Loading...
HomeMy WebLinkAbout0.8.11 Phasing Plan4.08.05 (2) (i) PHASING (i) if more than one phase is proposed, a phasing plan shall be included in the application that delineates the proposed phasing of the development. (A. 97-109) Initiation Phase: Within one year of approval of the PUD amendment, a preliminary plan application for subdivision of the entire PUD shall be submitted to the County. The phasing as defined below is the currently anticipated sequence of development of the PUD. However, market conditions and construction implications may cause the Applicant to modify the sequence of the development of these phases. The configuration of the below described phases allows for utilities and roads in a manner such that if subsequent phases are not developed for some time, the completed areas of the development will function effectively. The applicant requests that with the approval of the Elk Meadows PUD, the sequence of phasing construction may be modified through the subdivision review process and not require an amendment of the originally approved PUD. See Section 4.08.05 (7) (b) of this Application for a Development Schedule for the below listed phases. Phase A Phase B Phase C Phase D Phase E Access road and services to Lots 1 through 25 in the East Meadow neighborhood and east side entry landscaping. Construction of the first phase of the sanitary sewer system connecting to the Four Mile interceptor sewer line, first phase of the domestic water system, and first phase of the raw water irrigation system. Construction of the public pedestrian trail from the north PUD boundary to the south PUD boundary and the gravel pedestrian trail extending east along Four Mile Creek looping around lots 22 & 23, following the main access road and tying back into the "Four Mile Valley Public Trail". If Phase A is built without Phase B, a temporary looped access road will need to be provided as shown on the "Construction Phasing Plan." Access road and services to Lots 26 through 72 in the East Meadow Neighborhood, the East Meadow open space park and trails, preservation of the Bershenyi barns, landscaping of the "barnyard" and development of the Four Mile Creek Park and related trails. West entry including landscaping, access road and services to Lots 1 through 18 of the South Meadow neighborhood. The public pedestrian trail from Four Mile Road to the west end of Phase C and the trail between lots 5 & 6 This phase may also include gross earthwork on the access road to the Upper Meadow neighborhood. Access road and services to Lots 19 through 62 of the South Meadow neighborhood and the open space park in this neighborhood. Phase D assumes Phase C access is complete, but a looped access road following the emergency access and main road through Phase F will need to be provided as shown on the "Construction Phasing Plan." Access road and services to Lots 1 through 23 and Lots 37 through 41 in the Upper Meadow neighborhood including the emergency access drive/pedestrian trail connecting the main entry road to Upper Meadows loop road. A looped access road following the emergency access and main road through Phase G will need to be provided as shown on the "Construction Phasing Plan." 43 Phase F Access and services to Lots 24 through 36 and Lots 42 through 55, public parking facility and the observation deck and shelter. The public pedestrian trail from Phase E to the west edge of the PUD. PHASING PLAN 44 PHASE F11 'PHASE LI PHASE C PHASE PROVIDE TEMPORARY LOOPED ACCESS FOR PHASE D. (SEE NOTE 2) IF PHASE A IS CONSTRUCTED WITHOUT PHASE S PROVIDE TEMPORARY LOOPED ACCESS FOR PHASE A. (BEE NOTE 2) PROVIDE TEMPORARY LOOPED ACCESS FOR PHASE E. (SEE NOTE 2) LEGEND NO7ES: PHASE A - 26 IDIS PHASE S - 48 LOTS PHASE C - TB LOTS PHASE 0 - 44 LOTS PHASE E - 20 LOTS PHASE F - 27 LOTS 1) R£Af1GWE a or MR WEE FOAL AHO INE far 1,0 pfpESFRIAN PATH ALONG FOUR MILE 0010 Wisr 8E OOMPJE7ED 0L28 77 AR'ST PWA$ 0V OON90NIC7NYQ. 2) ANY PHASE OF CtMSCRIL'BOV OR 00 001EVCNTS RAT REOWRE LOPPED. ACCESS TO BE 2000200 MUST BE AGE0ITA TE FOR EMB10ENCY VE ACLEB AHO PROPERLY AMW OAM'EO. GRAPHIC SCALE 128 ( 04 8080 ) 1 inch - 200 R. OPRI9 E Nomsza I , T.ID 002 WAN' SOW. SUITE AS CANBONDOLE•. CO B1623 704-0011 NO DATE REVISION BY GARFIELD COUNTY RESERVE AT ELK MEADOWS CONSTRUCTION PHASING PLAN DES. YTN CK YTN DR, CJD DATE Bp/be FILE NO. 860/9.01 SHEET OF