HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-10-20-6548
Jennifer Vandeventer
In -Ground Outdoor Swimming Pool & Spa
15 Old Orchard Road, Carbondale
Hawk Ridge — Lot 15
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.),
2015 INTERNATIONAL SWIMMING POOL & SPA CODE, AND 2009 INTERNATIONAL
ENERGY CONSERVATION CODE (I.E.C.C.)
2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED
"GARFIELD COUNTY BUILDING REQUIREMENTS".
3) A COLORADO LICENSED GEOTECHNICAL ENGINEER SHALL PERFORM AN OPEN -HOLE
SOILS INSPECTION TO VERIFY THE ASSUMED MAXIMUM ALLOWABLE SOIL BEARING
PRESSURE = 1,500 P.S.F. AS STATED ON PLANS. PROVIDE COPY OF OPEN -HOLE SOILS
REPORT FOR INSPECTOR REVIEW AT INITIAL CONCRETE INSPECTION.
4) RESIDENTIAL IN -GROUND SWIMMING POOL TO COMPLY WITH 2015 INTERNATIONAL
SWIMMING POOL & SPA CODE - CHAPTERS 3 AND 8.
5) PERMANENT RESIDENTIAL SPA SHALL COMPLY WITH 2015 INTERNATIONAL SWIMMING
POOL & SPA CODE - CHAPTERS 5 AND 9.
6) OUTDOOR SWIMMING POOL & SPA SHALL BE PROVIDED WITH ENERGY CONSERVING
MEASURES IN ACCORDANCE WITH 2009 I.E.C.C. - SECTIONS 504.7.1 THROUGH 504.7.3.
HEATED OUTDOOR POOL & SPA SHALL BE EQUIPPED WITH A VAPOR RETARDANT POOL
COVER. IF HEATED TO MORE THAN 90 DEGREES, POOL & SPA COVER SHALL HAVE A
MINIMUM R-12 INSULATION VALUE.
7) OUTDOOR SWIMMING POOLS & SPAS SHALL BE SURROUNDED BY A BARRIER THAT
COMPLIES WITH 2015 INTERNATIONAL SWIMMING POOL & SPA CODE-SECTION5
305.2.1.THROUGH 305.7.
8) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.