HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-11-19-6068 and SEPT-11-19-6069
Oldcastle SW Group, Inc.
Cement Batch Plant & Office
25828 Highway 6 & 24 — Rifle, Colorado
1) ALL WORK SHALL COMPLY WITH THE 2015 I.B.C., I.F.C., I.M.C., I.P.C., I.F.G.C. AND 2009 I.E.C.C.,
AS WELL AS MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S COMMERCIAL BUILDING REQUIRE-
MENTS, DESCRIPTION OF PLAN REVIEW REDLINE COMMENTS & INSPECTIONS POLICIES.
3) ALL WORK MUST COMPLY WITH GARFIELD COUNTY'S "RURAL" ZONE DISTRICT REGULATIONS
AND CONDITIONS OF THE SPECIAL USE PERMIT (B.O.C.C. RESOLUTION # 89-030). ALSO COMPLY
WITH FLOODPLAIN TECHNICAL MEMORANDUM AS PREPARED BY RIVER CITY CONSULTANTS
DATED JUNE 27, 2019.
4) STRUCTURE IS APPROVED AS NON-SPRINKLERED, TYPE V-B CONSTRUCTION WITH OCCUPANCY
GROUPS "B" (BUSINESS/OFFICE) AND "F-2" (BUILDING MATERIALS & PROCESSING).
5) OPEN -HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION, 2000 P.S.F
6) ON -SITE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) PERMIT APPLICATION, PLAN REVIEW,
INSPECTIONS AND FINAL APPROVALS ARE NOW ADMINISTERED BY GARFIELD COUNTY'S PUBLIC
HEALTH DEPT. PROVIDE COPY OF FINAL O.W.T.S. APPROVALS/SIGN-OFF FROM PUBLIC HEALTH
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
7) APPLICANT SHALL CONTACT LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING
FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL LETTER OF
APPROVAL FROM FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION &
CERTIFICATE OF OCCUPANCY.
8) EGRESS REQUIREMENTS PER 2015 I.B.C., CHAPTER 10. LOCKS, LATCHES & LANDINGS AT DOORS
PER SECTION 1010. VERIFY DIRECTIONAL EXIT SIGNS AND EMERGENCY LIGHTING LOCATIONS
PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.
9) ACCESSIBILTY REQUIREMENTS PER 2015 I.B.C., CHAPTER 11 AND I.C.C. A117.1 - 2009. PROVIDE
ACCESSIBLE ROUTE FROM PARKING AREA TO ACCESSIBLE ENTRANCE INTO OFFICES, INCLUDING
LANDINGS, RAMP, RAILINGS, ETC.
10) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12.
11) RESTROOM FACILITIES SHALL COMPLY WITH ACCESSIBILITY REQUIREMENTS AS PER I.B.C,
CHAPTER 11 AND I.C.C. A117.1-2009.
12) PLUMBING SHALL COMPLY WITH I.P.G. & I.F.G.C. REQUIREMENTS, AND PLUMBING ROUGH -IN
INSPECTION IS REQUIRED PRIOR TO FRAME INSPECTION.
13) MECHANICAL/HEATING SYSTEMS TO COMPLY WITH I.M.C. AND I.E.C.C. - SECTION 503.
MECHANICAL ROUGH -IN INSPECTION IS REQUIRED PRIOR TO FRAME INSPECTION.
14) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS BY COLORADO STATE ELECTRICAL
BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION, AND FINAL
ELECTRICAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE
OF OCCUPANCY.