HomeMy WebLinkAboutApplication>iFUJz=,
s$oäJ>-uJb
-2¡À3ú,¿
óË
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
ltg7ol945-8212
www.ga rf ield-cou ntv.com
Gurfield County
TYPE OF GRADING
tr MAJOR D MINOR
INVOLVED PARTIES
Property Owner:Strait Bottom Ranch, LLLP Phone p70 ) 970-618-0494
Mailing Address PO Box 26 Woody Creek, CO 81656
EmailAddress:cou lteryou ng @gmai l.com
contractor: lnterConnection Systems lnc Phone:1309-l 946-3974
Mailing Address 181418th Road, Central City NE 68826
EmailAddress:trent@isi.consulting
Architect: Phone: (_)_
Mailing Address
EmailAddress:
n""r. Kyle Crawford Phone:1651 )
203.6021
Engi
Mailing Address:1919 University Avenue W, Ste 300, St Paul, MN 55104
EmailAddress:kcrawford@eorinc.com
PROJECT NAME AND TOCATION
Project N
Describe
Pivot Solar 1 and Pivot Solar 3 - MIPA-08-20-880
Work:3.0Mw AC Community Solar Garden-Consisting of
approximately 6,750 solar panels with a total production not to exceed
3.0Mw, as well as inverters and ground-mounting tracking system
us¡ng single axis tracker
Job Address:No Address. Approx. Location - 39"24'51.38" N 108'5'17.08" W
Assesso¡rs Parcel N umber:240923300098
Sub Lot _Block
Earthwork (square feet) :61,855 Earthwork (Cubic Yards):695
ALL UTILITIES MUST BE LOCATED PRIOR TO ANY GRADING
NOTICE
Authoritv. ThisapplicationforaBuildingPermitmustbesignedbytheOwneroftheproperty,describedabove,or
anauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedbythe
Owner, must be provided with this Application.
Legal Access. ABuildingPermitcannotbeissuedwithoutproofof legal andadequateaccesstothepropertyfor
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (L) State Electrical Permit, (2) County OWTS Perm¡t,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
VoidPermit. ABuildingPermitbecomesnull andvoidiftheworkauthorizedisnotcommencedwithinlS0daysof
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
I hereby acknowledge that I have read and understand the Notice and Certif¡cat¡on above as wel¡ as
have provided the required information which is correct and accurate to the best of my knowledge.
l\4ary Bosety (Jun 9, 2021 N4 DT)
Property Owner Print and Sign Date
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulationsand applicable land use regulations (County Regulation(s)). lacknowledgethatthe Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
CERTIF¡CATION
OFFIC¡AL USE ONIY ?1 o tc.c,
o
à)-,
/]"tæT.
itions:CondSpecial fn0ul.-Fnt)4]¿v /r?41.ctLÞî)t 5Io*/7FSg-t'-tr2B,voA-¡¡O NJL C4*Ð o D D7 ÃJSs
,+,p)qþ@?u
Total Fees:t 4oo.Lo
Fees Paid:$rloo.goMisc Fees:Permit Fee:Ànnä
lssue Date:ahb/2t Zoning:
F-u R^L-
Balance dúe:+Á Grading Permit
çr<AD- çr¿A
ê-tL-ÞzìBUILDING / PLANNING DIVISION
J f
Oate
Andy Schwaller
From:
Sent:
To:
Subject:
Attachments:
Vince Hooper
Wednesday, June 16, 20217:51 AM
Andy Schwaller; Glenn Hartmann; Philip Berry
RE: MIPA-08-20-BB0B-Pivot Solar 1 &2
LUCP PIVOT.pdf;ACC_321054_NTP_PS1-3_20210506.pdf;ACC-321054-Permit-PS1-3-
20210506.pdf; ACC-321 054-lssuance-PS1 -3-20210506.pdf
Andy,
The Land Use Change Permit was approved and recorded last week. Attached are the documents that I received for the
CDOT permit. No reveg security. They will do weed management. There is no water and nothing else will grow. The array
systems are driven piles without much of any grading. Chris Hale reviewed the civil plans and did not raise concerns
about any grading issues. They do have a SWMP with the LUCP.
víncent l-fooper, PMP
Garfield County
Planner lll
108 8th Street, Suite 401
Glenwood Springs, CO
81601
(970)94s-L377 xt6L4
From: Andy Schwaller <aschwaller@garfield-county.com>
Sent: Tuesday, June 15,2O2t4:2tPM
To: Glenn Hartmann <ghartmann@garfield-county.com>; Vince Hoopercvhooper@garfield-county.com>; Philip Berry
<pberry@ga rfie ld-cou nty.co m>
Subject: MIPA-08-20-8808-Pivot Solar 1 &2
I think I asked about this one already but could not find an old email. They have applied for a grading permit. I can find
the land use application but could not find a land use permit. Patrick was involved last summer with the project. My
screams for PATRICK go unanswered but I do get a weird stare from Philip and Sheryltells me to shut up.
I could not find an access permit from CDOT and was also concerned if a reveg security was obtained with the land use
permit. Also, the grading is usually reviewed as part of the land use permit, but they did submit a grading permit for me
to look at.
Help if you can. Thanks,
Andy
1