Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT B LCO-09-20-6489 and SEPT -09-20-6490 John Blatz Metal Fabrication & Assembly Building Big R Commercial Park, Lot 4 160 Gemat Court — Rifle, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2015 I.B.C., I.F.C., I.M.C., I.P.C., I.F.G.C. AND 2009 I.E.C.C., AS WELL AS MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE-MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES. 3) ALL WORK MUST COMPLY WITH GARFIELD COUNTY'S "COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS AND MUST COMPLY WITH ALL REQUIREMENTS AS STATED ON THE FINAL PLAT. 4) THIS BUILDING IS APPROVED AS NON-SPRINKLERED, TYPE V -B CONSTRUCTION, OCCUPANCY GROUP "F-2" (FACTORY LOW -HAZARD). 5) AS PER THE FINAL PLAT NOTES, BUILDING SHALL BE EQUIPPED WITH AN EARLY DETECTION FIRE ALARM SYSTEM INCLUDING BUT NOT LIMITED TO HEAT DETECTION, SMOKE DETECTION AND MANUAL ACTIVATION. APPLICANT SHALL CONTACT THE LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING: FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL LETTER FROM FIRE DISTRICT IS REQUIRED AS FOLLOWS: (1) AT FRAME INSPECTION, AND (2) PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 6) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION TO VERIFY 1,500 P.S.F. SOIL BEARING CAPACITY. 7) EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS AT DOORS AS PER SECTION 1010. VERIFY DIRECTIONAL EXIT SIGNS AND EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 8) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12. 9) RESTROOM FACILITIES ARE REQUIRED IN THIS NEW OFFICE BUILDING, INCLUDING A LAVATORY AND WATER CLOSET. ACCESSIBLE RESTROOM TO COMPLY WITH ACCESSIBILITY REQUIREMENTS PER I.B.C, CHAPTER 11 AND I.C.C. A117.1 - 2009 INCLUDING 36" WIDE DOOR & 60" DIAMETER TURN RADIUS INSIDE RESTROOM. 10) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., CHAPTER 11 AND I.C.C. A117.1 - 2009. PROVIDE ACCESSIBLE ROUTE FROM PARKING AREA TO ACCESSIBLE ENTRANCE INTO OFFICE, INCLUDING LANDINGS, RAMP, RAILINGS, ETC. 11) ON-SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) SHALL BE DESIGNED AND INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. SEPTIC DESIGN TO COMPLY WITH O.W.T.S. REGULATIONS AS ADMINISTERED BY GARFIELD COUNTY'S PUBLIC HEALTH DEPT. PROVIDE FINAL APPROVAL FROM PUBLIC HEALTH DEPT. PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 12) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION, AND FINAL ELECTRICAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.