HomeMy WebLinkAboutFoundation Certification and Acceptance Report 03.04.2021C
CC/ ENGINEERING 1129-24-Road
Cronk Construction Inc. Grand Junction, CO 81505
Grand Junction (970) 245-0577 • Glenwood SpringslAspen (970) 640-5029 • Montrose/Delta (970) 640-5029
Email: cciej@msn.com
March 4, 2021
CERTIFICATE OF INSPECTION AND ACCEPTANCE
Regarding: Engineered Foundation
For: Nelson's Auto Body
6776 Hwy 82
Carbondale, CO
Contractor: TP1Industrial Inc.
2471 Riverside Parkway, Unit A
Grand Junction, CO 81505
970-243-4642
The foundation of reference was inspected and was found to conform with the plans and
specification set forth in the engineered foundation plan for the aforementioned property prepared
on 10/10/20. Copies of the engineered plan may be obtained from the undersigned design
engineer.
INSPECTION LOG
Item Date
Footings/u fer 12/ 10/21
Walls 12/15/21
Floor 02/25/21
Seal
Thomas A. Cronk. P.E.
1129 -24- Road
Grand Junction, CO 81505
970-245-0577