Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-11-20-6587 Mathew & Susan Jurmu New Single -Family Residence Springridge Reserve — Phase 3, Lot 38 TBD Hidden Valley Drive Glenwood Springs, Colorado 1) WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.), 2015 INTERNATIONAL FIRE CODE (I.F.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES REDLINED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 2,000 P.S.F. 4) INSTALLATION OF A RESIDENTIAL FIRE -SPRINKLER SYSTEM IS REQUIRED, AND SYSTEM SHALL BE DESIGNED IN COMPLIANCE WITH N.F.P.A. 13R OR 13D. VERIFY ALL FIRE SPRINKLER SYSTEM REQUIREMENTS AND COORDINATE INSPECTIONS WITH LOCAL FIRE DISTRICT. PROVIDE EVIDENCE OF FIRE DISTRICT'S ROUGH -IN APPROVAL PRIOR TO FRAME INSPECTION AND FINAL APPROVAL PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 5) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.