Loading...
HomeMy WebLinkAboutOWTS Installation Observations 02.22.2021558 RIO OSO LANE GRAND JUNCTION, CO 81507, CONSULTING ENGINEER 970 216 8861 February 22,2021 ìÈôä,ttð eræ,eg¿rGARFIELD COUNTY COMMUNITY DEVELOPMENT 108.8 TH STREET, SUITE 401 GLENWOOD SPRINGS, CO 81601 Re: Certification Letter & "As-Builf' On-Site Wastewater Treatment System TBD CR 237. TRACT 28 Silt,. Colorado Garfield County To Whom lt May Concern: This is to advise that I have made a final inspection of the above referenced OWTS and that the system has been constructed essentially in accordance with the approved Plans and SpeCifications. lnstead of the infiltration trenches being constructed level, the installer put a slight downward slope to the east. This will not adversely affect the operation of the sytem and should be alright. Measurements from the house to the septic tank and distribution box, are shown on the attached "Construction Plan of Record". Additionally. risers on the septic tank and the east end of the absorption trenches further mark their location . Sincerely, KENNETH J.å¡ ¿qi CONSULTING ENGIN ìrìiìtii,i:iiREPLACEMENTAREAI,-''.''.1iØúIzti r¿Qêf¡¡ ¿àÅzv:-!3zo¡¡ì Ê0><00DIVIDERCONCRETE--- -l-CLEANOUTIIjLiNORTHSCALE: ln =20,illl1250 GALLONSEPTTCTANKPLASTIC,2 RISERSABOVEGRADE.:."-,--*.lIALL PROPERTY LINES AREMORE TIIÄN IOl)'FROMo\ilTsIjIIICONSTRUCTION PLANOT RECORI)ON.SITE \ryASTE\ilATER TREATMENTSYSTEM (OWTS)TBD CR 237, TRACT 28srLT, co.GARF'IELD COUNTYINSTALLEDBY:.ilOWNERI -' 1_