Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-01-21-6647 and SEPT-01-21-6648 Mario Tarin New Manufactured Home 405 County Road 104 — Carbondale, Colorado Jean & Dee Blue Amended Exception, Tract 2 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. 2) FOUNDATION, CRAWL SPACE & SITE WORK SHALL COMPLY WITH 2015 I.R.C., 2009 I.E.C.C. AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 4) MANUFACTURED RESIDENCE IS APPROVED AS REPLACEMENT OF AN EXISTING RESIDENCE ON THIS PROPERTY. 5) LOCATION/PLACEMENT OF NEW MANUFACTURED RESIDENCE SHALL NOT ENCROACH INTO THE 25-FOOT FRONT YARD SETBACK. A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY THAT STRUCTURE IS IN COMPLIANCE WITH BUILDING SETBACK REQUIREMENTS. 6) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 7) PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL/SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON -SITE WASTEWATER TREATMENT SYSTEM. 8) ELECTRICAL PERMITTING AND INSPECTIONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 9) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B. FOUNDATION C. SEPTIC SYSTEM D. PLUMBING/GAS E. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* * NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.