HomeMy WebLinkAboutCorrespondenceAndy Schwaller
From: Brett Leable <brett@hammerheadops.com>
Sent: Thursday, July 9, 2020 4:10 PM
To: Andy Schwaller
Cc: Dave Argo; Lindsay Krol
Subject: Re: [External] Pool Application
Thanks Andy.
I submitted everything Brooke told me I needed when I called to ask What I needed to submit.
I'll get everything together tomorrow and reply.
Best Regards,
Brett Leable
Hammerhead Operations
Brett@Hammerheadops.com
970-401-3743
www.Hammerheadops.com
On Jul 9, 2020, at 4:08 PM, Andy Schwaller <aschwaller@garfield-county.com> wrote:
Brett,
Not enough information to process your permit. You need at a minimum the following information:
1. Soil report with recommendations related to a pool.
2. What is the surface construction? Poured concrete, gunite or something else? Provide details.
3. Is it being built by a certified pool professional or you?
4. Is it heated?
5. Barriers or safety covers?
6. Equipment room?
7. Frost protection equipment and piping?
8. General description of equipment and suction trap avoidance?
9. Actual construction drawings to scale with details.
10. Other items that might apply.
We will hold until better information is submitted.
Thanks, Andy
12/1/2020
• Outlook
New message
Mail - Lindsay Krol - Outlook
p Search
•
Delete ff Archive Junk \/ Sweep Move to \/ Cate
\/ Favorites
• Inbox
Sent Items
/f Drafts
�
Deleted |\e' 3639
Add favorite
\/ Folders
> |nbox
e Drafts
• Sent Items
>
Deleted }t*`' 3639
& Junk Email
ff. Archive
• Notes
[onve.sadonHist.
Driveway Exemoti'
Infected Items
>
Land &Resoura.
News Feed
NCV',
[External] 2936 county road 115
POOL.pdf
| ~~ |
BL
Brett Leable /bnett@hammerhea
��
dops.com> ' -- - '
Fri 11/20/2020 12:22 PM
To: AnUyS'hwaUrr: Dave mgo;Lindsay Krol
2936 county road 115 PDOL-
384na
Andy,
| believe We've checked all the boxes of the permit application with
this final Architect's drawing, and specification list.
Please see attached Pool Building Plari below,
1. Soil report with recomrnendations related to a
pool, In Separate Email
2.
3, What is the surface construction? 12" thick
shutrate over 144 rehar on a 12"x12" grid
'1. Is it being bullt hy a certified pool professional
or you? Poseidon Pools out ot Vail, Colorado
5. Is it Fieateri? Yes, sce equipment description
6. Barriers or safety covers? Autornatic closing
hard safety cover,
6. Equipment room? Yes, a 7'x4' cxterior shed with exterior
insulated door, haseboard electric heat, 0'21 insulated walis, and r-
49 ceiling and continuous vapor barrier. Louvers in door for
-49c"|ingondcontinuousvoporbarhor.Louveoindourfor
combustion air, water heater vented to outside.
7.
8. Frost protcction equipment and piping? All
piping will be run below frost level and
insu!ated with spray foam, approx 48" deep.
9,
10 Geneo|dcu/ipbun of equipment and suction
trap avoidance?
mo1| ' 1/1