HEPWORTH - PAWLAK GEOTECHNICAL
October 10, 2005
Glenwood Structural and Civil
Attn: Adolfo Gorra
2425 South Grand avenue
Glenwood Springs, Colorado 81601
Hepworth-Pawlak Geotechnical, Inc.
5020 County Road 154
Glenwood Springs, Colorado 81601
Phone: 970-945-7988
Fax: 970-945-8454
email: hpgeo@hpgeotech.com
Job No.105 802
Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot 37, Filing
5, Elk Springs, Garfield County, Colorado
Dear Mr. Gorra:
As requested, Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study for design
of foundations at the subject site. The study was conducted in accordance with our
agreement for geotechnical engineering services to Glenwood Structural and Civil dated
September 8, 2005. The data obtained and our recommendations based on the proposed
construction and subsurface conditions encountered are presented in this report.
Proposed Construction: The proposed residence will be one story wood frame
construction above a walkout basement and located on the site as shown on Figure 1
Ground floor will be slab -on -grade. Cut depths are expected to range between about 4 to
12 feet. Foundation loadings for this type of construction are assumed to be relatively
light and typical of the proposed type of construction.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to re-evaluate the recommendations presented in
this report.
Site Conditions: The site is located on the uphill side of Monarch Road. Vegetation
consists of a pinon and juniper forest with a ground cover of grass, weeds and cactus. The
ground surface slopes down the south at a grade of about 20 percent with 10 feet of
elevation difference across the building footprint. Numerous basalt cobbles and boulders
are visible on the ground surface.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating two exploratory pits at the approximate locations shown on Figure 1. The
logs of the pits are presented on Figure 2. The subsoils encountered, below about one
foot of topsoil, consist of basalt cobbles and sandy clay with gravel. About four feet or
mainly sandy clay was encountered in Pit 1 above the rockier soils. The soils are all
highly calcareous. Results of swell -consolidation testing performed on a relatively
undisturbed sample of the sandy clay, presented on Figure 3, indicate low compressibility
under existing low moisture conditions and light loading and moderate compression when
wetted and under additional loading. The sample showed a low collapse potential
Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989
-2-
(settlement under constant load) when wetted. No free water was observed in the pits at
the time of excavation and the soils were slightly moist.
Foundation Recommendations:
Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for an allowable soil bearing
pressure of 1,500 psf for support of the proposed residence. The soils tend to compress
after wetting and there could be some post -construction foundation settlement. Footings
should be a minimum width of 16 inches for continuous walls and 2 feet for columns.
Loose and disturbed soils encountered at the foundation bearing level within the
excavation should be removed and the footing bearing level extended down to the
undisturbed natural soils. The exposed soils should then be moistened and compacted.
Exterior footings should be provided with adequate cover above their bearing elevations
for frost protection. Placement of footings at least 36 inches below the exterior grade is
typically used in this area. Continuous foundation walls should be reinforced top and
bottom to span local anomalies such as by assuming an unsupported length of at least 12
feet. Foundation walls acting as retaining structures should be designed to resist a lateral
earth pressure based on an equivalent fluid unit weight of at least 50 pcf for the on -site
soil as backfill.. A sliding coefficient of 0.4 and a passive earth pressure of 350 pcf
equivalent fluid unit weight can be to resist lateral loading on the foundation.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support lightly
loaded slab -on -grade construction. To reduce the effects of some differential movement,
floor slabs should be separated from all bearing walls and columns with expansion joints
which allow unrestrained vertical movement. Floor slab control joints should be used to
reduce damage due to shrinkage cracking. The requirements for joint spacing and slab
reinforcement should be established by the designer based on experience and the intended
slab use. A minimum 4 inch layer of free -draining gravel should be placed beneath
basement level slabs to facilitate drainage. This material should consist of minus 2 inch
aggregate with less than 50% passing the No. 4 sieve and less than 2% passing the No.
200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor density at a moisture content near optimum. Required fill can
consist of the on -site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encountered during our exploration, it
has been our experience in the area that local perched groundwater can develop during
times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can
create a perched condition. We recommend below -grade construction, such as retaining
walls and basement areas, be protected from wetting and hydrostatic pressure buildup by
an undcrdrain system.
The drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free -draining granular material. The drain should
be placed at each level of excavation and at least 1 foot below lowest adjacent fmish
grade and sloped at a minimum -1 % to a suitable gravity outlet. Free -draining granular
material used in the undcrdrain system should contain less than 2% passing the No. 200
Job No.105 802
-3-
sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The
drain gravel backfill should be at least feet deep. An impervious membrane, such as a
20 mil PVC liner, should be placed below the drain gravel in a trough shape and attached
to the foundation wall with mastic to prevent wetting of the bearing soils.
Surface Drainage:
The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95% of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas. Free -draining wall backfill should be
capped with about 2 feet of the on -site, finer graded soils to reduce surface
water infiltration.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement and
walkway areas. A swale may be needed uphill to direct surface runoff
around the residence.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Landscaping which requires regular heavy irrigation should be located at
least 10 feet from the building.Consideration should be given to the use
of xeriscape to limit potential wetting of soils below the foundation caused
by irrigation.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either express or implied. The conclusions and recommendations submitted in
this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Figure 1 and to the depths shown on Figure 2, the proposed type of
construction, and our experience in the area. Our services do not include determining the
presence, prevention or possibility of mold or other biological contaminants (MOBC)
developing in the future. If the client is concerned about MOBC, then a professional in
this special field of practice should be consulted. Our findings include interpolation and
extrapolation of the subsurface conditions identified at the exploratory pits and variations
in the subsurface conditions may not become evident until excavation is performed. If
conditions encountered during construction appear different from those described in this
report, we should be notified at once so re-evaluation of the recommendations may be
made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
Job No.105 802
_4
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein. We recommend on -site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance, please let us know.
Respectfully Submitted,
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
Louis E. Eller
Reviewed by
Steven L. Pawlak, P.E.
LEE/ksw
attachments Figure 1 — Location of Exploratory Pits
Figure 2 — Logs of Exploratory Pits
Figure 3 — Swell -Consolidation Test Results
Job No.105 802
i
7040
7030
7020
7010
105 802
LOT 37
FILING 5
PIT \�
U.L.=34.0'
L.L.=23.5' PIT 2
BUILDING
SETBACK
LINES - -
MONARCH ROAD
Hepworth—PowIak Geotechnlcal
PROPOSED
RESIDENCE
APPROXIMATE SCALE
1" = 40'
1
7040
\
7030
7020
1
1
1
1
LOCATION OF EXPLORATORY PITS [ure 1
a)
m
u_
a
m
0
0
5
LOWER LEVEL=23.5'
10
LEGEND:
:+J
PIT 1
ELEV.= 7031'
WC=9.7
DD=74
-200=82
PIT 2
ELEV.= 7030'
LOWER LEVEL=23.5'
_
WC=12,8
-200=78
TOPSOIL; sandy clay and silt, organic, slightly moist, dark brown.
CLAY (CL); silty, sandy, occasional cobble, medium stiff to stiff, slightly moist, highly calcareous.
BASALT GRAVEL AND COBBLES (GC-CL); with silty clay, sandy, medium dense/stiff, slightly moist,
highly calcareous.
2" Diameter hand driven liner sample.
Disturbed bulk sample.
0
5
10
NOTES:
1. Exploratory pits were excavated on September 17, 2005 with a Cat 320BL trackhoe.
2. Locations of exploratory pits were measured approximately by pacing from features shown on the site plan
provided.
3. Elevations of exploratory pits were obtained by interpolation between contours shown on the site plan provided.
4. The exploratory pit locations and elevations should be considered accurate only to the degree implied by the method
used.
5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between
material types and transitions may be gradual.
6. No free water was encountered in the pits at the time of excavating. Fluctuation in water level may occur with time.
7. Laboratory Testing Results:
WC = Water Content (%)
DD = Dry Density (pcf)
-200 = Percent passing No. 200 sieve
LOGS OF EXPLORATORY PITS
Hecworth—Pawlak Geotechnlcal
Figure 2
Compression %
0
1
2
3
4
5
6
7
Moisture Content = 9.7 percent
Dry Density = 74 pcf
Sample of: Sandy Clay
From: Pit 1 at 3 Feet
1
i
Compression
upon
wetting
i
4
J.
0.1
1.0
APPLIED PRESSURE - ksf
10
100
105 802
H
Hepworth—Pawlak Geotechnfcal
SWELL -CONSOLIDATION TEST RESULTS
Figure 3