HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-11-20-6605
Turtlepoop, LLC
Manufactured Steel Building for Residential Garage/Storage Use
TBD County Road 24 — New Castle, Colorado
1) ALL WORK SHALL COMPLY WITH 2015 I.B.C., I.R.C., I.F.C., AND 2009 I.E.C.C., AS WELL AS
MANUFACTURER'S INSTALLATION REQUIREMENTS. STRUCTURE SHALL ALSO COMPLY WITH ALL
REQUIREMENTS OF GARFIELD COUNTY'S "RURAL" ZONE DISTRICT.
2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED
"GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS
REFER TO SPECIFIC ITEMS ON THIS LIST.
3) THIS BUILDING IS APPROVED AS A RESIDENTIAL ACCESSORY STRUCTURE FOR PRIVATE USE
ONLY, AND IT IS CLASSIFIED UNDER THE I.B.C. AS CONSTRUCTION TYPE V-B (NON -RATED) AND
OCCUPANCY/USE "U" (UTILITY). ANY SUBSEQUENT CHANGE IN USE OR OCCUPANCY- FOR
EXAMPLE, COMMERCIAL USE OR OTHER TENANT IMPROVEMENTS- MAY REQUIRE A LAND USE
CHANGE PERMIT AND/OR BUILDING PERMIT(S).
4) THIS BUILDING PERMIT IS ISSUED FOR AN UNHEATED BUILDING SHELL AND PLUMBING WORK IS
SPECIFICALLY LIMITED TO UNDER -SLAB ROUGH -IN. ANY ADDITIONAL PLUMBING OR INTERIOR
PARTITION WALLS WILL REQUIRE AMENDED PLANS TO BE SUBMITTED TO THE BUILDING DEPT.
FOR REVIEW & APPROVAL.
5) IF BUILDING IS HEATED - EITHER AT PRESENT OR IN THE FUTURE - REFER TO ATTACHED ITEMS
#59, 62, 63, 64, 65 & 71. STEEL BUILDING SHALL COMPLY WITH 2009 I.E.C.C., TABLE 402.2.5 FOR
INSULATION AT THERMAL ENVELOPE - INCLUDING RIGID INSULATION AT CONCRETE SLAB EDGE
AND FOUNDATION PERIMETER PER I.E.C.C., SECTION 402.2.8.
6) AN OPEN -HOLE SOILS REPORT PREPARED BY A COLORADO LICENSED PROFESSIONAL ENGINEER
IS REQUIRED AT FOOTING INSPECTION TO VERIFY 3,000 P.S.F. SOILS BEARING CAPACITY.
PROVIDE COPY OF REPORT FOR BUILDING INSPECTOR REVIEW AT FOUNDATION INSPECTION.
7) ALL HIGH -STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR PER SPECIAL
INSPECTIONS PROVISIONS OF I.B.C., CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME
INSPECTION.
8) A MINIMUM OF ONE WALK-THROUGH SIDE -HINGED DOOR (MIN. SIZE: 36" WIDE x 80" HEIGHT)
IS REQUIRED FOR EGRESS.
9) REQUIRED GARFIELD COUNTY INSPECTIONS INCLUDE: FOOTINGS, FOUNDATION, UNDER -SLAB
PLUMBING ROUGH -IN, STEEL FRAME, AND FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
10) ELECTRICAL PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL
ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL SIGN -OFF IS
REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.