Loading...
HomeMy WebLinkAboutMiscellaneous Engineer's Reports & Correspondence6/25/2020 Sweeney Development Mail - Buffalo Valley Apartment: notch in hold-down column repair S WE EN F. Y 1) EV EL()P1.11 ENT Frank Howard <frank@sweeneyaspen.com> Buffalo Valley Apartment: notch in hold-down column repair 1 message Heidi Hendricks <heidi@evolvestruct.com> To: Frank Howard <frank@sweeneyaspen.com> Cc: Kurt Backofen <kurt@sweeneyaspen.com>, Steve Edmiston <steve@evolvestruct.com> Frank, Thu, Jun 18, 2020 at 11:34 AM For the hold-down column located in Building 1 of the Buffalo Valley Apartment buildings near the intersection of Gridlines I & W2 please provide the following: • Near the top of the (2) 2x6 column where a 2 %" deep notch is located provide a CS20 tension strap with a minimum 5" lap to either side of the notch. • Near the bottom of the (2) 2x6 column verify that the 2 1/2" deep notch is located at the midpoint of the nailing pattern of the MSTCM60 strap. If otherwise, proved a CS20 strap as specified above. Please let me know if you have any questions. Thank you, -Heidi Heidi Hendricks, E.I. EVOLVE STRUCTURAL DESIGN 1040 Main Street Carbondale, CO 81623 (970) 510-0773 Office (970) 903-9126 Direct/Cell https://mail.google.com/mail/u/1 ?ik=b777241803&view=pt&search=all&permthid=thread-f%3A1669859007650242555&simpl=msg-f%3A 16698590076... 1/1 7/1S Sweeney Development Mail - Buff V. Inspection Notes SWEENFY !) EV ELOPM h:N'I' Buff V. Inspection Notes Kurt Backofen <kurt@sweeneyaspen.com> Steve Edmiston <steve@evolvestruct.com> Thu, Jul 18, 2019 at 9:51 AM To: Kurt Backofen <kurt@sweeneyaspen.com> Hi Kurt, As a follow up, this email confirms the structural guidance provided in response to RFI 009. Please refer to detail 10/S2.0 for footing step information. Building 2 footing steps along the south wall shall be poured monolithically with z-bar dowels through the step. Let me know if you think you need more info. Regards, Steven R. Edmiston, P.E., S.E. [VOLVE STRUCTURAL DESIGN 1040 Main Street Carbondale, CO 81623 (206) 910-7766 Direct/Cell [Quoted text hidden] 04,4 SWEENEY REAL. ESTATE Sweeney Real Estate & Development 41 Danielson Dr. Aspen, Colorado 81611 Phone: (970) 618-6325 RFI #9 Project: Buffalo Valley 3637 CO-82 Glenwood Springs, Colorado 81601 Footer Steps/ Rebar Detail TO: Steven Edmiston (Evolve Structural Design) Jim Bumer (Burner Construction) FROM: Kurt Backofen (Sweeney Real Estate & Development) DATE INITIATED: 07/16/2019 STATUS: Open LOCATION: DUE DATE: 07/17/2019 COST CODE: 030-08 - Concrete Footers PROJECT STAGE: SUB JOB: COST IMPACT: DRAWING NUMBER: LINKED DRAWINGS: RECEIVED FROM: Yes (Unknown) COPIES TO: Steven Edmiston (Evolve Structural Design) SCHEDULE IMPACT: SPEC SECTION: REFERENCE: Question from Kurt Backofen (Sweeney Real Estate & Development) at 08:28 AM on 07/16/2019 Need a detail approving added steps on footers on Building 2 in locations that were shown on site meeting. Also added rebar detail was discussed on the thickened footer sections as well as connecting the added steps. Official Response: Steven Edmiston (Evolve Structural Design) responded on Tuesday, July 16th, 2019 at 8:38AM MDT For the east end and around the south east corner of Building 2 foundation several areas of foundation bearing were required to be excavated deeper per geotechnical requirements. It is acceptable to pour the footings thicker in these areas with top and bottom reinforcement. The additional top reinforcement shall match the bottom reinforcement. The areas with top and bottom reinforcement shall use z-bars to bring the top and bottom mats back to a single bottom mat of reinforcement as it transitions back to footings as originally specified. Attachments: BY DATE COPIES TO Sweeney Real Estate & Development Page 1 of 1 Printed On: 07/19/2019 12:47 PM 7/22/2019 Sweeney Development Mail - Buffalo Valley - Thickened footings S W EENEY DEVELOPMENT Buffalo Valley - Thickened footings 1 message Kurt Backofen <kurt@sweeneyaspen.com> Steve Edmiston <steve@evolvestruct.com> Mon, Jul 22, 2019 at 1:13 PM To: Kurt Backofen <kurt@sweeneyaspen.com> Kurt, As discussed, in the areas where the typical FC18 footing needed to be thickened due to field conditions, it is acceptable to provide top and bottom reinforcing in lieu of the bottom reinforcing specified, with the top reinforcing equal to the bottom reinforcing. Also noted today, the revised retaining wall footing FC84 in the north-west corner of the building is acceptable to be constructed as an FC108. Regards, Steven R. Edmiston, P.E., S.E. Senior Engineer ONE EV6 DESIGN 1040 Main Street Carbondale, CO 81623 (206) 910-7766 Direct/Cell From: Heidi Hendricks heidi@evolvestruct.com B Subject: RE: Buff Val. Bld 1 Footer FC 4.5 Detail? Date: July 30, 2019 at 9:22 AM To: Kurt Backofen kurt@sweeneyaspen.com, Steve Edmiston steve@evolvestruct.com Kurt, Per our phone conversation earlier: For all footings called out as FC4.5 on Buildings 1 & 2 of the Buffalo Valley Apartments please reinforce per FC5.O on the footing schedule. We will update our drawings accordingly. Thank you, -Heidi EVOLVE STRUCTURAL OESIGN 1040 Main Street Carbondale, CO 81623 (970) 510-0773 Office (970) 903-9126 Direct/Cell From: Kurt Backofen <kurt@sweeneyaspen.com> Sent: Monday, July 29, 2019 9:48 AM To: Heidi Hendricks `heidi@evolvestruct.com>; Steve Edmiston <steve @ evolvestruct.com> Subject: Buff Val. Bld 1 Footer FC 4.5 Detail? Heidi- Sorry to pile on questions.. However we don't have Footer FC 4.5 on rebar schedule for Bld 1? Not sure if something changed? Inspector will need to know. Let me know if I'm missing something. Thanks -Kurt Kart Baer . n I'rrject li [anctger Sweeney Real Estate & Development since 1993 cell: 970-309-3395 email: t WL""Cll awen.coln .wi w.sweeneyaspealain From: Heidi Hendricks heidi@evolvestruct com 6' Subject: Buffalo Valley Apartments: Retaining Wall Ftg Repair - Bldg 2 Date: August 12, 2019 at 2:54 PM To: Kurt Backofen kurt@sweeneyaspen com Cc: Steve Edmiston steve@evolvestruct com This email is in response to a request for repair of a footing located in Building 2 of the Buffalo Valley Apartments. Please do the following: • The inside corner of the retaining wall footing located along Gridline W8 and at the intersection of Gridline E shall be extended to the East so that a minimum of 1'-0" of footing extends beyond the East face of the retaining wall located along Gridline E (approximately 3'-0" of total extension). • The width of the new footing extension shall match the existing footing width for the entire length of the extension (2'-6" from face of retaining wall). • The reinforcing in the new footing extension shall be as follows: o #5 @ 10"o.c. TRANSV TOP & BOT o #5 @ 1 0"o.c. LONGIT TOP & BOT • All reinforcing shall be drilled and epoxied a minimum of 8" inches into the existing footing on both sides, top & bottom. Kurt, I hope to get well into the shop drawings this week and was wondering if you had a preference of what you were hoping to see first? I know Building 2 is the priority. Are you thinking you want the wall shops out first, then floor & roof trusses? Just want to make sure I'm on the same page as you. Thanks! -Heidi Heidi Hendricks, E.I. EVOLVE STRUCTURAL DESIGN 1040 Main Street Carbondale, CO 81623 (970) 510-0773 Office (970) 903-9126 Direct/Cell From: Steve Edmiston steve@evolvestruct.com 6' Subject: Buffalo Valley - Side Basement Walls per detail 5/S2.0 Date: August 22, 2019 at 4:28 PM To: Kurt Backofen kurt@sweeneyaspen.com Kurt, • As discussed, the current rebar mats tied in the side basement wall did not meet the reinforcing specs shown in detail 5/S2.0. The required retrofit is: • Install additional #4 horizontal bars in between every other existing horizontal to provide an overall equivalent #4 @ 12"o.c. horizontal layout. • Tie additional #5 vertical bars inside of the existing mat. Additional #5 shall be spaced at 16"o.c. Let me know if you need more info on this. Thanks, Steven R. Edmiston, P.E., S.E Senior Engineer EVOLVE STRLIL;TURII DESIGN 1040 Main Street Carbondale, CO 81623 (206) 910-7766 Direct/Cell