October 23, 2019
Bob Gibson
3092 Walnut Place
Grand Junction, Colorado 81504
bob (iib t.l i 1 d withrm. co ni
Subject:
Gentlemen:
kAuodryt
,0
989.201
Project No. 19-7-337.A
Observation of Excavation and Compaction Testing, Proposed Residence,
Lot FW -6, The Fairways, Aspen Glen, Golden Bear, Garfield County, Colorado
As requested, a representative of Kumar & Associates, Inc. observed the foundation excavation
at the subject site on October 14, 2019 and performed in-place density testing on structural fill
placed for foundation support. The findings of our observations and test results are presented in
this report. We previously provided updated findings of a subsoil study conducted on the site for
foundation design in a report dated June 18, 2019, Project No. 19-7-337.
The residence will be 1 and 2 -story construction supported on spread footings placed on 3 feet of
compacted structural fill sized for an allowable bearing pressure of 2,500 psf.
At the time of our initial visit to the site, the foundation excavation had been cut in one level
from 4 to 6 feet below the adjacent perimeter ground surface including 3 feet of sub -excavation
depth. The soils exposed in the bottom of the excavation had been moistened and compacted
and consisted of sandy silty clay. No free water was encountered in the excavation and the soils
were slightly moist to moist. Results of in-place moisture -density tests taken on the clay soils
placed as structural fill below footing areas, presented in the attached Earthwork Compaction
Testing Reports, indicate adequate compaction at near optimum moisture content.
The soil conditions exposed in the excavation are consistent with those previously encountered
on the site and suitable for support of spread footings placed on the compacted structural fill
designed for the allowable bearing pressure of 2,500 psf. Loose disturbed soils in the footing
areas should be moistened and compacted. The bearing soils should be protected from frost and
concrete should not be placed on frozen soils. Other recommendations presented in our previous
report which are applicable should also be observed.
Bob Gibson
October 23, 2019
Page 2
If you have any questions or need further assistance, please call our office.
Sincerely,
Kumar & Associates
Steven L. Pawl
SLP/kac
Attachments: Earthw action Testing Reports: October 15 & 16, 2019
cc: RM Construction — Jason Norris (Jason@buildwithrin.coin)
Kumar & Associates; Inc. ® Project No. 19-7-337.A
1
I + G o c n A> I1atona s En;i
�ealechnical and �1aerials Engineers
and Environm Intal Scisnlists
5020 County Road 154, Glenwood Springs, CO 81601
Phone: (970) 945-7988, Fax: (970) 945-8454
Email: ka9tenwood@kumarusa.com
Earthwork Compaction Testing Report
Client: Bob Gibson
3092 Walnut Place
Grand Junction, Colorado 81504
Project No.: 19-7-337.A Day:
Date:
Page:
Tuesday
10/15/19
1 of 1
Project: Proposed Residence, Lot FW -6, Aspen Glen, Golden Bear, Garfield County, Colorado
Weather: Clear, calm, dry
Temperature: 31° at 8:30 am
Earthwork Contractor:
JJJ Construction
Equipment Used:
Description of Earthwork
Tested:
Sample(s) Obtained:
Verbal Communication:
Trackhoe, vibratory double drum roller
The contractor has begun under footing backfill operations and both tests met
minimum project moisture -density requirement.
Izzy with JJJ Construction was informed of our field test results
Placement and Compaction Procedure: Reported by the Contractor.
Lift Thickness: 1' Max. Rock Size: 1"
Compactor(s) Used: vibratory double drum roller
Moisture hydrant at stockpile
Conditioning:
Number of Passes: as required
Nuclear Gauge Moisture/Density Test Results
Test
No.
Location
Depth or
Eley.
Field Dry
Densit
ensi y
(pcf)
Field
Moisture
Content
Field
Com
(%)p'
Min.
Comp.
Req.
(%)
Proctor
Lab No.
1
N.W. corner
2' below
footing
grade
105.2
14.2
98
98
Est.
2
N.E. corner
2' below
footing
g rade
106.7
14.8
99
98
Est.
Proctor Sample Reference:
Lab No.
Method
Description
Max. Dry
Dens. (pcf)
Opt.
Moist. (%)
Estimate
ASTM D 698
Lean Clay (Lot 51
107.5
15.5
THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT, WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED
COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS
THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938.
Distribution:
Bob Gibson i)ob',i btiik['. ::(3n1)
/Imo
Philip Orgill Steven L. Pawlak, P.E.
Field Technician Reviewed By
!
i
I(...1 % ,..„ rah n, ,„Mateia s E."
L�u1�.eitnirai slid Materials Engineers
nvironTienr.::i F. Clentists
5020 County Road 154, Glenwood Springs, CO 81601
Phone: (970) 945-7988, Fax: (970) 945-8454
Email: kaaIenwood@kumarusa.com
Earthwork Compaction Testing Report
Client: Bob Gibson
3092 Walnut Place
Grand Junction, Colorado 81504
Project No.: 19-7-337.A Day: Wednesday
Date: 10/16/19
Page: 1 of 1
Project: Proposed Residence, Lot FW -6, Aspen Glen, Golden Bear, Garfield County, Colorado
Weather: Cloudy, calm, dry
Temperature: 35° at 9:00 am
Earthwork Contractor: JJJ Construction
Equipment Used: Trackhoe, vibratory double drum roller
Description of Earthwork The contractor has completed under footing backfill operations and all tests
Tested: met minimum project moisture -density requirement.
Sample(s) Obtained:
Verbal Communication: ins/ with JJJ Construction was informed of our field test results
Placement and Compaction Procedure: Reported by the Contractor.
Lift Thickness: 1'
Compactor(s) Used:
Max. Rock Size: 1"
Moisture hydrant
Conditioning:
vibratory double drum roller Number of Passes:
Nuclear Gauge Moisture/Density Test Results
as required
Test
No.
Location
Depth or
Elev.
Field Dry
Density
(pcf)
Field
Moisture
Content
%
Field
Comp.
(%)
Min.
Comp.
Req.Lab
(o/ )
Proctor
No.
1
30' S. of N.E. corner
Footing
grade
108.3
14.8
100
98
Est.
2
Center pad footing
Footing
grade
107.2
14.3
100
98
Est.
3
S.E. corner
Footing
grade
108.5
15.2
100
98
Est.
Proctor Sam le Reference:
Lab No.
Method
Description
Max. Dry
Dens. (pcf)
Opt.
Moist. (%)
Estimate
ASTM D 698
Lean Clay (Lot 5)
107.5
15.5
THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT, WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED
COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS.
THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938.
Distribution:
Bob Gibson (bob(a bufidwithrm.corn)
/Imo
Philip Orgill Steven L. Pawlak, P.E.