Loading...
HomeMy WebLinkAboutCorrespondence with Engineer Regarding Wall SheathingMatt Jurmu From: Sent: To: Subject: Ernest Kollar < erniekollar@gmail.com > Monday, March 1,2021 12:45 PM Matt Jurmu Re: Lot 38 Spring Ridge Permit Plans Matt: lf you cut the overhang back to 4.5 ft then double It 718" T[/2IO at L6" o.c. work. (Also, single TJI/ 360 at L6" o.c.) lf you keep the 6 ft overhang, then you will need to add I-117/8" LVL to each rafter at L6" o.c.. Doubling up the 210's wíll not work. Gypsum drywall is adequate for the two locations you asked about. Thank you, Ernie Ernest Kollar Engineers, lnc. 320 Main Street, Suite 203 Carbondale, CO 81623 (970) 963-3223 phone (970) 379-7368 cell erniekollar(Osmail, com On Mon, Mar L, 2021at 10:12 AM Matt Jurmu <matt@ianckilaconstruction.com> wrote Hi Ernie, Not to pester, rather I wanted to reach out to confirm you did receive my email re: wall sheathing as well as roof TJ's. Please advise. Thanks, Matt Jurmu # J4N,ç#tlA O: 970.927.671,4 50 Sunset Drive, Ste 3 1 C: 970.456.2676 Basalt, Co81'621'