HomeMy WebLinkAboutConditions of Permittrr'le *pr/
co NDITIONS OF PERMIT
BLRE-03 -21-67 66
Trevor Ruonava ara / Alex Janckila
New Single-Fami ly Residence
125 High Point Dr
Springridge Reserve, Lot 1ó, Phase 1
1) ALL WORK SHALL COMpLy W|TH THE 2015 INTERNATIONAL RESIDENTIAL
coDE (t.R.c.)AND 2O0e TNTERNATTONAL ENERGY CONSERVATION CODE
(r.E.c.c.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS
CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING
REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO
SPECIFIC ITEMS ON THIS LIST.
3) OPEN-HOLE SOTLS REPORT REOUIRED AT FOOTING INSPECTION TO VERIFY
1,5OO P.S.F. SOIL BEARING CAPACITY. PROVIDE COPY OF ENGINEER'S
REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION.
4) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT
FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL
INSPECTION & CERTIFICATE OF OCCUPANCY.