Loading...
HomeMy WebLinkAbout1.03 County Floodplain Letter Follow-up 05.02.2019P.O. Box 1908 1011 Grand Avenue Glenwood Springs, CO 81602 Z4NC4NELL4 4ND 4SSOC14TE5, INC. ENGINEERING CON SULT1NTS May 2, 2019 Glenn Hartman Garfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Via email to: ghartmann@garfield-county.com (970) 945-5700 (970) 945-1253 Fax Re: Cattle Creek Commercial Center Building Permit Application and Related Floodplain Mr. Hartman: This letter is to respond to your email of April 30, 2019. As noted in our previous letter, in 1999 our Client filed for a special use permit to place fill on its property in the floodplain of Cattle Creek pursuant to GCLUC Section 4-109. The purpose of the fill was to provide a "platform" to enable the construction of buildings on the property such that normal building construction and drainage considerations would easily result in the finished floor elevation of any subsequently constructed building to be at least one foot above the appropriate floodplain elevation. By Resolution number 99-114, the Board of County Commissioners approved the special use permit, subject to certain conditions. A discussion of those conditions was included in our previous letter of January 15, 2019. This letter includes a discussion of the items included in GCLUC Section 4-109, as requested. The specific items from that section follow: [GCLUC Section 4-109] A. Review Criteria. A Floodplain Development Permit may be issued by the Director or designated Floodplain Administrator if it is found that the application is in conformance with section 3-301, Floodplain Overlay Regulations, and upon weighing the following relevant factors: 1. The danger to life and property due to flooding or erosion damage; The danger to life and property due to flooding or erosion damage has been mitigated by filling the area in question to an elevation above the regulated floodplain elevation. Since the area in question is filled to an elevation above the regulated floodplain, floodwaters should be constrained to travel within the floodway. That is the purpose of the regulated floodway, to maintain an unobstructed channel area sufficient to convey the regulated flood. 2. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; The purpose of elevating the area in question above the elevation of the regulated floodplain is to raise the improvements placed on the higher elevation above the influence of floodwaters. 3. The danger that materials may be swept onto other lands to the injury of others; Again, raising the developed area above the level of the regulated floodplain will prevent stored materials from being swept away during flood events. 4. The compatibility of the proposed use with existing and anticipated development; The currently proposed buildings are a continuation of the existing development and are thus compatible with the existing and anticipated development. 5. The safety of access to the property in times of flood for ordinary and emergency vehicles; The access to the property is not within the regulated floodplain so no change in access or safety of access is expected in times of flood. 6. The costs of providing governmental services during and after flood conditions, including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical, and water systems; All utilities except electricity are privately provided by the existing development. The electrical service is on poles overhead, so no disturbance would be expected to the electrical service provided by the local electrical utility. 7. The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters and the effects of wave action, if applicable, expected at the site; Again, since the area in question is elevated above the floodway area normally affected by floodwaters, the area is not expected to experience detrimental effects from floodwaters. 8. The necessity to the facility of a waterfront location, where applicable; Not applicable. 9. The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; and The area in question has already been raised above the elevation of the regulated floodplain, so no other alternative is available nor desirable. 10. The relationship of the proposed use to the Comprehensive Plan for that area. No change in use or zoning is contemplated. Sincerely, Zancanella & Associates, Inc. Tirt &cl Timothy P. Beck, P.E. TPB/soe Attachments CC: Eric Rudd