Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-01-21-6652 Terry Thompson New Single -Family Residence 50 Larkspur Drive — Carbondale, Colorado Cerise Ranch — Phase 2, Lot 29 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 2,000 P.S.F. 4) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REQUIREMENTS. 5) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS -BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 6) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.