Loading...
HomeMy WebLinkAboutConditions of Permittrr'le *pr/ co NDITIONS OF PERMIT BLRE-03 -21-67 66 Trevor Ruonava ara / Alex Janckila New Single-Fami ly Residence 125 High Point Dr Springridge Reserve, Lot 1ó, Phase 1 1) ALL WORK SHALL COMpLy W|TH THE 2015 INTERNATIONAL RESIDENTIAL coDE (t.R.c.)AND 2O0e TNTERNATTONAL ENERGY CONSERVATION CODE (r.E.c.c.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) OPEN-HOLE SOTLS REPORT REOUIRED AT FOOTING INSPECTION TO VERIFY 1,5OO P.S.F. SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. 4) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.