November 12,2012
Down to Earth Landscapingand Construction
Attn: Pat Seubert
P. O. Box 680
Basalt, Colorado 81621
G¡l s ú¡lelqlutosrul¡Es.ça.rn)
Job No, 112 4l3A
Subject: Obsel'vation of Excavation, Proposed Shop Building, Lot 5 Hawkriclgc,
5 Red Wing Lane, Garf,reld County, Colorado
Dear Pat:
As requested, a representative of Hepworlh-Pawlak Geotechnical, Inc. observed theexcavation at the subject site on Novemb er 7,2012 to evaluate the soils exposed for
foundation suppoft. The findings of our observations and recorrunendations for thEfoundation design are presented in this repoú. The services were perforrned in
accordance with our agreemeut firr professional engineering serviôes to Down to Earth
Landscaping and Construction, datecl November 6,-2012.
The shop building will be located north of tlie existing residence and west of the existing
gârage at the site. The building will be a single story steel û'ame and metal structure with
a slab-on-grade floor- The structure has been designecl to be supported on spreacl footings
assuming an allowable soil bearing pressure of 2,000 psfì An existing slab will be used aspart of the floor slab for tl-re building.
At the time of our site visit, tlie foundation excavation which was essentially cornplete
had been cut in one level about 3 feet below the adjacent ground surface. The soils
exposed in the bottom of the excavation consistecl of stiff, sandy silty clay with scatterecl
gravel and srnall cobbles. The soils were calcareous. Results of swcll-consoliclation
testing performed on samples taken fi'om the site, shown on Figure l, indicate the soils
are slightly to moderately cotnpressible under conclitions of loacting and wetting. The
sample showed a minor swell potential when wetted under a constant 1,000 psflurcharge.
No fi'ee water was encountered in the excavation and the soils were slightly inoist.
Considering the conditions exposed in the excavation and the nature of the proposecl
construction, spread footings placed on the unciisturbed natural soil clesigneà fot. un
allowable bearing pl'essul'e of 2,000 psf can be used for support of the proposecl buildi¡g.
The exposed soils may tend to expand or colnpress solne *ñ"n wetted and there could be
some post-construction movetnent of the fbunclation if the bearing soils become wet.
Precautions should be taken to prevent wetting of the bearing soils.
i',,¡i,' j.ll ,.il,lr,, : i,,l,rlliirr'.i,¡,,,.,1. ri.,i,11,,,,, .,i.,,t.!1,,¡:,, r.-r 1i,., trì.rr
Down to Earth Landscaping and Construction
November 12,201?
Page 2
Footings should be a minimurn width of 18 inches for continuous walls and 2 feet for
columns. The minor swell potential encountered in the sample tested can be disregarded
in the foundation design. Loose and disturbed soils in footing areas should be removed
and the bearing level extended down to the undisturbed natural soils, and the subgrade
compacted. The bearing soils should be protected against fiost and concrete should ¡ot
be placed on frozen soils. Exterior footings should be provided with adequate soil cover
above their bearing elevations for frost protection. Continuous foundation walls should
be reinforced top and bottom to spân local anomalies such as by assuming an unsupported
length of at least 12 feet. A perirneter foundation drain around the "slab-át-grade,'
building should not be needed. Structural fill placed within floor slab a.eas ian consist of
the on-site soils compacted to at least 95Yo of standarcl Proctor density (SPD) at a
moisture content near optimurn. There could be some differential movement between the
existing slab and new floor areas especially if the subgrade becomes wetted which should
be considered in the design. Backfill placed around the structure should be compacted to
at least 90% SPD and the surflace graded to prevent ponding within at least tO feèt ofthe
building. Landscape that requires regular heavy irrigation,ìuch as sod, and sprinkler
heads should not be located within 5 feet of the foundation.
The recommendations submitted in this letter are based on our obseryation of the soils
exposed within the foundation excavation and do not include subsurface exploration to
evaluate the subsurface conditions within the loaded depth of foundation influence. This
study is based on the assumption that soils beneath the footings have equal or better
suppott than those exposed. The risk of foundation movement may be greater than
indicated in this report because ofpossible variations in the subsurface conditions. In
otder to reveal the nature and extent of variations in the subsurface conditions below the
excavation, drilling would be requirecl. It is possible the data obtained by subsurface
exploration could change the recommendations contained in this letter. Our serices do
not include determining the presence, prevention or possibility of mold or other biological
contaminants (MOBC) developing in the fi¡ture. If the client is concerned about MOBC,
then a professional in this special field of practice shoulcl be consulted.
If you have any questions or neecl ñrrther assistance, please call our office.
Sincerely,
HEPWORTH _ PAWLAK CAL, INC
David A. Young, P
DAY/ljg
attaclllent Figure 1,
Jolr No. 112 413A
n Test Results
eåFtecn
Moisture Content =
Dry Density =
-200=
17.4
105
88
Sample of Sandy Silty Ctay
From: Bottom of Excar,ation
percent
pcÍ
percent
1
rôo\
2o
a)z
fLX
UJ
Izo
U)Ø
[rJEfLEoO
0
2
ù
4
5
10
APPL¡ËD PHES$URE ( ksf )
0.1 1.0 100
112 413A SWELL-CONSOLI DATION TEST RESUTTS FIGURE 1