Matt:
lf you cut the overhang back to 4.5 ft then double It 718" T[/2IO at L6" o.c. work. (Also, single TJI/ 360 at L6" o.c.)
lf you keep the 6 ft overhang, then you will need to add I-117/8" LVL to each rafter at L6" o.c.. Doubling up the 210's
wíll not work.
Gypsum drywall is adequate for the two locations you asked about.
Thank you,
Ernie
Ernest Kollar Engineers, lnc.
320 Main Street, Suite 203
Carbondale, CO 81623
(970) 963-3223 phone
(970) 379-7368 cell
erniekollar(Osmail, com
On Mon, Mar L, 2021at 10:12 AM Matt Jurmu <matt@ianckilaconstruction.com> wrote
Hi Ernie,
Not to pester, rather I wanted to reach out to confirm you did receive my email re: wall sheathing as well as roof TJ's.
Please advise.
Thanks,
Matt Jurmu