Loading...
HomeMy WebLinkAboutCorrespondenceCoweg uu) Colleen W¡Éh From: Sent: To: Cc: Subject: Attachments: du.t ¡'¡¡u*) Mike Arbaney < mike@coloradostructu ral.com > Tuesday, June B, 2021 4:52PM Colleen Wirth; l2solutions.co@gmail.com Tmize@clearybuilding.com; bigblockjoe23 @gmail.com [External] Re:Joseph Pinney - new construction house on existing foundation Pinney letter.pdf r-erl t Ar',) Attached is a revised letter for your records. Please let me know if you need anything else. Thanks, Mike Arbaney Mike Arbaney P.E. Colorado Structural, Inc. reI: (910)349-5922 fax: (970)349-5926 mike@coloradostructrral. c om From : Col I ee n Wi rth <cwí rth @ ga rfie I d-cou nty.com> Date: Tuesday, June 8, 2O2Lat 3:37 PM To: Mike Arbaney <mike@coloradostructural.com>, "l2solutions.co@gmail.com" <l2solutions.co@gmail.com> Cc: "Tmize@clearybuilding.com" <Tmize@clearybuilding.com>, "bigblockjoe23@gmaíl.com" <bigblockjoe23@gma il.com> Subject: Joseph Pinney - new construction house on existing foundation BLRE-05-2L-6860 - LL77 County Road 259 (Rifle, Colorado) Sending message to Mike Arbaney, Site Engineer of Record; Andy Hunt, contractor; Cleary Building Representative; and Joseph Pinney, owner: I am finishing the code review for the home replacement at tL77 County Road 259, and request more information: L.Need a stamped letter or direct emailfrom Mike Arbaney, (P.E. engineer of record who supplied existing foundation system approval), to convey he has reviewed Cleary Building Corporations "concrete bracket attachment detail" on Sheet 121dated 4lt2/202L and to verify and confirm this attachment detail to the existing foundation is adequate. Michael's letter received alludes to a metal building, and we wish to confirm the two systems are structurally compatible. Email response can be se nt d i rectly to cwi rth @ga rfie ld-co u nty. com. 2. We found multiple references to the design snow load in the plan drawings. Please be aware, Garfield County Building Department policy is Snowload (measured at Roof Pf, not ground Pg), with 40 PSF up fl1 't# ,*ùh 3 to 7,000 feet elevation. As the proposed building has pre- engineered roof trusses, have engineering for the inspector at time of frame inspection. The inspector wÍll verífy and confirm 40 PSF. lnformation provided for future truss installation, no further revisions at this time. Thank you! After further discussion with our building inspectors, be advised more detail will be required during construction: A. Supply house wrap, flashing and siding details for the buildíng inspector at time of the first footing / foundation píer inspection. B. Supply window/ door headers, wall frame opening detail for the building inspector at time of frame inspectíon. C. As bare minimum detail was included for the buíldíng's thermal envelope and proposed insulation materials, we highly encourage the contractor read through the PLAN ATTACHMENT stapled to the approved FIELD COPY of plans for any and all references to insulation R-Values and window / door U-factors. Comment #3 above does not require sending us more details prior to buílding permit issuance, but shall be received during the foundation and framing inspections. contìhm Colleen Wirth Plans Examiner Garfield County Building Division 108 8th Street, Suíte 401 Glenwood Springs, CO 8L601" cwi rth (@sa rf iel d-cou ntv. com office (970) 945-1377 ext. 16L0 2