations. PLUMBING PLANS: Please provide the following information on the plumbing plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Floor plans for each level showing DWV layout and sizing, materials, slope and sewer location. • Water piping materials, length and size of pipe, water meter location, fixture unit demands, location and type of backflow prevention devices. • Gas piping materials, length and size of pipe, gas meter location and BTU/hour demands. • Additional piping plans for roof/deck drains, condensate, medical gas, etc. • Plumbing fixture schedule for all plumbing equipment. • Commercial kitchen plumbing fixtures, food preparation equipment, grease interceptors, etc. ELECTRICAL PLANS: Please provide the following information on the electrical plans. • Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. • Floor plans for each level showing location of lighting fixtures, switches, receptacles, emergency exit signs and lighting and panel location. • Diagram showing service entrance, conduit/wire size, main disconnect size, grounding electrode/conductor size, feeder conduit/wire size, transformers and generators. • Panel schedule showing bus/breaker sizes, circuit description, voltage, phase, amperage, etc. NOTE: If any required information is missing, delays in issuing the permit are to be expected. If determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as well as any Road Impact fees will be collected when the permit is issued. The permit application must be signed by the owner or by a person having written authority from the owner to act as their representative. I hereby acknowledge I have read, understannn end will abide with the requirements of this checklist. Property Owner Print and Sign Date 014 c ci.P. v /7,it..