HomeMy WebLinkAboutDOLA Inspection ReportCOLORADO
j Department of Local Affairs
I :.,
AC (alternative construction) INSPECTION REQUIRED NOTICE
The following is based on information provided to the Codes Section and may he modified based on the actual
findings of the field inspection.
DATE: March 20, 2019
MANUFACTURER: Fleetwood Homes of Idaho ID NO.: 3473
CONTACT: Mr. Dean Marshall (dean.marshall@fleetwoodhomes.com) FAX NO.:
MODEL NO.: 800186-23WC30764W-CO (Glenwood Springs) P/A NO.: 515244AC REV
INSPECTION REQUIREMENTS:
Please check the following on-site work:
1) Continuity of IRC duplex dwelling unit separation construction.
2) Roofing underlayment, flashing, and metal panel roof covering.
Site Address:"j"g.
The load bulidi departmentbysisformfakesresponsibllityforinspectngthesitebuiltconsbvction
stated above to approved plansand current codes
Nor malpermitsand fees for these inspections are to be per the local jurisdiction.
State approved plans for Factory Built Construction be obtained from the Builder/Manufacturer
Building Official Printed N
„ r■ 4U_-J�
Building Official Signa • . �1Date //' - /S)2.—]
Local jurisdiction may check 60 v defer inspection to the Division of Housing, f l Initials
or DOH approved Inspector. l I
A copy of this Notice must be included with the installation instructions and shipped with the unit.
Please direct questions to DOH Engineer, @ 303-864-7835
FOWL ROUSING
OPPORTUNITY
Governor Jared Polis 1 Rick M. Garcia, Executive Director 1 Alison George, Division Director
1313 Sherman 5t., Room 500, Denver, CO 80203 P 303.864.7813 F 303.864.7856 TDD/TTY 303.864.7758 www.dola.colorado.gov
Strengthening Colorado Communities