Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-03 -21-6723 Marcelino Holguin New Single-Family Dwelling w/ attached garage TBD CR 218, SiIt Heavenly View Subdivision, Lot 3 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE (t.R.c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C,) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PI-ANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING INSPECTION TO VERIFY I,5OO P.S.F.sOIt BEARING CAPAC¡TY. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. 4) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTI FICATE OF OCCUPANCY. 5) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO, PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & cERTtFTCATE OF OCCUPANCY (FILE # SEPT-3-21-6724). ó) LOCATTON OF SEpTtC TANK AND LEACH FIELD NOT SHOWN ON THE VICINITY MAp (OR S|TE PLAN STAPLED TO OFFTCE COPY). OWNER BUILDER TO ENSURE NO CONSTRUCTION PARKING / STAGING OF CONSTRUCTION MATERIALS OCCURS OVER THE TANK / LEACH FIELD. 7) ON MARCH 23,2021 THE PLANS EXAMINER SENT OWNER EMAIL CORRESPONDENCE DIRECTING THEM TO CONTACT ROAD & BRIDGE DEPARTMENT, PHONE (970) 625-8601TO OBTAIN A DRIVEWAY PERMIT OR OTHERWISE OBTAIN APPROVAL TO SECURE ACCESS TO THE SITE.