Loading...
HomeMy WebLinkAboutPot Hole Observation 05.21.2020Huddleston-Berry Engineering & 1'esring, L1,C REVIEW Project No.: 00256 - 0079 Observed By: CDR Date: 5/21/20 Project Name: Rifle Plant Work Order No: 66613 Client Name: United - Oldcastle Authorized By: Client Date: 5/21/20 Installation Contractor: United Co. Contractor Representative: Robbie Lewis Reviewed By: JAL Date: 5/22/20 Physical Address: Installation Equipment: Datum: A representative of Huddleston Berry Engineering and Testing (HBET) arrived on site as requested to perform pot hole observation under the direction of Mike Berry PE of HBET. Upon arrival roughly 11- 11:30 am we were informed that the mini excavator would not be on site until 1PM. When the excavator arrived we pot holed the south-east and north-west corners of the building as there were concrete forms in place for the foundation to be poured the following day. Care was taken by the operator of the excavator not to disturb the soils under the building footprint. Each of the areas noted were excavated to a depth of 3' feet below the foundation. Large size pit run material (cobbles being 12" or larger) was observed the full depth. A leveling course of 1/4" minus material was observed over the pit run. Mike Berry PE was notified of our findings. General Remarks: Record No. 1 RW